Neom prioritises rail construction work

13 June 2023

 

Register for MEED's guest programme 

Neom has reduced the scope of work for upcoming construction contracts on the infrastructure corridor alongside The Line as it prioritises the delivery of certain elements of the 170-kilometre-long project.

Firms working on the infrastructure corridor, which is known as The Spine, have been informed that the length of tunnelling has been reduced by 37 kilometres (km), the number of stations to be developed has been reduced to nine from 48, and the freight rail will share the same infrastructure as the high-speed rail.

The commuter line, known as the Group Mass Transit, will be completed later.

Phased delivery

A spokesperson for Neom said: “The Line is a long-term endeavour, and along with The Spine, is being delivered in phases. Neom is currently engaging leading rail suppliers to execute the detailed design and delivery of phase one for the high-speed passenger and freight rail systems, to ensure the resilience of the network.”

MEED reported in May that Neom has invited companies to submit bids in October for contracts to provide rolling stock for the high-speed and freight railways running alongside The Line and connecting to the Oxagon industrial city development.

As well as the provision of rolling stock, the contract covers the electrification, signalling and control systems for the Connector South and The Spine. The Spine is the infrastructure corridor running parallel to The Line that includes the high-speed rail, while the Connector South links Oxagon to The Line.

Ongoing activity

For the civil works, there are several construction packages at various stages. MEED reported in early May that a joint venture of Italy-based Webuild and Riyadh-headquartered Shibh al-Jazira Contracting (Sajco) had secured a contract to build the Connector South. The infrastructure corridor will run south from The Line to Neom City Station through Neom Bay Mansions, Neom Bay airport and on to Oxagon.

In April, Neom invited selected contractors to submit bids to complete tunnels that will serve as the railway junction connecting The Spine with the Neom Connector, known as the Delta Junction.

The project involves 26.5km of tunnelling work that will be split into two lots, one for the north and the other for the south.

The work will be completed in five sections, each involving about 5km of tunnels excavated through hard rock using drill-and-blast and cut-and-cover techniques.

Contractors are also bidding for The Line's cut-and-cover tunnel sections. These works are divided into contracts known as Type A, Type B and Type C. Some will be completed using concrete cast on site, while others will be built using precast concrete sections.

https://image.digitalinsightresearch.in/uploads/NewsArticle/10936993/main.gif
Colin Foreman
Related Articles
  • Contractors submit best offers for Oxagon Highway 55

    19 November 2026

     

    Contractors have submitted their best and final offers for a design-and-build contract to upgrade Highway 55 in Saudi Arabia’s Oxagon region.

    The first phase of the project includes the construction of 14 kilometres of road, with two lanes in each direction, as well as one bridge and three interchanges.

    The project is expected to take 22 months to complete.

    Contractors initially submitted bids on 28 September, as MEED exclusively reported.

    Highway 55 connects the Red Sea coast with the mainland in northwestern Saudi Arabia. It is currently the only road providing north-south connectivity between Duba and the Neom region.

    MEED reported exclusively in August last year that contractors had submitted responses to an expression of interest notice that Neom had issued earlier that month.

    The project is expected to support cargo movement from Duba Port to other parts of the kingdom and the wider region.

    Last year, Neom tested a pilot initiative by handling a shipment that travelled from Cairo via the Port of Safaga, across the Red Sea to the Port of Neom, and then inland to Erbil, Iraq.

    In a statement, Neom said: “The shipment travelled through an intermodal corridor spanning over 900 kilometres, marking a significant milestone in the kingdom’s transformation into a regional and global logistics hub.”


    READ THE NOVEMBER 2026 MEED BUSINESS REVIEW – click here to view PDF

    Gulf projects keep moving amid conflict; UAE's state spending and oil output flexibility cushion Iran war shock; Project finance lenders weigh risk against infrastructure needs.

    Distributed to senior decision-makers in the region and around the world, the November 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/21556022/main.jpg
    Yasir Iqbal
  • Construction starts on Damascus hotel and mall

    19 November 2026

    Construction has started on the Movenpick Hotel and Arab Mall development in the Kafr Sousa district of Damascus.

    Rotana Star Holding and Sankari Holding are backing the project, which Syria’s Ministry of Tourism is developing under its patronage.

    The project marks Accor’s entry into the Syrian market. The France-based hotel group signed an agreement earlier this year to manage the project’s Movenpick Hotel component.

    The integrated development will cover more than 90,000 square metres (sq m) and combine hotel, retail, entertainment and supporting facilities.

    The Movenpick Hotel will occupy more than 25,000 sq m and include 300 accommodation units. Facilities will include event and celebration halls, restaurants with panoramic views, and health and fitness amenities.

    Arab Mall will cover more than 65,000 sq m across seven levels. It will include retail units, entertainment facilities and service areas.

    The developers expect Arab Mall to open in the first quarter of 2028, followed by the hotel in the first quarter of 2029.

    Accor acquired the Swiss-founded Movenpick brand in 2018. Under the management agreement, Accor will operate the hotel and provide access to its global reservation, distribution and marketing platforms.

    The development is expected to create direct and indirect employment across construction, engineering, hospitality, retail and services.

    The project is being advanced as Syria seeks to expand its tourism and hospitality capacity.

    Syria’s Ministry of Tourism has reported that the country received 3.52 million visitors in the first half of 2026, 111% more than in the same period of 2025.

    The ministry said foreign tourist arrivals increased by 448%, while Arab visitor numbers rose by 107%.


    READ THE NOVEMBER 2026 MEED BUSINESS REVIEW – click here to view PDF

    Gulf projects keep moving amid conflict; UAE's state spending and oil output flexibility cushion Iran war shock; Project finance lenders weigh risk against infrastructure needs.

    Distributed to senior decision-makers in the region and around the world, the November 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/21555695/main.jpeg
    Yasir Iqbal
  • Kuwait discusses retender of $7.7bn of oil projects

    19 November 2026

     

    State-owned upstream operator Kuwait Oil Company (KOC) is discussing the retendering of upstream projects worth an estimated $7.7bn, according to industry sources.

    The tender processes for all four contracts were cancelled earlier this year after the lowest bids exceeded the projects’ approved budgets.

    The projects are:

    • Separation Gathering Centre 1 (SGC-I) and Water Injection Plant (WIP-1)
      Previous low bidder: Tecnicas Reunidas (Spain) – $2.47bn
    • Separation Gathering Centre 3 (SGC-3) and Water Injection Plant (WIP-3)
      Previous low bidder: Larsen & Toubro (India) – $2.48bn
    • Installation of Water Injection Plant (WIP-4)
      Previous low bidder: Petrofac (UK) – $1.48bn
    • Effluent Water Disposal Plants 1 & 2 expansion project (EWDP 1&2)
      Previous low bidder: Larsen & Toubro (India) – $1.30bn

    KOC is considering a strategy under which pipeline and network installation work would be removed from the main contract scopes and tendered separately, the sources said.

    The company is also planning to relaunch the four main packages under a build-own-operate model rather than the engineering, procurement and construction (EPC) model used previously.

    KOC is expected to tender the pipeline and network packages on an EPC basis, or under a similar delivery model.

    In addition, KOC is discussing increases to the projects’ approved budgets to enable contractors to submit compliant bids, the sources said.

    Since KOC cancelled the four tenders in January, Kuwait’s oil and gas sector and the wider economy have faced disruption linked to the regional conflict that began after the US and Israel attacked Iran on 28 February.

    The conflict has reduced shipping through the Strait of Hormuz, limiting Kuwait’s ability to export crude oil.


    READ THE NOVEMBER 2026 MEED BUSINESS REVIEW – click here to view PDF

    Gulf projects keep moving amid conflict; UAE's state spending and oil output flexibility cushion Iran war shock; Project finance lenders weigh risk against infrastructure needs.

    Distributed to senior decision-makers in the region and around the world, the November 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/21532374/main.jpg
    Wil Crisp
  • Saudi Arabia cancels more water tenders

    19 November 2026

     

    Two tenders for a major water pipeline project in Saudi Arabia have been cancelled, marking the second major water infrastructure project in the kingdom to have its tender process called off this month.

    The tenders cover Package B and the combined Packages C1 and C3 of the New Water Pipeline to Feed Riyadh City 2 project, being developed by Water Transmission Company (WTCO). 

    A source close to the project told MEED that bidders were notified of the decision earlier in November.

    The three packages have a combined value of about $556m and involve the construction of a long-distance potable-water transmission system to strengthen supplies to Riyadh.

    The wider masterplan includes approximately 136 kilometres of pipeline, with diameters ranging from 64 inches to 100 inches. The scope also includes 10 steel storage tanks with capacities ranging from 100,000 cubic metres to 170,000 cubic metres.

    According to regional tracker MEED Projects, Saudi Services for Electro-Mechanic Works was appointed as the main contractor for Package B in 2025, with a reported contract value of $279.6m. Another local firm, Al-Rawaf Trading & Contracting, was appointed for Packages C1 and C3, with a combined contract value of $276m. Multiple other contractors submitted bids for the three packages.

    As MEED understands, construction was expected to start earlier this year.

    The cancellations follow the withdrawal of a tender for a 300-million-litres-a-day seawater reverse osmosis desalination plant at Yanbu, valued at $272m.

    As reported by MEED on 16 November, Saudi Water Authority cancelled the Yanbu tender despite India’s VA Tech Wabag receiving the contract award in July 2025.

    The contractor disclosed the decision in a filing to Indian stock exchanges, saying the tender was cancelled due to “internal reasons” on the authority’s side.

    It is the second time a tender has been cancelled for the project at the final award stage.

    It is unclear whether the desalination or transmission-pipeline projects will be retendered and, if so, whether their scopes will remain unchanged. MEED has contacted WTCO for comment.


    READ THE NOVEMBER 2026 MEED BUSINESS REVIEW – click here to view PDF

    Gulf projects keep moving amid conflict; UAE's state spending and oil output flexibility cushion Iran war shock; Project finance lenders weigh risk against infrastructure needs.

    Distributed to senior decision-makers in the region and around the world, the November 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/21527730/main.jpg
    Mark Dowdall
  • Contractors submit bids for Neom wastewater plant

    18 November 2026

     

    Register for MEED’s 14-day trial access 

    At least five contractors or contractor consortiums have submitted bids for a contract to build a wastewater treatment plant for Oxagon, Neom’s industrial cluster.

    According to a source, bids were submitted on 9 November.

    The industrial wastewater treatment package will have an initial capacity of 35,000 cubic metres a day (cm/d) and is being procured by Enowa, Neom’s energy and water utility. The project is estimated to cost up to $165m.

    Enowa issued the request for proposals earlier this year, with an initial October deadline, as exclusively reported by MEED.

    The bidders and bidding consortiums include: 

    • Alfanar (Saudi Arabia) / Lanke (China)
    • Alkhorayef (Saudi Arabia)
    • Orascom (Egypt) / Wabag (India)
    • Safari (Saudi Arabia) / Veolia (France)
    • Wetico (Saudi Arabia) / Satco (Saudi Arabia)

    UAE-based Tecton Engineering and India’s Ion Exchange had also previously expressed interest in bidding for the contract.

    The wastewater treatment capacity will be supplied in modular trains of 5,000 cm/d each. A separate sanitary wastewater treatment package will have a capacity of 1,000 cm/d.

    The contract is structured as a design-build-operate project and covers the supply, installation and commissioning of industrial and sanitary wastewater treatment packages, as well as three years of operation and maintenance.

    The procurement appears to take a reworked approach to wastewater treatment at Oxagon Industrial Quarter, with the modular and demountable facility designed to provide “interim wastewater treatment” capacity.

    This includes treatment systems that can be installed and later removed or relocated as Oxagon’s requirements evolve. The plant can be expanded to a maximum capacity of 45,000 cm/d.

    Some of the same contractors are also expected to submit qualification documents to Neom Green Hydrogen Company (NGHC) for a smaller interim wastewater treatment plant and disposal system at Oxagon Industrial Quarter.

    NGHC recently issued a request for qualification for an engineering, procurement and construction contract, with a bid submission deadline of 22 November.

    The planned facility is designed to handle a combined wastewater flow of 14,530 cm/d from cooling water blowdown and industrial wastewater.

    Other major developments in the industrial cluster include the $8.5bn Neom Green Hydrogen project, which completed construction in August and is targeting commercial operations in 2027, and a planned artificial intelligence data centre campus being developed by Humain and DataVolt.


    READ THE NOVEMBER 2026 MEED BUSINESS REVIEW – click here to view PDF

    Gulf projects keep moving amid conflict; UAE's state spending and oil output flexibility cushion Iran war shock; Project finance lenders weigh risk against infrastructure needs.

    Distributed to senior decision-makers in the region and around the world, the November 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/21525188/main.jpg
    Mark Dowdall