Kuwaiti banks enter bounce-back mode
10 August 2023

With low levels of non-performing loans (NPLs) and improving funding metrics, 2023 is proving to be a solid year for Kuwaiti banks. At the same time, the promise of project-related lending is also starting to firm up on the horizon.
Profitability is trending in the right direction, with half-year results in 2023 revealing robust performances for the largest banks in the tightly knit firmament of 11 Kuwaiti banks.
While unlikely to repeat last year’s growth levels, which saw net income increase by 25.3 per cent on average thanks in part to bulging interest margins, lower loan impairments and a continued focus on cost efficiencies, this year’s six-month reporting cycle indicates double-digit growth will be repeated for the full year.
National Bank of Kuwait (NBK), the country’s largest lender, reported a 16 per cent increase in first half 2023 profits to KD275.3m ($895.3m), as interest income rose. Total assets in the first half increased by 5.3 per cent to KD36.1bn ($117.4bn).
As NBK chief executive Isam al-Sager noted: “Strong business growth, robust liquidity and prudent levels of asset quality will continue to drive profit growth throughout 2023.”
Robust fundamentals
Improving NPL metrics – already the lowest in the GCC – and solid funding growth are driving improvements for the country’s banks.
The IMF noted in an assessment earlier this year that banks remain well capitalised and liquid — comfortably exceeding prudential regulatory requirements. Last year, the average capital adequacy ratio was 17.3 per cent, above the 12 per cent limit required by the Central Bank of Kuwait (CBK).
NPLs remain low by regional standards, at least in part because Kuwait’s small and medium-sized enterprise (SME) sector is not as vibrant as some other Gulf states, meaning fewer insolvent customers to deal with. The average bank’s customer portfolio comprises Kuwaiti nationals who work in solid government jobs and are considered low-risk customers.
Another supporting factor in terms of asset quality is the solid performance of Kuwait’s real estate sector, which has relatively little exposure to foreign investments – removing the risk of speculation-driven increases affecting the banking market.
On a note of caution, Ashraf Madani, vice-president and senior credit officer at Moody’s Investors Service, says there have been some issues for Kuwaiti banks with foreign operations, in Turkey and Egypt, for instance.
“Foreign currency translations have also impacted capital. So we saw a slight decline in the capital ratio over the past two to three years. But there’s still strong capitalisation,” he says.
“Most banks have large corporate borrowers that have been in the business for quite some time. They have established long-term relationships with the banks, and the portfolio has good seasoning.”
The funding side is also improving, Madani notes, and this year there seems to be higher growth from the deposit side compared to the credit side, which is slightly favourable for the funding of banks.
Growth in the pipeline
Lending to the private sector should remain strong, despite a series of interest hikes that have grown by 250 basis points since the global monetary policy tightening cycle began in 2022.
Lending growth averaged a healthy 7.7 per cent last year, although this year will not be as high.
“This year, our expectation is that the credit growth in the system will be around 3 per cent,” says Madani.
“That’s for two reasons. Number one is that we don’t expect the exceptional growth last year to continue on the consumer side because we’re coming from a high base already in 2022.
“And number two, there are some repayments on the corporate side this year, and these are basically offset by some good project awards on the corporate side. There are some big projects awards happening this year.”
Another push for credit growth will come from a new mortgage law, under which local lenders can provide a housing loan of up to KD140,000 ($455,000) and on which the state will cover the interest for the first KD70,000 ($227,000) on behalf of the borrower.
An increase in project awards this year could technically drive credit higher, but expected tepid growth on the consumer side will likely exert a smothering effect on total loan performance.
On the regulatory side, the Central Bank’s regular review of the adequacy of its financial regulatory perimeter and macroprudential policy toolkit have won the IMF’s plaudits.
The fund said the CBK will continue to regularly stress test the banking system's resilience to emerging financial stability risks, and said the existing blanket guarantee on bank deposits should be gradually replaced with a limited deposit insurance framework to address moral hazard.
Meanwhile, the interest rate cap on commercial loans should be phased out to support efficient risk pricing and credit supply to SMEs.
Though NBK, once the largest GCC bank by assets, has been overtaken in size by the region’s emergent banking behemoths such as the UAE’s First Abu Dhabi Bank and Saudi National Bank, it and other national heavyweights remain active lenders with a keen interest in servicing economic opportunities in Kuwait and beyond.
Big ticket mergers are not in the pipeline this year, but after the tumult of recent years, Kuwaiti lenders will be happy with stable, if unspectacular, growth.
Exclusive from Meed
-
Kuwait awards $381m oil project23 September 2026
-
Kuwait refinery project on track for year-end completion23 September 2026
-
Contractor wins $208m Almoosa hospital MEP contract23 September 2026
-
UAE to develop integrated waste-to-resource pilot23 September 2026
-
Contractors prepare Oxagon Highway 55 bids23 September 2026
All of this is only 1% of what MEED.com has to offer
Subscribe now and unlock all the 153,671 articles on MEED.com
- All the latest news, data, and market intelligence across MENA at your fingerprints
- First-hand updates and inside information on projects, clients and competitors that matter to you
- 20 years' archive of information, data, and news for you to access at your convenience
- Strategize to succeed and minimise risks with timely analysis of current and future market trends
Related Articles
-
Kuwait awards $381m oil project23 September 2026
Register for MEED’s 14-day trial access
State-owned upstream operator Kuwait Oil Company (KOC) has awarded an oil project contract worth KD117m ($381m) to India’s Megha Engineering & Infrastructure (Meil).
The Supreme Purchasing Committee for Kuwait Petroleum Corporation (KPC) approved the contract last month, paving the way for the official award.
The project focuses on a water separation unit at the Al-Rawdatain facility in Kuwait.
The water separation facility will be developed at Gathering Centre 25 (GC-25), along with a pumping facility at GC-30.
The project will deliver a wide-ranging upgrade of processing and utility infrastructure, including new low-pressure separation and gas-handling equipment such as a three-phase wet separator package, a gas knock-out drum and associated low-pressure gas pipelines, as well as a high-integrity pressure protection system and a high-pressure flare.
Meil will develop the new three-phase low-pressure wet separation facility at GC-25.
The main process equipment will include two wet separator packages, each with a capacity of 150,000 barrels of liquid a day, and a low-pressure gas knock-out drum with a capacity of 53 million standard cubic feet a day, together with associated gas-handling facilities.
The facility will also incorporate an effluent water treatment and transfer system, including an effluent water balance tank equipped with microbubble flotation and induced gas flotation systems, as well as transfer pumps.
Additional GC-25 facilities will include fuel gas treatment, chemical injection, oil recovery and flare connections, along with firewater and deluge systems.
The scope also covers control and safety systems, substations, and associated civil, structural, mechanical, electrical and instrumentation works.
At GC-30, the project will focus on treated-water filtration and high-pressure injection infrastructure.
The scope includes nutshell filters and associated feed pumps with a combined capacity of approximately 500,000 barrels of water a day.
Booster and injection pumps will transfer treated effluent water to designated injection wells.
Additional facilities at GC-30 will include fuel gas treatment, sludge collection and disposal systems, oil recovery systems, control and safety systems, substations, laboratory and workshop facilities, and associated civil, structural, piping, mechanical, electrical and instrumentation works.
The project also includes transfer pipelines connecting GC-25, GC-15 and GC-30.
Meil will carry out modifications to existing tanks at GC-30, as well as process and utility tie-ins, electrical and instrumentation modifications and other infrastructure required to integrate the new facilities with KOC’s existing assets.
Meil’s responsibilities cover the project lifecycle from design and engineering through procurement, construction, testing, pre-commissioning, commissioning, start-up and performance testing.
The contract also includes operation, maintenance, repair and insurance responsibilities for the designated facilities during the applicable operations and maintenance period.
Seven companies submitted bids for the project last November.
The full list of bids was:
- Meil (India) – KD117m ($381m)
- Mechanical Engineering & Contracting Company (Kuwait) – KD130m
- Spetco (Kuwait) – KD158m
- Al-Kharafi (Kuwait) – KD164m
- China Oil HBP Science & Technology (China) – KD169m
- Alghanim International (Kuwait) – KD169m
- Jereh Oil & Gas Engineering (China) – KD191m
In October last year, KOC awarded Meil a separate contract for a project to develop a gas sweetening and recovery facility in west Kuwait.
Meil submitted the lowest bid for that tender, at KD69.2m ($225.5m), in February 2025.
https://image.digitalinsightresearch.in/uploads/NewsArticle/19911322/main.jpg -
Kuwait refinery project on track for year-end completion23 September 2026

A $65m project to replace a substation at the Mina Al-Ahmadi (MAA) refinery is on schedule to be mechanically complete before the end of the year, according to industry sources.
The project is being executed by India’s Larsen & Toubro (L&T), which was awarded the contract in October 2024.
One source said: “This project is approaching completion and is currently on schedule to be completed before the end of the year, although it could still see delays related to the ongoing regional conflict.”
The client is state-owned downstream operator Kuwait National Petroleum Company (KNPC).
Kuwait’s Ministry of Electricity, Water & Renewable Energy (MEW) is also involved in the project and will provide final approvals and sign-off.
The scope of the project includes:
- Construction of a substation
- Installation of transformers
- Installation of medium-voltage switchgear
- Installation of low-voltage auxiliary systems
- Installation of network protection systems
- Installation of disconnecting switches
- Installation of surge arrestors
- Installation of feeder breakers and cubicles
- Installation of low-voltage A/C and D/C equipment
- Installation of battery banks and battery chargers
- Installation of related relay and control panel boards
- Installation of fire alarm and fire protection equipment
- Installation of a SCADA system
- Installation of cables
- Civil works
- Associated facilities
The current project to replace a substation at the MAA refinery closely resembles another project tendered by KNPC more than a decade ago, which L&T also won.
On 18 May 2015, KNPC signed a contract with L&T to build a new 240MW substation at the MAA refinery, valued at KD21.866m.
The new substation, known as M20, was designed to replace an existing substation that was considered old and obsolete.
Mohammed Al-Mutairi, who was KNPC’s chief executive at the time, said the substation building would be explosion-proof and use state-of-the-art control systems.
He said the station’s capacity would increase from 180MW to 240MW, supplying most of the refinery’s electricity needs.
Given the similarities between the two projects, L&T has been able to reuse some designs, creating efficiencies, according to industry sources.
https://image.digitalinsightresearch.in/uploads/NewsArticle/19911319/main.jpg -
Contractor wins $208m Almoosa hospital MEP contract23 September 2026
Register for MEED’s 14-day trial access
Riyadh-based construction firm BEC Arabia has won a SR781m ($208m) contract for the mechanical, electrical and plumbing (MEP) works at Almoosa Hospital in Al-Khobar.
Saudi Arabia’s Almoosa Health Company awarded the contract.
The hospital complex consists of two towers: a 24-storey in-patient tower with 380 beds, and an 11-storey tower with 224 clinics and 113 additional treatment spaces.
It will be built on a 45,000-square-metre site.
A podium spanning the ninth and 10th floors will connect the two towers.
The hospital will also include parking for 1,700 cars.
BEC Arabia won the SR656m ($175m) main construction contract for the hospital in November last year.
In August 2025, MEED reported that Almoosa Health Company had announced it had secured a sharia-compliant credit facility worth SR650m ($173m) from Banque Saudi Fransi.
In a statement published on the Saudi stock exchange (Tadawul), the company said the seven-year facility would be used to support its expansion and growth strategy.
Lebanon’s Dar, US-based Perkins&Will and French design firm Pierre-Yves Rochon designed the project.
https://image.digitalinsightresearch.in/uploads/NewsArticle/19910889/main.jpg -
UAE to develop integrated waste-to-resource pilot23 September 2026
Emirates Biotech and United Arab Emirates University (UAEU) have launched a pilot project in Al-Ain that could provide a model for larger waste-to-resource facilities.
The project involves developing the UAE’s first integrated organic-waste valorisation pilot plant, which will test whether food waste and compostable packaging can be processed together to recover resources and reduce waste sent to landfill.
Located near the UAEU campus, the 40kg-a-day facility will process organic waste to produce renewable biogas and nutrient-rich compost. The project is intended to generate technical and operating data that could support the development of larger-scale facilities.
Emirates Biotech and UAEU will design, build and operate the pilot plant as part of a two-year research project running from August 2026 to August 2028. Installation and commissioning are expected to be completed by August 2027.
The plant will combine anaerobic digestion and composting. Anaerobic digestion will convert the organic waste into renewable biogas, while the resulting digestate will be composted to produce nutrient-rich compost.
A laboratory-scale assessment will also examine the potential to convert the biogas into renewable hydrogen.
Food waste accounts for nearly 40% of daily municipal solid waste in the UAE, according to Emirates Biotech, and much of it is currently disposed of in landfills.
The pilot will therefore assess the technical and operational feasibility of recovering value from two waste streams through a single integrated process.
If successfully scaled, Emirates Biotech says an integrated organic-waste valorisation plant could reduce CO₂ emissions by 89% compared with landfilling.
The project is expected to provide a scalable and modular model for converting food waste and compostable packaging into renewable biogas and compost, with the findings intended to inform the development of larger waste-to-resource facilities.
https://image.digitalinsightresearch.in/uploads/NewsArticle/19908972/main.jpg -
Contractors prepare Oxagon Highway 55 bids23 September 2026

Contractors are preparing to submit bids on 28 September for a design-and-build contract for permanent upgrade works on Highway 55 in the kingdom’s Oxagon region.
The first phase of the project includes constructing 14 kilometres of road, with two lanes in each direction. It also includes one bridge and three interchanges.
The project duration is 22 months.
Highway 55 connects the Red Sea coast with the mainland in northwestern Saudi Arabia. It is currently the only road providing north-south connectivity between Duba and the Neom region.
MEED reported exclusively in August 2025 that contractors had submitted responses to an expression of interest notice that Neom had issued earlier that month.
The project is expected to support cargo movement from Duba Port to other parts of the kingdom and the wider region.
Last year, Neom tested a pilot initiative by handling a shipment that travelled from Cairo via the Port of Safaga, across the Red Sea to the Port of Neom, and then inland to Erbil, Iraq.
In a statement, Neom said: “The shipment travelled through an intermodal corridor spanning over 900 kilometres, marking a significant milestone in the kingdom’s transformation into a regional and global logistics hub.”
The Port of Neom is located on the Red Sea near the Arar border, a key entry point into Iraq.
https://image.digitalinsightresearch.in/uploads/NewsArticle/19907876/main.jpg