Saudi chemical project contract awarded

28 August 2024

Register for MEED's 14-day trial access 

Saudi Arabia’s Sahara International Petrochemical Company (Sipchem) has awarded the main contracts for a project to expand propylene and polypropylene plants in the Jubail area.

The contracts use the engineering, procurement and construction (EPC) model and will expand plants operated by Al-Waha, one of Sipchem’s affiliate companies.

The expansion project will boost production capacity at the facility by 72,000 tonnes of propylene and 150,000 tonnes of polypropylene.

The contracts were awarded to South Korea’s SGC eTEC Company and its subsidiary SGC Arabia and were worth a total of $169m, according to a stock market filing.

The contract duration is 28 months and the total production capacity after the expansion will be approximately 537,000 tonnes of propylene and 600,000 tonnes of polypropylene.

In its filing, Sipchem said: “This project reflects Sipchem's continuous efforts to enhance its production capacity and efficiency.

“Increased polypropylene production will contribute significantly to many industries, including automotive, fiber and food packaging films.

“This expansion will strengthen the company's position in the market and support its growth strategy.”

Chemicals expansion

In February, Advanced Polyolefins Company, a subsidiary of Saudi Arabia’s Advanced Petrochemical Company, awarded SGC eTEC Company the main contract for building an isopropanol plant in the kingdom’s Jubail Industrial City.

Under the terms of that award, SGC eTEC Company, along with its local unit SGC Arabia, will perform EPC works on the planned isopropanol facility.

The value of that EPC contract is $191.25m, Saudi Exchange-listed Advanced said in a filing on 18 February.

The isopropanol facility will have an output capacity of 70,000 tonnes a year (t/y) and use technology provided by Thyssenkrupp Uhde Engineering Services.

The duration of the EPC works is 32 months, with the commissioning of the project expected to take place in the last quarter of 2026.

Advanced first announced the isopropanol project in October 2020. The plant will be part of Advanced Polyolefins Company’s upcoming greenfield petrochemicals facility in Jubail.

SGC eTEC Company is also executing the main contract for a project to expand an ethylene cracker facility that is operated by Saudi Ethylene & Polyethylene Company (SEPC) in the Jubail area.

In February, SGC eTEC Company awarded Saudi Arabia's Al-Rushaid Construction Company (ARCC) a subcontract to perform construction works on the project.

SEPC awarded an approximately $500m contract to SGC eTEC Company, on 21 December last year, to perform the main EPC works on the project.

Tasnee Sahara Olefins Company (TSOC) is the majority shareholder in SEPC, owning a 75% stake. The remaining 25% stake is held by Dutch-American chemicals producer LyondellBasell.

https://image.digitalinsightresearch.in/uploads/NewsArticle/12418942/main.jpg
Wil Crisp
Related Articles
  • Libya oil licensing rounds to be launched in 2027 and 2028

    26 November 2026

    Libya is preparing to launch a public bidding round for discovered, undeveloped and marginal oil fields next year, according to Masoud Suleman, chairman of the National Oil Corporation (NOC).

    This will be followed by a separate exploration bidding round set for early 2028, Suleman told a conference in Tripoli.

    Suleman stated that NOC has entered into an agreement with US engineering firm KBR to draft an upstream production expansion plan. The state oil company has also hired US advisory firm K2 Integrity to carry out monitoring, auditing and gap analysis across NOC’s financial systems.

    During the conference, NOC signed a memorandum of understanding (MoU) with Honeywell to collaborate on technical training, workforce development and industrial modernisation. A separate MoU was signed with US energy technology firm Baker Hughes, focusing on strategic training and project execution, coinciding with the opening of Baker Hughes’ new regional office in Tripoli.

    On downstream infrastructure, Suleman said Libya is seeking approximately $5bn in phased investment to modernise the Zawiya and Ras Lanuf refineries. NOC is courting external investors while exploring self-financing options to upgrade facilities and reduce reliance on imported refined products. Libya currently imports around 80% of its fuel requirements.

    Subject to securing capital, upgrading the Zawiya plant would allow it to meet roughly 70% of domestic gasoline demand within two to 2.5 years, Suleman said. He added that rehabilitation work is already underway at Ras Lanuf to lift domestic gasoline and diesel yields. By contrast, Libya has achieved self-sufficiency in liquefied petroleum gas (LPG) and aviation fuel, leaving surplus volumes available for export.

    Beyond refining, NOC is targeting an increase in crude oil production to 2 million barrels a day, alongside raising natural gas output to 4 billion cubic feet a day (cf/d), from the current 2.5 billion cf/d.

    Licensing rounds

    Earlier this year, MEED reported that consultations with London-headquartered international oil companies (IOCs) were playing a key role in shaping plans for Libya’s next licensing round.

    Representatives from Shell and BP travelled to Libya in September as part of a Libyan British Business Council delegation.

    During the trip, the oil companies’ representatives met with officials from Libya’s NOC.

    Masoud Suleman was formally appointed chairman in October last year, having served as acting head since January 2025. Shortly after his interim appointment, NOC announced the results of its previous licensing round – the country’s first in 17 years – awarding five of the 22 blocks on offer.

    Amid the US and Israel’s ongoing conflict with Iran and the ongoing war between Russia and Ukraine, oil assets in North Africa have become increasingly appealing to IOCs.

    Disruptions to oil and gas exports through the Strait of Hormuz have severely affected a range of countries, including Qatar, the UAE, Saudi Arabia, Iraq and Kuwait.

    Some North African officials have promoted their oil and gas sectors as reliable alternative suppliers.

    In August, Libya’s Oil and Gas Minister Khalifa Abdel Sadig told a conference in Norway that Libya could be a “key player in providing energy security solutions” to the European Union.


    READ THE NOVEMBER 2026 MEED BUSINESS REVIEW – click here to view PDF

    Gulf projects keep moving amid conflict; UAE's state spending and oil output flexibility cushion Iran war shock; Project finance lenders weigh risk against infrastructure needs.

    Distributed to senior decision-makers in the region and around the world, the November 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/21817509/main.jpg
    Wil Crisp
  • Contractors submit World Cup stadiums upgrade works

    25 November 2026

     

    Contractors have submitted bids for contracts covering upgrade works on two stadiums that will host games for the Fifa World Cup 2034.

    Saudi Arabia’s Sport Ministry tendered the contracts earlier this month, as MEED reported.

    The two tenders cover upgrade works at Prince Faisal bin Fahad (PFBF) Stadium in Riyadh and King Khalid University Stadium in Abha.

    The bid submission deadline was 22 November.

    PFBF Stadium is located in the northern section of King Abdullah Park in the Al-Malaz area of Riyadh. It is expected to have a capacity of approximately 47,000 spectators and host Round of 32 matches during the 2034 Fifa World Cup.

    The project was originally tendered last year as a public-private partnership under a design, build, finance, operate and maintain model. It will now proceed under a conventional engineering, procurement and construction contract.

    King Khalid University Stadium is expected to be upgraded to accommodate more than 45,400 spectators. It is scheduled to host Round of 16 matches. The stadium is in southeastern Abha, in Asir Province.

    Saudi stadium plans

    In August 2024, MEED reported that Saudi Arabia planned to build 11 stadiums and refurbish four existing venues for the 2034 tournament. Eight venues will be located in Riyadh, four in Jeddah, and one each in Al-Khobar, Abha and Neom.

    An additional 10 cities will host team base camps: Al-Baha, Jazan, Taif, Medina, AlUla, Umluj, Tabuk, Hail, Al-Ahsa and Buraidah. Across the kingdom, organisers plan to deploy 134 training sites, comprising 61 existing facilities and 73 new builds.

    Saudi Arabia was officially selected to host the Fifa World Cup 2034 tournament during an online convention of member associations at the Fifa Congress on 11 December 2024.


    READ THE NOVEMBER 2026 MEED BUSINESS REVIEW – click here to view PDF

    Gulf projects keep moving amid conflict; UAE's state spending and oil output flexibility cushion Iran war shock; Project finance lenders weigh risk against infrastructure needs.

    Distributed to senior decision-makers in the region and around the world, the November 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/21802750/main.jpg
    Yasir Iqbal
  • Larsen & Toubro wins Kuwait oil refinery contract

    25 November 2026

     

    India-based Larsen & Toubro has been awarded a contract tendered by state-owned downstream oil company Kuwait National Petroleum Corporation (KNPC), according to information released by the country’s Central Agency for Public Tenders.

    The project scope covers engineering, supply, installation and commissioning assistance required to replace the regenerator in fluid catalytic cracking unit 86 at the Mina Al-Ahmadi (MAA) refinery.

    Larsen & Toubro submitted a low bid of KD9,810,000 ($31.9m).

    The only other bidder was South Korea’s YuhanTech Company, which submitted a bid of KD10,478,000.

    Kuwait’s Heavy Engineering Industries & Shipbuilding Company (Heisco) has been awarded a subcontract on the project worth $KD1.916m ($6.23m), according to a separate stock exchange filing.

    Heisco’s contract runs for 24 months, according to the filing.

    The MAA refinery was upgraded and integrated with Kuwait’s Mina Abdulla (MAB) refinery as part of the $16bn Clean Fuels Project.

    This project, brought online in 2021, increased MAB’s capacity to 454,000 barrels a day (b/d) and the MAA refinery’s to 346,000 b/d.


    READ THE NOVEMBER 2026 MEED BUSINESS REVIEW – click here to view PDF

    Gulf projects keep moving amid conflict; UAE's state spending and oil output flexibility cushion Iran war shock; Project finance lenders weigh risk against infrastructure needs.

    Distributed to senior decision-makers in the region and around the world, the November 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/21780193/main.png
    Wil Crisp
  • NWC extends bid deadline for sewage treatment package 14

    25 November 2026

     

    State-owned National Water Company has extended the bid submission deadline for package 14 of Saudi Arabia’s long-term operations and maintenance (LTOM) sewage treatment programme, according to sources.

    The new submission deadline is 3 January. Bids had been expected by 30 November.

    Known as Eastern A Cluster (LTOM14), the state-owned National Water Company (NWC) tendered the package in April, with an initial submission deadline of 30 September.

    The contract covers upgrading six existing sewage treatment plants (STPs), including a capacity expansion of 30,000 cubic metres a day (cm/d) at the Al-Jarodia STP.

    This will increase total treatment capacity from about 263,000 cm/d to approximately 293,000 cm/d, with an estimated cost of $180m.

    According to sources, up to six firms are preparing to submit bids, including:

    • Alkhorayef Water & Power Technologies (Saudi Arabia)
    • Civil Works Company (Saudi Arabia)
    • Kuzu (Turkiye)
    • Miahona (Saudi Arabia)
    • Ramky Infrastructure (India)
    • Wabag (India)

    The latest phase follows the formal signing of a $347m contract between NWC and a Saudi-Chinese consortium for Northern Cluster Sewage Treatment Plants Package 10 (LTOM10) on 2 September.

    Sources confirmed to MEED that the same consortium led by United Water (China) is not planning to bid for LTOM14. The group previously won the contract for package 11, which will have a combined capacity of about 440,000 cm/d. It is expected to formally sign a contract for LTOM11 in the coming months.

    In October, MEED exclusively reported that local contractor Al-Yamama had won the contract for package 12 of Saudi Arabia’s LTOM sewage treatment programme.

    Under the original scope, the contract covers the construction and upgrade of seven sewage treatment plants with a combined capacity of about 162,000 cm/d.

    NWC also recently issued the main contract tender for package 16 of the programme.

    According to a source, bidders for LTOM16 must submit a letter of intent by 22 February 2027, with bid submissions due by 3 May 2027.


    READ THE NOVEMBER 2026 MEED BUSINESS REVIEW – click here to view PDF

    Gulf projects keep moving amid conflict; UAE's state spending and oil output flexibility cushion Iran war shock; Project finance lenders weigh risk against infrastructure needs.

    Distributed to senior decision-makers in the region and around the world, the November 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/21760551/main.jpg
    Mark Dowdall
  • Dubai evaluates Tasreef drainage bids

    24 November 2026

     

    Up to eight stormwater and drainage projects under the next phase of Dubai Municipality’s AED30bn ($8.2bn) Tasreef programme have moved into the bid evaluation stage in recent weeks as procurement activity continues to drive the wider water infrastructure sector.

    The projects cover major stormwater drainage networks, pumping stations, storage tanks and sewerage infrastructure. They include schemes serving Dubai South, Abu Hail, the area surrounding Dubai International airport, Dubailand and Al-Awir.

    According to regional project tracker MEED Projects, the eight tenders have an estimated combined value of at least $800m. The tenders cover the following projects:

    • DS-316-C1: Drainage networks serving Hind 4
    • TF-24-C1: Connections to the stormwater network in Dubailand
    • TF-25-C1: Stormwater trunk line serving Hind 3, Hind 4 and Umm Al-Daman
    • TF-07-C1: Strategic stormwater drainage network between Sheikh Mohammed bin Zayed Road and Emirates Road
    • TF-21-C1: Stormwater system upgrade and rehabilitation in Abu Hail
    • TF-30-C1: Stormwater storage tanks serving the Dubai International airport area
    • TF-06-C2: Stormwater drainage system connecting Al-Maktoum International airport and Dubai South
    • DS317-C1: Sewerage and stormwater infrastructure in New Al-Awir 1st

    According to sources, local firms Nael Construction & Contracting, Al-Nasr Contracting and Arifco Building Contracting are among those that submitted bids for the Dubailand stormwater network project (TF-24-C1) in October. The bidders for this tender do not include the local DeTech Contracting, which won the estimated $350m engineering, procurement and construction contract for a package on Al-Wasl Road (TF-15-C1), earlier this year.

    On 29 October, DeTech, Mohammed Abdulmohsin Al-Kharafi & Sons and Green Oasis General Contracting Company were among those that submitted bids for TF-07-C1, sources told MEED.

    It is undersood that both DeTech and Kharafi also submitted offers on 12 November for a contract to upgrade and rehabilitate the stormwater system in Abu Hail (TF-21-C1). The Abu Hail project comprises a stormwater pumping station with a total discharge capacity of 26 cubic metres a second. The wider project involves a major stormwater gravity drainage network, including large-diameter pipelines, and is estimated to cost up to $163m.

    Meanwhile, the the municipality is preparing to receive bids for a further scheme (TF-06-C1) on 26 November, involving the construction of a stormwater pond connecting Al-Maktoum airport and Dubai South. Al-Nasr Contracting and Green Oasis are among those preparing to bid, sources said.

    In October, the municipality confirmed it had awarded four contracts worth AED3bn ($817m) to expand the emirate’s stormwater drainage network by about 100 square kilometres under phase three of the Tasreef programme.

    The projects will cover Jumeirah, Umm Suqeim, Al-Quoz, Al-Barsha, Al-Wasl and Al-Marmoom. The works include constructing and extending main stormwater drainage lines with diameters of up to 3 metres.

    The Tasreef programme aims to increase the emirate’s stormwater drainage capacity by 700% and reduce costs associated with pumping stations, network operations and maintenance by 20%.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/21756439/main.jpg
    Mark Dowdall