Saudi Arabia receives 4.5GW solar and wind prequalifications
22 October 2024
On 22 October, utility and renewable energy developers submitted their statements of qualifications (SOQs) for the contracts to develop five renewable energy independent power projects (IPPs) in Saudi Arabia.
Saudi Arabia's principal buyer, Saudi Power Procurement Company (SPPC), issued the prequalification request for the IPPs making up the sixth round of the kingdom's National Renewable Energy Programme (NREP) on 29 September.
Firms that are understood to have submitted SOQs include international developers such as Japan's Marubeni and Jera; France's EDF Renewables, Engie and TotalEnergies Renewables; as well as Chinese and local utility developers.
The projects, comprising four solar photovoltaic (PV) IPPs and one wind IPP, will have a total combined capacity of 4,500MW.
The following schemes comprise the NREP's sixth round:
- 1,500MW Dawadmi wind IPP (Riyadh)
- 1,400MW Najran solar PV IPP (Najran)
- 600MW Samtah solar PV IPP (Jizan)
- 600MW Al-Darb solar PV IPP (Jizan)
- 400MW Al-Sufun solar PV IPP (Hail)
SPPC is responsible for the pre-development, tendering and subsequent offtaking of the energy from the projects.
US/India-based Synergy Consulting is providing financial advisory services to SPPC for the NREP sixth-round tender. Germany's Fichtner Consulting and US-headquartered CMS are providing technical and legal consultancy services, respectively.
SPPC revealed the following lowest and second-lowest bidders for the contracts to develop four solar PV projects under the fourth round of the NREP on 21 October.
2,000MW Al-Sadawi solar IPP (Eastern Province)
- L1: Abu Dhabi Future Energy (UAE)/Korea Electric Power Corporation (Kepco, South Korea)/GD Power Development (China): $c1.29 a kilowatt-hour (kWh)
- L2: SPIC Huanghe Hydropower Development (China)/EDF Renewables (France): $c1.31/kWh
Al-Masaa solar IPP (Hail): 1,000MW
- L1: SPIC/EDF Renewables (France): $c1.36/kWh
- L2: AlJomaih Energy & Water (local) / TotalEnergies Renewables (France): $c1.40/kWh
Al-Hinakiyah 2 solar IPP (Medina): 400MW
- L1: SPIC/EDF: $c1.51/kWh
- L2: Masdar/Kepco/Nesma: $c1.57/kWh
Rabigh 2 solar IPP (Mecca): 300MW
- L1: AlJomaih Energy & Water / TotalEnergies Renewables: $c1.78/kWh
- L2: Masdar/Kepco/Nesma: $c1.89/kWh
MEED previously reported that SPPC plans to award the NREP round-five contract before the end of the year.
Photo: Pixabay
Exclusive from Meed
-
UAE 2025 country profile and databank
3 January 2025
-
Saudi Arabia 2025 country profile and databank
2 January 2025
-
Tunisia 2025 country profile and databank
2 January 2025
-
Qatar 2025 country profile and databank
31 December 2024
-
Jordan 2025 country profile and databank
30 December 2024
All of this is only 1% of what MEED.com has to offer
Subscribe now and unlock all the 153,671 articles on MEED.com
- All the latest news, data, and market intelligence across MENA at your fingerprints
- First-hand updates and inside information on projects, clients and competitors that matter to you
- 20 years' archive of information, data, and news for you to access at your convenience
- Strategize to succeed and minimise risks with timely analysis of current and future market trends
Related Articles
-
UAE 2025 country profile and databank
3 January 2025
https://image.digitalinsightresearch.in/uploads/NewsArticle/13175290/main.jpeg -
Saudi Arabia 2025 country profile and databank
2 January 2025
https://image.digitalinsightresearch.in/uploads/NewsArticle/13175271/main.gif -
Tunisia 2025 country profile and databank
2 January 2025
https://image.digitalinsightresearch.in/uploads/NewsArticle/13175280/main.gif -
Qatar 2025 country profile and databank
31 December 2024
https://image.digitalinsightresearch.in/uploads/NewsArticle/13175251/main.gif -
Jordan 2025 country profile and databank
30 December 2024
https://image.digitalinsightresearch.in/uploads/NewsArticle/13175149/main.gif