Riyadh looks to adjust investment approach

11 September 2025

 

Yasir Al-Rumayyan, governor of Saudi Arabia’s Public Investment Fund (PIF), is preparing to set out a new investment approach for the $1tn sovereign wealth fund he runs, telling an event in Washington on 8 September that “in the coming two months or so, we will set the new strategy for the PIF”.

It will be a significant moment given the scale of the fund’s investments in the Saudi economy, which were worth some SR2.8tn ($747bn) at the end of last year.

Al-Rumayyan described it as “a continuation from the original strategy”, but, as yet, has not provided any further details. The fact that the state-owned fund is planning to change or evolve could, however, be taken as an implicit acknowledgement that all is not going as planned for the government’s efforts to remodel the economy.

There have been a number of other recent signs of trouble, not least for the PIF and the other stalwart of the economy, Saudi Aramco.

The PIF’s recent annual report for 2024 showed a 19% rise in assets under management to SR3.4tn, but the fund also cut the valuation of its gigaprojects by 12%, amid well-documented problems at some of its key projects.

On 5 August, Aramco meanwhile reported a 14% year-on-year fall in net profits for the first half of 2025 to $48.7bn, amid a 15% drop in average oil prices. Despite that, its dividend payments crept up by 4%, while its debts increased by 25% to $3bn. 

Seen together, such developments point to some wider problems with the government’s Vision 2030 diversification strategy, launched in 2016. In recent years, the PIF has been steadily increasing its domestic investments – in large part because international investors have not been putting money into the Saudi economy at anywhere near the rate hoped. Changing that trend is a critical test for Riyadh, but is also more difficult to pull off at a time of lower oil prices.

There have been a lot of changes in the business environment in a short period of time and it can take a bit of time to bed down and for people to get comfortable with that
Toby Iles, Jadwa Investment

The Ministry of Investment reported on 3 September that inward foreign direct investment (FDI) had grown by 24% last year to reach SR119bn ($31.7bn), but that is still a long way short of the annual target of $100bn by 2030.

Amine Mati, the IMF’s mission chief for Saudi Arabia, said at an event hosted by the Arab Gulf States Institute in Washington on 4 September that “FDI is coming, it's still not the numbers that we would like to see”.

The reforms brought in over recent years may yet help to turn this around, but it is taking longer than some in Riyadh might hope.

“There have been a lot of changes in the business environment in a short period of time and it can take a bit of time to bed down and for people to get comfortable with that,” said Toby Iles, chief economist at Riyadh-based Jadwa Investment.

“I think it's important to reserve a bit of judgement on the FDI numbers for now and, of course, to remember that that 2030 target is both very high and also the target for 2030, not for now.”

Grounds for optimism

There are nevertheless various more positive signs in the market. Inflation appears to be contained at around 2%, home ownership levels are rising and unemployment is at a record low, with youth and female unemployment rates halving over the past four years.

Overall, the Saudi economy – like those of the rest of the GCC – has so far avoided being too badly affected by regional instability or the global trade tensions prompted by US President Donald Trump’s tariffs.

This can be seen in the continued growth in non-oil activity. According to the latest IMF report on the Saudi economy, released in early August, non-oil GDP grew by 4.5% last year, driven by the retail, hospitality and construction sectors. Public and private sector investments in transport systems, supply chains and new industries from tourism to electric vehicles are helping to underpin economic activity.

Opec+ production cuts caused a 4.4% decline in oil GDP last year and left overall growth at around 2%, but the voluntary cuts have been unwound and Saudi crude output is now rising. Mati pointed out that a 1 million b/d increase in production can offset a $10 drop in oil prices: “People always talk about oil price, but forget to talk about oil production.”

The IMF’s short-term forecast is for GDP to grow by 3.6% this year and 3.9% in 2026, helped by robust domestic demand, including government-led projects, and higher oil production. Others are predicting slightly higher numbers. Naif Alghaith, chief economist at Riyad Bank, said: “We expect maybe it's a bit higher: maybe just slightly shy of 5%.”

Economic activity is being supported by fairly robust public spending, which has not dipped in the way it has in previous periods of lower oil prices. The IMF expects the budget deficit to be around 4% of GDP this year, but Mati said “there’s no need to cut spending to get back to the deficit target”, with the reforms and adjustments already made likely being enough to stabilise the situation without further action, he said.

Project spending is significantly down this year, but Dubai-based bank Emirates NBD has said spending on projects will remain a key driver of Saudi Arabia's economic growth. The country has around $443bn-worth of projects under execution, according to MEED Projects – with the majority of them in the power, construction and gas sectors, not in the PIF’s troubled gigaprojects portfolio. The country has a further $208bn-worth of project work in the prequalification and bidding phases and due for imminent award.

For all the efforts to encourage more private sector, non-oil activity, the main factors that will govern the trajectory of the economy in the coming years remain oil prices and government spending.

“The government's pretty mindful of striking this balance between pushing the economic transformation agenda and maintaining strong fiscal external metrics,” said Iles.

“I think the speed of travel for the economy is a function of how that pans out, and obviously, the oil market is part of the determinant of where the speedometer ends up.”


MEED’s October 2025 special report on Saudi Arabia also includes:

> BANKING: New funding sources solve Saudi liquidity challenge
> GAS: Saudi Arabia and Kuwait accelerate Dorra gas field development
> CONSTRUCTION: Saudi construction pivots from gigaprojects to events
> TRANSPORT: Infrastructure takes centre stage in Saudi strategy

https://image.digitalinsightresearch.in/uploads/NewsArticle/14648442/main.gif
Dominic Dudley
Related Articles
  • Dubai evaluates Tasreef drainage bids

    24 November 2026

     

    Up to eight stormwater and drainage projects under the next phase of Dubai Municipality’s AED30bn ($8.2bn) Tasreef programme have moved into the bid evaluation stage in recent weeks as procurement activity continues to drive the wider water infrastructure sector.

    The projects cover major stormwater drainage networks, pumping stations, storage tanks and sewerage infrastructure. They include schemes serving Dubai South, Abu Hail, the area surrounding Dubai International airport, Dubailand and Al-Awir.

    According to regional project tracker MEED Projects, the eight tenders have an estimated combined value of at least $800m. The tenders cover the following projects:

    • DS-316-C1: Drainage networks serving Hind 4
    • TF-24-C1: Connections to the stormwater network in Dubailand
    • TF-25-C1: Stormwater trunk line serving Hind 3, Hind 4 and Umm Al-Daman
    • TF-07-C1: Strategic stormwater drainage network between Sheikh Mohammed bin Zayed Road and Emirates Road
    • TF-21-C1: Stormwater system upgrade and rehabilitation in Abu Hail
    • TF-30-C1: Stormwater storage tanks serving the Dubai International airport area
    • TF-06-C2: Stormwater drainage system connecting Al-Maktoum International airport and Dubai South
    • DS317-C1: Sewerage and stormwater infrastructure in New Al-Awir 1st

    According to sources, local firms Nael Construction & Contracting, Al-Nasr Contracting and Arifco Building Contracting are among those that submitted bids for the Dubailand stormwater network project (TF-24-C1) in October. The bidders for this tender do not include the local DeTech Contracting, which won the estimated $350m engineering, procurement and construction contract for a package on Al-Wasl Road (TF-15-C1), earlier this year.

    On 29 October, DeTech, Mohammed Abdulmohsin Al-Kharafi & Sons and Green Oasis General Contracting Company were among those that submitted bids for TF-07-C1, sources told MEED.

    It is undersood that both DeTech and Kharafi also submitted offers on 12 November for a contract to upgrade and rehabilitate the stormwater system in Abu Hail (TF-21-C1). The Abu Hail project comprises a stormwater pumping station with a total discharge capacity of 26 cubic metres a second. The wider project involves a major stormwater gravity drainage network, including large-diameter pipelines, and is estimated to cost up to $163m.

    Meanwhile, the the municipality is preparing to receive bids for a further scheme (TF-06-C1) on 26 November, involving the construction of a stormwater pond connecting Al-Maktoum airport and Dubai South. Al-Nasr Contracting and Green Oasis are among those preparing to bid, sources said.

    In October, the municipality confirmed it had awarded four contracts worth AED3bn ($817m) to expand the emirate’s stormwater drainage network by about 100 square kilometres under phase three of the Tasreef programme.

    The projects will cover Jumeirah, Umm Suqeim, Al-Quoz, Al-Barsha, Al-Wasl and Al-Marmoom. The works include constructing and extending main stormwater drainage lines with diameters of up to 3 metres.

    The Tasreef programme aims to increase the emirate’s stormwater drainage capacity by 700% and reduce costs associated with pumping stations, network operations and maintenance by 20%.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/21756439/main.jpg
    Mark Dowdall
  • Muscat financial centre opens for business

    24 November 2026

    The International Financial Centre of Oman (IFC Oman) has opened its headquarters at Al-Mouj Business Park in Muscat and registered its first 13 companies.

    Sayyid Theyazin bin Haitham Al-Said, Oman's Deputy Prime Minister for Economic Affairs and chairman of IFC Oman, opened the headquarters on 23 November. The ceremony also marked the official start of company registration, which allows local and international businesses to set up within the centre's jurisdiction.

    The first 13 companies received their certificates of incorporation at the event. The centre was set up by Royal Decree No. 8/2026 in January, so the move from setting up a legal framework to taking in businesses has taken 10 months.

    Registration follows royal decrees that put in place IFC Oman's operating law, regulatory law and courts law. Five core regulations sit alongside them and cover operations, companies, partnerships, foundations and interpretation. Together they set the rules for setting up and running a business in the centre, including corporate governance, regulatory obligations and dispute resolution.

    Businesses can apply through a new digital registry platform. A separate regulatory framework for financial services is still being drafted, and licensing for those activities is expected to start in early 2027.

    Finance Minister Sultan bin Salim Al-Habsi, who is vice-chairman of IFC Oman, said the decision by 13 companies to join from the start "reflects the strength of the business and investment environment the centre offers".

    "We will maintain this momentum as we complete the regulatory framework ahead of the start of financial services licensing early next year," he said.

    Sayyid Theyazin said the framework "lays the foundation for a stable and competitive business environment" and will strengthen Oman's appeal to international investors and financial institutions.

    He also chaired a board meeting. It reviewed progress on finishing the centre's legal, regulatory and operational infrastructure and set priorities for attracting companies and investment.

    IFC Oman aims to connect the national economy more closely to international capital and to support growth in financial and professional services, in line with the Oman Vision 2040 economic diversification programme.

    The centre goes up against established regional financial hubs, including Dubai International Financial Centre, Abu Dhabi Global Market and Qatar Financial Centre.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/21756636/main5305.gif
    Colin Foreman
  • Mecca university tenders water infrastructure projects

    24 November 2026

    Mecca-based Umm Al-Qura University has issued two tenders for wastewater and water storage infrastructure at its student campus in the Al-Abidiyah district.

    The first tender covers the second phase of the university’s main water storage scheme. The project involves building seven tanks with a combined capacity of 14,700 cubic metres.

    The scope includes three ground-level tanks with a total capacity of 7,500 cubic metres and four elevated tanks with a combined capacity of 7,200 cubic metres.

    It also includes a 2.1-kilometre backup water supply pipeline with a diameter of 400 millimetres, as well as pumping stations, inlet and outlet pipework, valves and water control systems.

    The second tender covers the construction of a wastewater treatment plant with a capacity of 4,000 cubic metres a day at the university’s student campus. The contract duration is listed as two years.

    The projects will expand the campus’s water infrastructure, adding storage capacity and wastewater treatment facilities to support its operational requirements.

    Both tenders were issued in November. Bids for the water storage tanks and wastewater plant are due by 14 December and 13 December, respectively.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/21752745/main.jpg
    Mark Dowdall
  • Oman’s OQT formalises Pakistan fuel supply agreement

    24 November 2026

    Oman's state-owned commodity trader OQT has signed a petroleum products supply agreement with Pakistan State Oil (PSO), the South Asian country's national oil marketing company.

    The deal was signed on 8 October and formally marked at a ceremony in Muscat on 22 November. It was made under the Oman-Pakistan intergovernmental framework and gives OQT a structured arrangement for supplying petroleum products to PSO.

    The two companies have yet to disclose the agreement's value, volumes or duration.

    The agreement builds on an existing trading relationship. OQT says it has supplied more than 1 million tonnes of gasoline to PSO in 2026.

    OQT also supplies Pakistan's liquefied petroleum gas (LPG) market, selling to both state-owned and private buyers. The company expects its LPG deliveries to Pakistan to pass 120,000 tonnes by the end of the year.

    "This agreement gives us a stronger framework to build on that relationship, combining OQT's international trading capabilities with PSO's position in the Pakistani market," said OQT chief executive Wail Al-Jamali.

    PSO chief executive Jawwad Ahmed Cheema said the partnership is now "formal, government-backed and built for the long term under the Oman-Pakistan Intergovernmental Agreement".

    "For PSO, this is about more than supply. It is about ensuring that Pakistan has the fuel it needs, when it needs it, on terms that protect our national interest," he said.

    Oman's Energy & Minerals Minister Salim Al-Aufi and Pakistan's Petroleum Minister Ali Pervaiz Malik attended the ceremony, along with Mulham Al-Jarf, deputy president of investment at the Oman Investment Authority, which owns OQT.

    The companies said the agreement will support reliable supply at a time of continued volatility in regional energy markets. They will now focus on implementation and deliveries, and will continue talks on wider petroleum and energy cooperation.

    OQT trades crude oil, refined products, petrochemicals, LPG, liquefied natural gas, fertilisers and carbon-related products, and is expanding into metals. It has offices in Muscat, Dubai, London, Rotterdam, Singapore, Houston and Shanghai.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/21750539/main1214.jpeg
    Colin Foreman
  • Contractors bid for Aramco-backed logistics hub

    24 November 2026

     

    Asmo, the logistics joint venture of Saudi Aramco and DHL Supply Chain, received proposals from contractors on 15 November for a contract to expand the logistics complex at King Salman Energy Park (Spark) in Saudi Arabia’s Eastern Province.

    The logistics hub will add over 124,000 square metres (sq m) at Spark.

    Al-Khobar-based engineering firm House of Consulting Office is the project consultant.

    The tender for the expansion works comes after Asmo awarded an estimated SR820m ($218m) contract to build the logistics complex’s first phase in May this year.

    The overall project will feature a 43,000 sq m, temperature-controlled Grade A warehouse; more than 3,000 sq m of offices and staff amenities; 5,300 sq m dedicated to chemicals storage; and an open yard covering about 1.2 million sq m.

    Asmo signed an agreement with Bahrain‑headquartered Arcapita Group Holdings in February to deliver the project at Spark.

    Planned for large-scale industrial use, the site is expected to incorporate advanced warehouse and building management systems, end-to-end digital connectivity, automation and robotics.

    It will also be developed in line with internationally recognised sustainability standards, featuring solar photovoltaic readiness, electric-vehicle charging infrastructure and a target of Leed Gold certification.

    The development aims to support the next stage of Saudi Arabia’s logistics and supply chain expansion.

    Under the deal structure, Arcapita will provide funding and retain ownership of the asset, while Asmo will develop the facility and then lease and operate it under a 22-year occupational lease.

    According to a statement, “the scheme will be executed via a forward-funding model, underscoring a long-term commitment to national infrastructure”.

    Asmo added that this will be its first purpose-built logistics centre and one of four strategic locations planned to anchor its nationwide logistics network, aligned with the National Transport and Logistics Strategy under Saudi Vision 2030.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/21747071/main.gif
    Yasir Iqbal