PIF’s 2025 results back 2026-30 strategy shift
3 July 2026
Saudi Arabia’s Public Investment Fund (PIF) has published its audited consolidated financial statements for the year ended 31 December 2025, the first full set of annual results to follow the board’s approval of the fund’s 2026-30 strategy.
The results show a sharp improvement in profitability last year even as leverage rose and volatility in its listed equity holdings widened. The performance helps explain the strategic shift towards capital discipline and focus on private sector partnerships set out in April.
In April, PIF’s board, chaired by Crown Prince Mohammed Bin Salman Al-Saud, approved a new five-year strategy structured around three portfolios, the Vision Portfolio, the Strategic Portfolio and the Financial Portfolio, and organised around six domestic ecosystems: tourism, travel and entertainment; urban development and liveability; advanced manufacturing and innovation; industrials and logistics; clean energy, water and renewables infrastructure; and Neom as a standalone ecosystem.
Project reprioritisation
The strategy followed a period of reprioritisation across PIF’s gigaproject portfolio and set out a renewed emphasis on private capital, with PIF stating it would “further enable the role of the private sector as an effective partner for sustainable economic development”.
PIF’s consolidated profit for 2025 rose to SR65.2bn ($17.4bn) in 2025, up 152% from SR25.8bn in 2024. The increase was driven by operating profit more than doubling, to SR78bn from SR34.7bn, as revenue growth outpaced cost of revenue and general and administrative expenses moderated relative to the prior year. Profit attributable to the owner of the fund rose to SR46.4bn, up from just SR1bn in 2024, a swing that accounts for most of the year-on-year improvement.
Total revenue, comprising SR312bn of operating revenue and SR137.9bn of income from investment activities, rose 8.8% to SR449.9bn. Core operating revenue alone was up 9.9%, from SR284bn in 2024.
Segment mix
The segment breakdown shows where that growth came from, and it lines up closely with the six ecosystems named in the 2026-30 strategy. Banking and financial services remained the largest single revenue line at SR85.3bn, followed by telecommunications at SR76.8bn ($20.5bn), which was down slightly on 2024. Mining revenue rose 19.3% to SR38.8bn, consistent with the strategy’s focus on industrials and logistics, while revenue from electronic gaming and related services held broadly flat at SR15.6bn, an area PIF governor Yasir Al-Rumayyan specifically cited as a sector for strategic investment alongside artificial intelligence and renewable energy. Agricultural and livestock revenue nearly tripled, to SR7.6bn from SR2.5bn, and revenue from events operations rose to SR7.6bn from SR6bn, both pointing to the diversification into domestic ecosystems the strategy describes. Real estate operations revenue and revenue from advanced electronics and aerospace both declined slightly year-on-year.
Total assets grew 5.1% to SR4.54tn from SR4.32tn, continuing the expansion PIF has reported since 2015, when the strategy document put assets under management at $150bn, against more than $900bn today. The two figures are not directly comparable, since the IFRS consolidated balance sheet captures the full assets of consolidated subsidiaries such as the fund’s banking, telecommunications and mining operations, while PIF’s publicly cited assets-under-management figure uses a different valuation methodology, but both point to the same order of scale.
Total equity, by contrast, fell 2% to SR2.63tn ($701bn) from SR2.68tn, despite the sharp rise in reported profit. The gap is explained by other comprehensive income, which swung to a loss of SR113.3bn for the year, driven primarily by a SR112.8bn fair-value loss on equity instruments measured at fair value through other comprehensive income. In other words, unrealised mark-to-market losses on part of PIF’s listed equity portfolio outweighed the operating profit improvement, leaving total comprehensive income attributable to the owner of the fund at a loss of SR64.7bn for the year, though this was narrower than the SR154.4bn loss recorded in 2024.
Total liabilities rose 16.7%, to SR1.91tn from SR1.64tn, driven mainly by loans and borrowings, which climbed 27.2% to SR725.3bn from SR570.4bn. Property, plant and equipment grew 6.3%, to SR429.6bn, reflecting continued capital spending across PIF’s real estate and gigaproject portfolio, including the stadium, hospitality and urban development programmes.
Strategy context
The scale of PIF’s investment activity in the run-up to 2025 is set out in the April strategy announcement rather than the financial statements themselves. Between 2021 and 2025, PIF says it invested more than $199bn in new projects in Saudi Arabia, contributed $243bn to real non-oil GDP and spent more than $157bn with the local private sector, alongside growing assets under management six-fold and delivering an annualised total shareholder return of more than 7% since 2017. Read against the 2025 results, the rise in mining, gaming, agricultural and events revenue is an early indication that this domestic ecosystem investment is beginning to show up in operating performance, even as the wider balance sheet shows the cost of that expansion in higher borrowing and greater sensitivity to listed equity markets.
The results reinforce a theme demonstrated by PIF’s ongoing award of construction contracts for Expo 2030, the 2034 Fifa World Cup and other gigaprojects in the kingdom. Growth is increasingly funded through a combination of retained earnings, debt and, with the new strategy, private co-investment, rather than balance-sheet expansion alone. The explicit retention of Neom as a named ecosystem in the 2026-30 strategy, despite the cancellation of several Trojena contracts and the loss of the Asian Winter Games over the past year, suggests PIF intends to continue funding the project, but within a more disciplined framework most likely centred on industrial development around the Port of Neom, which is also known as Oxagon.
The 2025 results and the 2026-30 strategy point to a fund entering a new phase: profit generation has improved markedly, but leverage has grown and comprehensive income remains exposed to swings in listed markets, both factors consistent with a strategy that emphasises capital efficiency, institutional excellence and a larger role for private capital rather than a further scaling-up of gigaproject spending on PIF’s own balance sheet.
Exclusive from Meed
-
Adnoc secures Thailand LNG supply deal9 October 2026
-
Fibrex wins $217m Abu Dhabi Seamont residences contract9 October 2026
-
Dubai picks contractor for Al-Maktoum airport terminal9 October 2026
-
Nakheel awards Dubai Islands marine works contract9 October 2026
-
Iraq refinery project given regional approval9 October 2026
All of this is only 1% of what MEED.com has to offer
Subscribe now and unlock all the 153,671 articles on MEED.com
- All the latest news, data, and market intelligence across MENA at your fingerprints
- First-hand updates and inside information on projects, clients and competitors that matter to you
- 20 years' archive of information, data, and news for you to access at your convenience
- Strategize to succeed and minimise risks with timely analysis of current and future market trends
Related Articles
-
Adnoc secures Thailand LNG supply deal9 October 2026
Abu Dhabi National Oil Company (Adnoc) has secured a deal with Thailand-based energy and infrastructure company Gulf Group to supply 2 million tonnes a year of liquefied natural gas (LNG), with deliveries starting in 2027.
The multi-year sale and purchase agreement (SPA), whose exact duration Adnoc did not disclose, builds on an initial LNG supply deal agreed between the two companies last year. The transaction was arranged through Adnoc’s integrated LNG marketing and trading platform, which was established in July within Abu Dhabi Global Market.
The hub integrates the marketing operations of Adnoc subsidiaries Adnoc Gas and XRG with the trading activities of Adnoc Trading. It targets a combined portfolio of 47 million t/y of marketable LNG by 2035. Adnoc Trading has developed an active third-party trading portfolio over the past four years, operating from commercial offices in Abu Dhabi, Singapore and Geneva.
ALSO READ: Adnoc signs energy agreements with Japan and South Korea
Separately, Adnoc has secured offtake commitments covering approximately 90% of the 9.6 million-t/y capacity planned for its low-carbon Ruwais LNG project.
In July, Adnoc signed a 15-year SPA with Japan’s Inpex Corporation for the supply of up to 1 million t/y from Ruwais. That contract marked Adnoc’s third long-term Ruwais supply agreement with a Japanese buyer, following deals with Osaka Gas and Mitsui & Co in March and April 2025, respectively. Together, the agreements with the three Japanese firms account for 2.4 million t/y – one-quarter of the terminal’s total capacity, which will be delivered across two 4.8 million-t/y liquefaction trains.
Adnoc has also secured long-term Ruwais LNG supply agreements with Malaysia’s Petronas, Germany’s EnBW Energie Baden-Wurttemberg and SEFE (Securing Energy for Europe), China’s ENN Natural Gas, UK-based Shell and Indian Oil Corporation.
Currently under construction in Ruwais Industrial City, Abu Dhabi, the facility is scheduled to begin commercial operations in 2028. Its commissioning will more than double Adnoc’s LNG production capacity to approximately 15 million t/y.
https://image.digitalinsightresearch.in/uploads/NewsArticle/20421415/main4048.jpg -
Fibrex wins $217m Abu Dhabi Seamont residences contract9 October 2026
Register for MEED’s 14-day trial access
Abu Dhabi-based contractor Fibrex Construction Group has won an AED800m ($217m) contract to build the Seamont Autograph Collection Residences project, located on Al-Reem Island in the UAE capital.
Abu Dhabi-based real estate developer Royal Development Holding, a subsidiary of Emirates Stallion Group, and local firm Saas Properties awarded the contract.
The development comprises two 22-storey towers offering 497 residences, ranging from one- to four-bedroom apartments.
The construction programme is scheduled to run for 27 months, with completion due in December 2028.
Fibrex will begin mobilisation immediately, following the completion of enabling works this month, which were undertaken by Sharjah-based Swiss Pro Foundations.
Dubai-based architectural firm Dewan Architects & Engineers is the project consultant.
The contract marks another major win for the contractor. Last year, Dubai-based developer Nakheel awarded Fibrex a AED2.6bn ($708m) contract to build the Bay Villas project at Dubai Islands.
That contract includes the construction of 636 villas.
READ THE OCTOBER 2026 MEED BUSINESS REVIEW – click here to view PDFIndustry and logistics drive development at Neom; Saudi Arabia’s investment priorities realign amid conflict; MEED’s 2026 power developer ranking.
Distributed to senior decision-makers in the region and around the world, the October 2026 edition of MEED Business Review includes:
> AGENDA: Oxagon takes centre stage at Neom> MARKET FOCUS: Saudi projects hold steady> INDUSTRY REPORT: MEED’s 2026 GCC power developer ranking> LEADERSHIP: The future city does not need to hang above the groundTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/20420509/main.jpg -
Dubai picks contractor for Al-Maktoum airport terminal9 October 2026

Dubai Aviation Engineering Projects (DAEP) has selected a contractor for an estimated AED10bn ($2.7bn) substructure package for the West Terminal, as part of the first phase of the $35bn expansion of Al-Maktoum International airport.
A joint venture of Beijing-headquartered China Civil Engineering Construction Corporation (CCECC) and Abu Dhabi-based Tristar Engineering & Construction will execute the contract.
According to a description on DAEP’s website, the expanded airport’s West Terminal will be a seven-level facility spanning 800,000 square metres, with annual capacity for 45 million passengers.
The terminal will be the second of three planned terminals at Al-Maktoum International airport. It will connect to the airside via a 14-station automated people-mover (APM) system.
In July, MEED exclusively reported that DAEP had awarded an estimated $1.5bn contract to a joint venture of Japan’s Mitsubishi Corporation and Indian contractor Larsen & Toubro for the APM system.
The APM will run beneath the apron and terminal areas, using multiple tracks to transport passengers between terminals and concourses. Four underground stations are planned in the first phase, while the full airport development is expected to include 14 stations.
The latest awards form part of a wider programme of contracts recently signed by DAEP, covering enabling works, the second runway, initial structural foundations for passenger terminals and concourse substructures.
Upcoming awards
In June 2026, DAEP said it will award construction contracts worth over AED55bn ($15bn) for Al-Maktoum International airport by the end of the year.
At the time, DAEP said the planned awards included substructure works for the West Terminal, the fourth aircraft concourse and the baggage-handling system. The programme also included superstructure works for the West Terminal and the first, second and third aircraft concourses.
The packages are expected to include long-span structural frameworks for buildings covering about 1.5 million square metres, infrastructure works for the southern airfield area, and power-generation and district-cooling plants supporting the construction programme.
DAEP also plans to award façade and roofing packages in 2026.
The Dubai Government approved updated designs and timelines for its largest construction project in April 2024. In September 2024, MEED exclusively reported that a team comprising Austria’s Coop Himmelb(l)au and Lebanon’s Dar Al-Handasah had been confirmed as lead masterplanning and design consultants for the Al-Maktoum International airport expansion.
Construction of the airport is planned in three phases. Once complete, the airport will cover 70 square kilometres south of Dubai and include five parallel runways and 430 aircraft gates.
It will be five times the size of Dubai International airport and is planned to have a passenger-handling capacity of 260 million passengers a year – the largest in the world. For cargo, it is planned to have the capacity to handle 12 million tonnes a year.
READ THE OCTOBER 2026 MEED BUSINESS REVIEW – click here to view PDFIndustry and logistics drive development at Neom; Saudi Arabia’s investment priorities realign amid conflict; MEED’s 2026 power developer ranking.
Distributed to senior decision-makers in the region and around the world, the October 2026 edition of MEED Business Review includes:
> AGENDA: Oxagon takes centre stage at Neom> MARKET FOCUS: Saudi projects hold steady> INDUSTRY REPORT: MEED’s 2026 GCC power developer ranking> LEADERSHIP: The future city does not need to hang above the groundTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/20417755/main.jpg -
Nakheel awards Dubai Islands marine works contract9 October 2026
Dubai-based developer Nakheel, part of Dubai Holding Real Estate, has awarded local firm Mar Marine & Building Contracting a contract for marine and beach works on Island B at Dubai Islands.
The scope includes constructing breakwaters, removing existing rock revetments and forming a new 320-metre beach near the Bay Villas development.
The contractor will also refurbish existing beach areas and undertake remedial works along approximately 3 kilometres of the island’s western shoreline.
The works are scheduled for completion in the fourth quarter of 2027.
The package supports the Bay Villas project, which comprises 636 villas and townhouses on Island B. Nakheel awarded Fibrex Contracting an AED2.6bn ($708m) construction contract for the residential development in August 2025.
The marine works award follows Nakheel’s AED527m primary infrastructure and utilities contract for Island B, which was awarded to Al-Nasr Contracting Company in April 2026.
In September, Nakheel awarded a main construction contract worth more than AED800m ($218m) for phases one and three of Bay Grove Residences at Dubai Islands. The contract was awarded to local firm Metac General Contracting Company.
The contract covers the construction of 537 apartments, comprising one- to four-bedroom units, across seven residential buildings. Phase one includes 296 units in four buildings, while phase three comprises 241 units across three buildings.
READ THE OCTOBER 2026 MEED BUSINESS REVIEW – click here to view PDFIndustry and logistics drive development at Neom; Saudi Arabia’s investment priorities realign amid conflict; MEED’s 2026 power developer ranking.
Distributed to senior decision-makers in the region and around the world, the October 2026 edition of MEED Business Review includes:
> AGENDA: Oxagon takes centre stage at Neom> MARKET FOCUS: Saudi projects hold steady> INDUSTRY REPORT: MEED’s 2026 GCC power developer ranking> LEADERSHIP: The future city does not need to hang above the groundTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/20418469/main.jpg -
Iraq refinery project given regional approval9 October 2026
Plans to establish a 70,000-barrel-a-day (b/d) refinery in the Iraqi town of Qayyarah have been approved by the Nineveh Provincial Council, which has called for the project to be referred to Iraq’s Council of Ministers. The council also recommended that Duhok-based Karband Company, an industrial manufacturer of asphalt products and lubricating oils, be involved in the project.
The council’s vote follows a meeting held in September between Iraq’s Oil Ministry and Angola’s Sonangol on potentially jointly developing the Qayyarah refinery.
The planned refinery would allow more of the crude produced in Qayyarah to be processed locally, increasing supplies of petroleum products and reducing the need to transport locally produced crude south for export via the Strait of Hormuz.
Iraq awarded the Qayyarah oil field to Sonangol in its second licensing round in 2009, with an initial target of around 120,000 b/d.
A new upstream expansion phase began in January 2025, when Sonangol contracted the Iraqi Drilling Company to drill 10 wells, with an option for three additional appraisal wells.
An existing refinery in Qayyarah, built in 1955, has a capacity of 20,000 b/d.
Progress on the new facility has stalled in recent years, with little movement since 2021, when Iraq signed a memorandum of understanding with Sweden’s SEAB and Turkiye’s Limak on developing the refinery.
Previously, Iraq’s Oil Ministry said the project would include modern units and complex refining technology to produce products meeting Euro 5 standards
The scope of the project is expected to include:
- Processing units
- Storage tanks
- Distillation units
- Associated facilities
The project was first announced in 2018 and has encountered several delays due to funding problems.
READ THE OCTOBER 2026 MEED BUSINESS REVIEW – click here to view PDFIndustry and logistics drive development at Neom; Saudi Arabia’s investment priorities realign amid conflict; MEED’s 2026 power developer ranking.
Distributed to senior decision-makers in the region and around the world, the October 2026 edition of MEED Business Review includes:
> AGENDA: Oxagon takes centre stage at Neom> MARKET FOCUS: Saudi projects hold steady> INDUSTRY REPORT: MEED’s 2026 GCC power developer ranking> LEADERSHIP: The future city does not need to hang above the groundTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/20413126/main.png