New alliance forged to accelerate net-zero ambitions
7 November 2022
Published in partnership with

The immense challenge posed by global warming and the pressing need to reduce carbon emissions cannot be overcome by one single policy, nation or group. Action by every segment of society, from individuals to companies and governments, is essential.
Historically, the main impetus in the drive toward net zero has come top down from policymaking, laws and strategies at a government or international level.
Global treaties such as the 1997 Kyoto Protocol, the 2016 Paris Agreement and the annual Conference of the Parties (COP), all held under the United Nations Framework Convention on Climate Change (UNFCCC), have provided the frameworks and targets to which each member state must bind itself.
In turn, each nation has implemented its own laws and strategies to ensure these targets are met. Regulatory examples include banning new combustion-engine-car sales, green building codes, and subsidies and incentives for renewable energy expansion.
While countries have coordinated policies through intergovernmental organisations such as UNFCCC and the International Renewable Energy Agency (IRENA), companies have often operated in silos as they seek to follow regulations or enact their own decarbonisation agenda.
Corporates are critical to the net-zero process because they directly or indirectly contribute a large percentage of global emissions. According to IRENA, the industrial sector alone accounts for 28 per cent of total global greenhouse gases, of which four segments in particular – iron and steel, chemicals and petrochemicals, cement and lime, and aluminium – account for almost three-quarters.
Therefore, a situation where companies act in isolation and at different paces is far from ideal.
Industrial decarbonisation alliance
But this is changing. In early September, IRENA and Siemens Energy announced the formation of the Alliance for Industry Decarbonization. The new alliance, which launched with 13 other international energy and industrial members, aims to speed up net-zero ambitions and the decarbonisation of industrial value chains in pursuit of the Paris Agreement climate goals.
“Climate action needs industry leaders,” says Francesco La Camera, IRENA's Director General. “This Alliance stands for the growing commitment of global industry to act on decarbonisation and unlock opportunities that come with a green industrialisation through renewables and other transition-related technologies like green hydrogen.
“By standing together, we send a clear signal of solidarity ahead of COP27 and we invite new partners to join our common vision.”
The new industry grouping aims to achieve country-specific net-zero goals faster by encouraging action to decarbonise industrial value chains and enhance the understanding of renewables-based solutions and their adoption by industry. It will also work toward strengthening dialogue among key industrial stakeholders.
Coordinated and facilitated by IRENA, the Alliance will hold its first meeting during COP27 in Egypt in November. Siemens Energy, the principal driver behind its formation next to IRENA, will chair the Alliance together with Tata Steel.
“We need to slash greenhouse gas emissions urgently to tackle climate change,” says Karim Amin, a member of Siemens Energy's executive board. “Accounting for more than a quarter of global emissions, the industrial sector is the second-largest emitter and requires rapid decarbonisation. In this endeavour, partnerships are crucial.
“With our technologies, we at Siemens Energy constantly seek to create value with our partners toward a low-carbon future. I am convinced the Alliance for Decarbonization will accelerate decarbonisation by installing a first-class exchange forum for industry, technology and knowledge partners.”
By standing together, we send a clear signal of solidarity ahead of COP27 and we invite new partners to join our common vision
Francesco La Camera, IRENA
Collective potential
The Alliance's founding members cover a wide range of industrial players. They comprise two regional firms – Abu Dhabi-based energy and water company, TAQA, and Egyptian energy and utility provider TAQA Arabia – oil giants Eni, Equinor and Repsol, engineering, procurement and construction contractor Technip Energies, energy firms Enel Green Power, Tatanga Power and EDF Renewables, steelmakers Tata Steel and JSW, Zimbabwean fertiliser producer Sable Chemicals, and consultancy Roland Berger.
“We all know we need innovative approaches to achieve net zero by the middle of this century. No single company or sector can get there alone,” says Jasim Husain Thabet, TAQA Group’s CEO and Managing Director, explaining why his company joined the Alliance.
“Only by harnessing the power of partnerships can we unlock our collective innovation potential … the world urgently needs us to act.”
By bringing together renewable energy providers, manufacturers and technology companies, the hope is that industrial firms will benefit from low-carbon solutions to their energy requirements, harness industrial electrification technologies and better understand what their peers are doing to meet their own net-zero commitments.
Over time, more companies and industry stakeholders are expected to join the alliance as it gains momentum and the benefits of its collaborative approach become clear. Since its launch, a further eight companies have joined, bringing its total number of members up to 22
New members include Omani global integrated energy company OQ, Cairo-based energy, digital and infrastructure group, El Sewedy, the KIS Group, VALE, ATC Development, Subsea 7, FLSmidth and Petronas.
Energy-intensive heavy industry players – under pressure to transition from coal and other carbon-intensive fuels to renewables and further clean energy sources such as green hydrogen – have been playing a prominent role in the alliance.
But any private or public industrial company with the ambition to reduce its carbon output or with experience and expertise in deploying energy transition technologies is welcome to join.
The Alliance for Industry Decarbonization will not be a magic wand to reduce global warming. But it is a significant first step in encouraging industry stakeholders to work together.
Climate change represents an existential challenge to humanity. Ultimately, companies have an obligation to act now to play their part in mitigating its impact, and the Alliance’s vision is set to help achieve that.
Related reads:
- The journey towards net zero
- Solving Europe’s energy challenge
- Africa's energy trilemma
- Region primed for global green hydrogen leadership
Exclusive from Meed
-
Dewa raises Empower stake in $1.41bn deal12 February 2026
-
Saudi cabinet approves Qatar high-speed rail link12 February 2026
-
Bidders line up for Saudi sewage treatment contract12 February 2026
-
Indian firm wins Dubai Latifa Bint Hamdan road project12 February 2026
-
SAR tenders Riyadh section of Saudi Landbridge12 February 2026
All of this is only 1% of what MEED.com has to offer
Subscribe now and unlock all the 153,671 articles on MEED.com
- All the latest news, data, and market intelligence across MENA at your fingerprints
- First-hand updates and inside information on projects, clients and competitors that matter to you
- 20 years' archive of information, data, and news for you to access at your convenience
- Strategize to succeed and minimise risks with timely analysis of current and future market trends
Related Articles
-
Dewa raises Empower stake in $1.41bn deal12 February 2026
Dubai Electricity & Water Authority (Dewa) has announced it has increased its stake in Emirates Central Cooling Systems Corporation (Empower) from 56% to 80%.
The transaction was completed through the purchase of 2.4 billion shares and the transfer of the entire ownership of Emirates Power Investment (EPI), which is wholly owned by Dubai Holding.
The total value of the deal is AED5.184bn ($1.41bn).
Empower currently holds over 80% of Dubai’s district cooling market and operates 88 district cooling plants across the emirate.
According to MEED Projects, the UAE’s district cooling sector currently has nine projects worth $1.29bn in the pre-execution phase.
Empower has ownership in four of these projects, which have a combined value of $472m.
This includes a $200 million district cooling plant at Dubai Science Park, with a total capacity of 47,000 refrigeration tonnes serving 80 buildings.
Empower signed a contract to design the plant last August, with construction scheduled to begin by the end of the first quarter of 2026.
The utility is also building a district cooling plant at Dubai Internet City.
UAE-based TMF Euro Foundations was recently appointed as the enabling and piling subcontractor for the project.
https://image.digitalinsightresearch.in/uploads/NewsArticle/15635949/main.jpg -
Saudi cabinet approves Qatar high-speed rail link12 February 2026
Saudi Arabia has approved the establishment of a proposed high-speed rail line connecting Riyadh and Doha.
The approval was granted during a cabinet session chaired by King Salman Bin Abdulaziz Al-Saud in Riyadh on 10 February.
The high-speed railway line will cover 785 kilometres (km) and will pass through Hofuf and Dammam, while also linking King Salman International airport and Hamad International airport.
Saudi Arabia and Qatar signed an agreement in December last year to build a high-speed rail line.
The agreement was inked by Saudi Arabia’s Transport & Logistics Services Minister, Saleh Al-Jasser, and Qatar’s Transport Minister, Sheikh Mohammed Bin Abdulla Bin Mohammed Al-Thani.
Trains will reach speeds exceeding 300 kilometres an hour, reducing the travel time between the two capitals to about two hours.
The project is slated for completion in six years. It is expected to serve over 10 million passengers annually and create more than 30,000 direct and indirect jobs.
Riyadh and Doha relaunched the proposed rail link between the two countries in 2022, after agreeing to set a date to begin studying the connection.
In July of that year, France’s Systra was selected to conduct a feasibility study on the proposed scheme, as MEED reported.
A rail link connecting Saudi Arabia and Qatar was planned before the diplomatic dispute that froze relations between Riyadh and Doha from 2017 until the Al-Ula Declaration was signed in January 2021.
In 2016, Qatar Railways Company (Qatar Rail) planned to tender a design-and-build contract for the construction of regional railways in Qatar, including a link to the Saudi border.
https://image.digitalinsightresearch.in/uploads/NewsArticle/15635582/main.jpg -
Bidders line up for Saudi sewage treatment contract12 February 2026

Six bidders are competing in the next phase of Saudi Arabia’s long-term operations and maintenance (LTOM) sewage treatment programme, as National Water Company (NWC) moves closer to awarding a contract.
The contract covers the North Western A Cluster Sewage Treatment Plants Package 11 (LTOM11) and has an estimated value of about $211m.
The project involves the construction and upgrade of two sewage treatment plants with a combined capacity of about 440,000 cubic metres a day (cm/d).
As MEED understands, the companies that have submitted proposals include:
- Alkhorayef Water & Power Technologies (Saudi Arabia)
- Civil Works Company (Saudi Arabia)
- United Water (China)
- Kuzu Group (Turkey)
- VA Tech Wabag (India)
- Aguas de Valencia (Spain)
LTOM11, also known as the North Western A Cluster, forms part of the second phase of NWC’s rehabilitation of sewage treatment plants programme.
The scheme is being procured on an engineering, procurement and construction (EPC) basis with a long-term operations component.
The scope also includes a pumping station, surplus discharge lines, SCADA installation and associated infrastructure.
The main contract was tendered last year, with an award initially expected by the end of 2025.
It is now understood that NWC is preparing to offer the main contract in this quarter.
LTOM programme
LTOM11 follows a series of earlier awards under the programme.
In January, a consortium of United Water (China), Prosus Energy (UAE) and Armada Holding (Saudi Arabia) won the main contract for the Northern Cluster Sewage Treatment Plants Package 10 (LTOM10).
This has an estimated value of about SR203m ($54.1m).
NWC previously awarded $2.7bn-worth of contracts for the first phase of its LTOM programme. This comprises nine packages covering the treatment of 4.6 million cm/d of sewage water for the next 15 years.
As MEED reported, local contracting firm Alkhorayef Water & Power Technologies won three contracts with a combined capacity of 2.04 million cm/d, nearly half of the awarded total. These three contracts are worth more than SR5.53bn ($1.47bn).
A consortium of France’s Suez and the local Al-Awael Modern Contracting Group, with its affiliate Civil Works Company (CWC), won two packages worth a combined SR1.84bn.
A consortium comprising France’s Veolia and Awael-CWC won a single package worth SR1.26bn, and local utility developer Miahona won one package worth SR392m.
In 2024, a joint venture of CWC and Al-Awael Modern Contracting was awarded a $211m contract for LTOM9.
As part of the second phase, the main contract bids for LTOM12 (North Western B Cluster) have also been submitted.
https://image.digitalinsightresearch.in/uploads/NewsArticle/15635292/main.jpg -
Indian firm wins Dubai Latifa Bint Hamdan road project12 February 2026
Indian contractor Larsen & Toubro (L&T) has won a contract to construct the first phase of the Latifa Bint Hamdan Street development project in Dubai.
The contract value is between $110m and $275m, according to L&T’s contract classification.
This project covers 12.2 kilometres of road network from its intersection with Al-Khail Road to Emirates Road.
The project also includes 8.1km of bridges and will add capacity for about 16,000 vehicles an hour in both directions.
The scope also involves widening the two-lane dual carriageway to four lanes in each direction.
The project is scheduled for completion within 36 months.
The contract was awarded by Dubai’s Roads & Transport Authority (RTA).
The project is part of the RTA’s estimated AED16bn ($4.3bn) 2024-27 Main Roads Development Plan, which includes 22 projects across Dubai’s road network, as announced in November 2024.
The development plan includes the construction of new roads and bridges to alleviate traffic congestion at several key locations across Dubai.
Planning for growth
The Dubai 2040 Urban Master Plan was launched in March 2021. Its launch referenced studies indicating that the emirate’s population will reach 5.8 million by 2040, up from 3.3 million in 2020. The daytime population is set to increase from 4.5 million in 2020 to 7.8 million in 2040.
In December 2022, Sheikh Mohammed Bin Rashid Al-Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, approved the 20-Minute City Policy as part of the second phase of the Dubai 2040 Urban Master Plan.
In addition to the road projects, the RTA’s Dubai Metro Blue Line extension also forms part of Dubai’s plans to improve residents’ quality of life by cutting journey times, as outlined in the policy.
The policy aims to ensure that residents can meet 80% of their daily needs within a 20-minute walk or bike ride. This goal will be achieved by developing integrated service centres with the necessary facilities and by increasing population density around mass transit stations.
https://image.digitalinsightresearch.in/uploads/NewsArticle/15635237/main.gif -
SAR tenders Riyadh section of Saudi Landbridge12 February 2026

Saudi Arabia Railways (SAR) has tendered a design-and-build contract for the construction of a new railway line, the Riyadh Rail Link, which will run from north to south Riyadh.
The tender was issued on 29 January, with a bid submission deadline of 29 March.
The scope of work includes constructing a 35-kilometre-long double-track railway line connecting SAR’s North-South Railway to the Eastern Railway network.
The contract also covers the procurement, construction and installation of associated infrastructure such as viaducts, civil works, utility installations, signalling systems and other related works.
The project is expected to form a key component of the Saudi Landbridge railway.
Last month, SAR said it would deliver the Saudi Landbridge project through a “new mechanism” by 2034, after failing to reach an agreement with a Chinese consortium for the construction of the project, as MEED reported.
In an interview with local media, SAR CEO Bashar Bin Khalid Al-Malik said the consortium failed to meet local content requirements and that the project will now be delivered in several phases under a different procurement model.
The project has been under negotiation between Saudi Arabia and China-backed investors keen to develop it through a public-private partnership.
Al-Malik said that the project cost is about SR100bn ($26.6bn).
It comprises more than 1,500 kilometres (km) of new track. The core component is a 900km new railway between Riyadh and Jeddah, which will provide direct freight access to the capital from King Abdullah Port on the Red Sea.
Other key sections include upgrading the existing Riyadh-Dammam line, a bypass around the capital called the Riyadh Link, and a link between King Abdullah Port and Yanbu.
The Saudi Landbridge is one of the kingdom’s most anticipated project programmes. Plans to develop it were first announced in 2004, but put on hold in 2010 before being revived a year later. Key stumbling blocks were rights-of-way issues, route alignment and its high cost.
In April last year, MEED exclusively reported that SAR had issued a tender for the lead design consultancy services contract on the Saudi Landbridge railway network.
MEED understands that the scope covered the concept design and options for the preliminary and issued-for-construction design stages on the network.
MEED reported that the launch of a design tender directly by SAR suggested that Riyadh was looking at other options to develop it alongside the Chinese proposal.
In December 2023, MEED reported that a team of US-based Hill International, Italy’s Italferr and Spain’s Sener had been awarded the contract to provide project management services for the programme.
If it proceeds, the Saudi Landbridge will be one of the largest railway projects ever undertaken in the Middle East and one of the biggest globally. Based on typical design timeframes, tenders for construction are likely to be ready by mid-2026, although the question of how it will be financed will need to be answered before it can proceed to the next step.
https://image.digitalinsightresearch.in/uploads/NewsArticle/15635220/main.jpg

.gif)