Neom’s Enowa plans synthetic fuels pilot project

26 October 2023

Neom energy and water subsidiary, Enowa, has awarded Germany's Thyssenkrupp Uhde a contract for the supply of engineering services, design and procurement of a new synthetic fuels demonstration plant.

The pilot carbon dioxide-to-methanol and methanol-to-gasoline project will be located at Enowa's Hydrogen Innovation & Development Centre in Saudi Arabia.

Thyssenkrupp Uhde will perform engineering services as well as the supply, design and procurement of equipment for the facility.

The plant is a joint development of Enowa and state-backed energy firm Saudi Aramco. It will use the Uhde green methanol process and ExxonMobil’s fluidised bed methanol-to-gasoline process.

The plant is expected to produce 12 tonnes of methanol and 35 barrels of gasoline a day when complete.

According to Thyssenkrupp Uhde, methanol produced from hydrogen and carbon dioxide (CO2) can be used as an energy carrier, a hydrogen carrier and a transport fuel, as well as to store electric power generated from renewable energies.

It can also be used as a climate-friendly feedstock in the chemicals industry, including for products such as plastics, paints and varnishes, building materials, clothing, pharmaceutical products and disinfectants.

The Uhde green methanol technology for the production of methanol from CO2 and hydrogen is a key technology for climate protection, according to Thyssenkrupp.

"By switching from fossil to renewable energy carriers and by using captured CO2 for the production of many products, CO2 emissions can be significantly reduced or avoided. The direct conversion of CO2 to methanol using hydrogen is particularly suitable," the company said.

It added that Uhde's process design offers the "greatest possible efficiency and is suitable for both decentralised small and medium-sized methanol plants, as well as for centralised plants for the production of up to several thousand tonnes of methanol a day".

https://image.digitalinsightresearch.in/uploads/NewsArticle/11247940/main.jpg
Jennifer Aguinaldo
Related Articles
  • Contractor groups prequalify for Dubai Metro Gold Line

    13 October 2026

     

    Six contracting groups submitted prequalification statements on 9 October for the contract to build Dubai Metro’s new Gold Line.

    The Roads & Transport Authority (RTA) issued the request for qualification notice for the project in June, as MEED exclusively reported.

    The consortiums formed to bid for the main contract are:

    • Alstom / China Railway Engineering Corporation / National Projects Construction / Dogus Construction (France/China/local/Turkiye)
    • CRRC / Limak / Mapa Group (China/Turkiye/Turkiye)
    • Hitachi / China Harbour Engineering Company / China State Construction Engineering Corporation (Japan/China/China)
    • Siemens / Petrojet / Concord Engineering & Contracting / Rowad Modern Engineering (Germany/Egypt/Egypt/Egypt)
    • Hassan Allam / IC Ictas / Siemens (Egypt/Turkiye/Germany)
    • Larsen & Toubro / Powerchina / Wade Adams (India/China/local)

    Dubai officially announced the Gold Line in April.

    In a post on social media site X, Sheikh Mohammed Bin Rashid Al-Maktoum, UAE Vice President and Prime Minister and Ruler of Dubai, said the project would cost about AED34bn ($9.2bn).

    The Gold Line will increase the Dubai Metro network’s total length by 35%. The project is scheduled to be completed in September 2032.

    The fully underground line will extend for more than 42 kilometres and include 18 stations. It will pass through 15 areas of Dubai and serve 1.5 million residents.

    The project is expected to connect more than 55 under-construction real estate developments.

    The Gold Line will begin at Al-Ghubaiba in Bur Dubai and terminate at Jumeirah Golf Estates. It will connect with the existing Red and Green lines and integrate with the Etihad Rail passenger network.

    The contractor will be responsible for the design and construction of all civil works, electromechanical equipment, rolling stock and rail systems. The selected contractor will also be required to support systems maintenance and operations during an initial three-year period.

    In October last year, MEED exclusively reported that the RTA had selected US-based engineering firm Aecom to provide consultancy services for the Dubai Metro Gold Line project.

    Stage one covers concept design; stage two, preliminary design; stage three, tender-document preparation; stage four, construction supervision; and stage five, the defects-liability period.


    READ THE OCTOBER 2026 MEED BUSINESS REVIEW – click here to view PDF

    Industry and logistics drive development at Neom; Saudi Arabia’s investment priorities realign amid conflict; MEED’s 2026 power developer ranking.

    Distributed to senior decision-makers in the region and around the world, the October 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/20531469/main.png
    Yasir Iqbal
  • Kuwait tenders gas export pipeline

    13 October 2026

     

    State-owned upstream operator Kuwait Oil Company (KOC) has tendered a contract to develop a gas export pipeline.

    The 24-inch-diameter pipeline will extend from Booster Station 171 (BS-171) to the Intermediate Slug Catcher (ISC) facility in southeastern Kuwait, passing through the tie-in point known as TP-1.

    The bid deadline is 5 January 2027. A preliminary online meeting to discuss the project is scheduled for mid-November.

    BS-171 was inaugurated in February 2018. It serves as a central gas-treatment facility for gas and condensate from several gathering centres in West Kuwait and other areas.

    The feeder gathering centres include GC-17, GC-27, GC-28 and GC-16.

    BS-171 was Kuwait’s first facility designed specifically to handle acid gas.

    The ISC facility is located about 80 kilometres from BS-171.

    KOC announced plans to tender the project last year. At the time, it said that the scope would include the installation of bidirectional pig traps above the new pipeline.

    A pig trap is a section of piping that enables a pipeline pig – a device used to clean, inspect or maintain a pipeline – to be launched or received.

    The chosen contractor will need to provide:

    • Valves
    • Piping
    • Fittings
    • Civil services
    • Structural services
    • Electrical and instrumentation services
    • Tie-ins
    • Testing services
    • Pre-commissioning services
    • Commissioning services

    The ISC facility is a major gas-handling facility in Kuwait’s Burgan area. It receives sour gas from West Kuwait oil fields before the gas is transported onwards to the Mina Al-Ahmadi gas-processing facilities.


    READ THE OCTOBER 2026 MEED BUSINESS REVIEW – click here to view PDF

    Industry and logistics drive development at Neom; Saudi Arabia’s investment priorities realign amid conflict; MEED’s 2026 power developer ranking.

    Distributed to senior decision-makers in the region and around the world, the October 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/20517716/main.jpg
    Wil Crisp
  • Developers prepare bids for 1GW Oman bess scheme

    12 October 2026

     

    Developers are preparing to submit bids for almost 1GW of standalone battery energy storage (bess) projects in Oman, a source close to the project has confirmed to MEED.

    The independent power producer (IPP) scheme includes the installation of five bess facilities with a combined power capacity of 950MW and storage capacity of 3,800MWh. Nama Power & Water Procurement Company (PWP) is procuring it.

    According to sources close to the project, a developer’s tender was floated in the summer. An initial bid submission deadline has since been extended, with bids expected to be submitted in the coming weeks.

    The largest project is a 500MW facility in Sohar, Al-Batinah North governorate, with a storage capacity of 2,000MWh. The Sohar facility is expected to connect to the grid at 220kV. The site covers approximately 149,535 square metres.

    Four further installations are planned at Al-Mabellah in Muscat governorate, Ayjah in South Al-Sharqiyah, the Jalan Bani Bu Ali wind farm site in South Al-Sharqiyah, and Sadah in Dhofar.

    The Al-Mabellah and Ayjah facilities are each planned to have a capacity of 100MW and storage capacity of 400MWh. Both are expected to connect to the grid at 132kV.

    The Jalan Bani Bu Ali installation is planned to have a capacity of 150MW and storage capacity of 600MWh. It is expected to connect to the Sadah wind farm and Jalan Bani Bu Ali wind farm substations.

    The Sadah installation is planned to have a capacity of 100MW and storage capacity of 400MWh. It is expected to connect to the Sadah wind farm substations at 132kV.

    US/India-based Synergy Consulting is the financial adviser for the procurement; Germany’s Fichtner is the technical adviser; and Germany-headquartered CMS is the legal adviser.

    Utility-scale storage

    In May, Oman’s Authority for Public Services Regulation (APSR) opened technical bids for a consultancy contract supporting a planned 1,000MW/four-hour bess project.

    As previously reported, APSR issued the request for proposals in April as part of wider plans to increase the share of renewable energy in the sultanate. 

    The sultanate’s first utility-scale solar photovoltaic (PV) plant integrated with battery energy storage (Ibri 3) entered construction at the beginning of the year, comprising a 500MW solar PV plant and a 100MWh bess system.

    Also in May, state offtaker Nama Power & Water Procurement Company signed a power purchase agreement with local firm O-Green for Oman’s first round-the-clock renewable energy project.

    Renewable energy is expected to increase from 4% of the generation mix in 2024 to 30% by 2030, driving the push for more utility-scale storage projects.

    Over roughly the same period, demand is forecast to double, reaching 10 terawatt-hours by 2031.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/20511976/main.jpg
    Mark Dowdall
  • Frontrunner emerges for Saudi Arabia’s GCC rail link design

    12 October 2026

     

    French engineering firm Systra has emerged as the frontrunner to provide design consultancy services for the Saudi Arabian section of the GCC railway network, which is intended to link all six member states.

    The tender covers the concept, preliminary and issued-for-construction design stages. Saudi Arabia Railways (SAR) requires the selected consultant to review, update and complete the existing preliminary design.

    Consultants submitted proposals on 14 July, as MEED reported.

    The consultants who submitted bids included: 

    • AtkinsRealis with Khatib & Alami
    • Deutsche Bahn with ARX
    • Egis with Sener
    • Idom with Dar Al-Handasah
    • Systra

    Saudi Arabia’s section of the railway will start at Al-Khafji in the Eastern Province, near the border with Kuwait, and end at Al-Batha, on Saudi Arabia’s border with the UAE. 

    Tendering is also ongoing for a separate contract involving design management and review to oversee engineering works on the GCC railway network.

    The tender was issued on 9 September, with a submission deadline of 18 October, as MEED exclusively reported.

    The tender seeks a consultant to manage, audit and verify deliverables produced by SAR’s separately appointed design services consultant, rather than carry out the design itself.

    Construction will be tendered separately through competitive bidding once designs are approved.

    The GCC railway will run for about 672km inside Saudi Arabia, linking the kingdom’s existing network to Kuwait, Qatar, the UAE and Bahrain, with four sections of about 141km, 200km, 151km and 21km, respectively.

    The line is planned as a single-track, non-electrified corridor for mixed freight and passenger traffic, with a maximum axle load of 32.4 tonnes and passing loops for bidirectional working.

    GCC railway line

    Under the overall plan, the railway will run from Kuwait, pass through Dammam in Saudi Arabia, reach Bahrain via a planned causeway, and continue from Dammam to Qatar, the UAE and, ultimately, Muscat via Sohar in Oman. The railway is reported to cover about 2,186km in total.

    The route length within each member state is as follows:

    • UAE – 684km
    • Saudi Arabia – 672km
    • Oman – 306km
    • Qatar – 283km
    • Kuwait – 145km
    • Bahrain – 36km

    The railway is designed for passenger trains travelling at 220 kilometres an hour (km/h) and freight trains operating at 80km/h–120km/h.

    With high levels of project activity, governments in spending mode and renewed cooperation under the Al-Ula Declaration, the latest efforts to restart the GCC railway project may make more progress than previous attempts. If completed, the railway could prove transformational for a region that is globally connected but still divided by national borders.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/20510318/main.gif
    Yasir Iqbal
  • Houthi escalation targets Saudi airports

    12 October 2026

    Yemen’s Houthis have placed Saudi Arabia’s civil aviation infrastructure at the centre of their campaign against the kingdom. Two strikes on King Khalid International airport in Riyadh over the weekend killed 13 people and injured 320.

    The deadlier attack hit a passenger terminal on the afternoon of 10 October. The General Authority of Civil Aviation (Gaca) said it killed 12 people, including four Saudi citizens, and injured 309. Airport operations were suspended pending a damage assessment.

    A second strike hit Terminal 4 on the afternoon of 11 October, sparking a fire that killed a Pakistani resident and injured 11 others, according to Gaca. The Saudi-led coalition reported intercepting a cruise missile near the airport that afternoon. Gaca also reported an attack on King Fahd International airport in Dammam that evening, following a coalition report of a projectile falling near the facility the previous night.

    The weekend strikes followed attacks on Abha International airport on 6 October and on King Khalid International airport on 7 and 8 October, the last of which included a strike on a Saudia aircraft. Gaca figures put the toll from the week’s attacks on Saudi airports at 19 dead and more than 350 injured.

    The Houthis said they would continue operations inside the kingdom and that all Saudi airports were potential targets, with the exception of those serving the holy cities. The group says it is acting in response to Riyadh’s support for Yemeni government forces and a Saudi air strike on Sanaa airport. It has also claimed attacks on Saudi oil facilities, which Saudi authorities have not confirmed.

    Aviation exposure

    The attacks strike a sector central to the kingdom’s diversification plans. King Khalid International airport’s existing terminals are to be absorbed into King Salman International airport (KSIA), a 57-square-kilometre development with six parallel runways targeting a capacity of 120 million passengers by 2030 and 185 million by 2050.

    Procurement on KSIA has gathered pace this year. In July, a joint venture of China Civil Engineering Construction Corporation and Dammam-based Mofarreh AlHarbi & Partners won an estimated SR800m ($213m) contract for enabling and substructure works on Terminal 6, which will add capacity for 40 million passengers. Turkish contractor IC Ictas and Saudi Arabia’s Al-Rashid Trading & Contracting recently secured a SR800m ($213m) contract for the airport’s Private Aviation Terminal.

    Government-owned Saudi Royal Aviation set 8 October as the bid deadline for an estimated SR3bn ($800m) contract to build an aviation complex within the KSIA masterplan, the same day the Houthis struck King Khalid International airport and a Saudia aircraft.

    Airlines have already adjusted. Flydubai cancelled flights to Riyadh and Yanbu up to 10 October and to Abha up to 11 October, and Etihad Airways reported extended delays on its Abu Dhabi to Riyadh service after the airport closed on 8 October. The UK Foreign Office has advised against all travel to areas within 10km of the Yemeni border.

    Market reaction

    The Saudi stock market’s response has been muted so far. The Tadawul main index fell 15.54 points to close at 10,360.74 on 11 October, the first trading session after the Saturday attack, with turnover of SR2.6bn ($693m). The session closed before the second strike on King Khalid International airport and the attack on Dammam, and Monday’s trading will be the first to reflect the full weekend.

    The weekend also brought a separate maritime incident. UK Maritime Trade Operations said an oil tanker was struck by an unidentified projectile in the Strait of Hormuz on 11 October, with its crew reported safe.

    Diplomatic response

    The coalition described the 10 October attack as a war crime and said it would respond decisively. It said on 10 October that it had destroyed 136 military targets in Houthi-controlled areas and was working to dismantle the group’s ballistic missile network.

    Egypt, Pakistan and Turkiye joined Saudi Arabia in an R4 group statement condemning the attacks and supporting measures taken by the kingdom in response. The Arab League also voiced its support for Saudi Arabia. On 11 October, Iran’s foreign minister spoke by telephone with his Saudi counterpart, Prince Faisal Bin Farhan, to discuss the escalation. The US and UK have also signalled the possibility of further support for the kingdom.

    The escalation comes against the backdrop of the regional conflict, which has drawn Saudi Arabia into a renewed Yemen front after several years of relative calm following the 2022 ceasefire. The extent of the damage at King Khalid International airport, which Gaca is still assessing, and the speed at which international carriers resume full schedules will determine how far the attacks disrupt the kingdom’s aviation programme.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/20505600/main.gif
    Colin Foreman