Libya in talks with contractors to take over upstream oil project
24 March 2026

Libya’s National Oil Corporation (NOC) is in talks with contractors regarding a project to deliver an early production facility (EPF) at the North African country’s Erawin field, according to industry sources.
The contract was originally awarded to the UK-based engineering company Petrofac.
Petrofac secured the contract with Zallaf Libya Oil & Gas Exploration & Production Company to deliver the Erawin field development project phase 1 EPF in September 2021.
Earlier this month, MEED reported that Petrofac had stopped work on the project and cut the number of Libyan staff that it was employing in the country.
One industry source said: “Libya’s NOC is now looking for other companies to take over this project and finish the job.
“This project is considered important for hitting upstream targets, so the client does not believe that it has the time to go through an open tender process.
“It’s looking to negotiate a direct deal with a company that can start work as soon as possible.”
The scope of work for the original project awarded by Zallaf to Petrofac included surface equipment, such as well pads and flowlines, at the Erawin oil field.
It also included a pipeline to transport crude oil approximately 100 kilometres (km) to the El-Sharara oil field, along with a control room, substation and telecom system located there.
Petrofac has already completed several parts of the original project scope.
The completed parts of the project include the pipeline infrastructure, which has been in operation for more than a year, according to Petrofac.
Zallaf Libya Oil & Gas Exploration & Production Company was established in Libya in 2013 and is wholly owned by NOC.
It awarded the Erawin EPF contract to Petrofac using the engineering, procurement, construction and commissioning (EPCC) contract model.
In a statement in 2021, Petrofac said the contract was valued at over $100m, but did not give a precise figure.
The regional project-tracking service MEED Projects has estimated that the contract was worth $440m.
Petrofac problems
On 27 October last year, Petrofac announced that it had applied to appoint administrators, a move that potentially put thousands of jobs at risk and increased uncertainty for projects worth billions of dollars in the Middle East and North Africa (Mena) region.
At the time, the total value of projects awarded to Petrofac and under construction in the region was $5.83bn, according to information recorded by MEED Projects.
Petrofac also had bids under evaluation for 15 projects in the region worth a total of $19.28bn.
Since then, key parts of the business have been sold off, and many of the company’s staff have been made redundant.
The redundancies included around 180 employees who were issued termination notices in October last year.
In December, the US-based company CB&I announced it had entered into a deal to buy Petrofac’s asset solutions business in the first quarter of 2026.
In January this year, the proposed company voluntary arrangement (CVA) related to the sale of its Asset Solutions business was approved.
Erawin exports
Libya shipped its first cargo of crude from the Erawin oil field in November 2023.
The shipment departed from Libya’s Zawiyah port and consisted of 600,000 barrels of crude.
Australia-based Worley Parsons was appointed as the front-end engineering and design (feed) contractor for the EPF project in 2019.
The Erawin field development project is located about 800km south of Tripoli and 100km southwest of the El-Sharara field.
Exclusive from Meed
-
Rabigh 2 IPP expansion secures $2.58bn financing5 October 2026
-
Dubai announces $490m e-commerce hub expansion plan5 October 2026
-
Iraq and Turkiye discuss oil and gas deal5 October 2026
-
-
Contractors submit bids for Libya refinery5 October 2026
All of this is only 1% of what MEED.com has to offer
Subscribe now and unlock all the 153,671 articles on MEED.com
- All the latest news, data, and market intelligence across MENA at your fingerprints
- First-hand updates and inside information on projects, clients and competitors that matter to you
- 20 years' archive of information, data, and news for you to access at your convenience
- Strategize to succeed and minimise risks with timely analysis of current and future market trends
Related Articles
-
Rabigh 2 IPP expansion secures $2.58bn financing5 October 2026
Saudi Arabia’s Rabigh 2 combined-cycle gas-turbine (CCGT) independent power project (IPP) expansion has reached financial close.
In a disclosure to the Saudi Exchange, Acwa said it had secured SR9.69bn ($2.58bn) in long-term financing for the project, which has a generation capacity of 2,313.5MW.
In April, MEED reported that Acwa and Saudi Energy (formerly Saudi Electricity Company) had signed a 31-year power purchase agreement (PPA) with Saudi Arabia’s principal buyer, Saudi Power Procurement Company (SPPC), for the project.
The project involves developing a CCGT plant in the Mecca region. It is being developed by Al-Morjan Two Electricity Company, with Acwa and Saudi Energy each owning a 40% stake in the project.
The contract is valued at SR11.5bn ($3.07bn), the companies said in separate stock exchange filings at the time. The carbon-capture-ready power plant will be implemented under a build, own and operate contract.
The financing has a tenor of about 34 years and was provided by a consortium of local, regional and international lenders.
The lenders are:
- Abu Dhabi Commercial Bank
- Alinma Bank
- Boubyan Bank
- China Minsheng Banking Corporation, Hong Kong Branch
- Commercial Bank of Dubai
- HSBC Bank Middle East
- Industrial and Commercial Bank of China
- Industrial Bank, Beijing Branch
- National Bank of Greece, Cyprus
- Riyad Bank
- Saudi Awwal Bank
- Saudi National Bank
- Standard Chartered Bank, Taiwan
- Sumitomo Mitsui Trust Bank, London Branch
The project scope also includes financing and expanding a 380kV electrical substation.
According to regional project tracker MEED Projects, construction works have commenced on the project, and a joint venture of Egypt’s Elsewedy Electric and China’s Sinohydro has been working as the main contractor.
Rabigh 1 extension
In January, Saudi Energy announced a separate energy conversion agreement with SPPC for the purchase of electricity from the Rabigh 1 power plant expansion.
The contract is valued at SR5.33bn ($1.42bn).
It covers the development, financing, construction, ownership and operation of the gas-fired power plant, which will have a generation capacity of 1,179MW.
A joint venture of Elsewedy Electric and Germany’s Siemens Energy is undertaking the engineering, procurement and construction work for the project, which is expected to be completed by the end of 2026.
US/India-based Synergy Consulting is the financial advisory consultant to Saudi Energy on this project.
Acwa also recently started initial commercial operations at the Taiba 1 and Qassim 1 CCGT power plants, as reported by MEED.
The plants have a combined generation capacity of about 3.8GW and are two of four projects procured under the first round of Saudi Arabia’s gas-fired IPP programme by SPPC.
A team of Saudi Energy and Acwa won the contract to develop and operate the projects in 2023.
MEED’s October 2026 report on Saudi Arabia includes:
> COMMENT: Saudi projects hold steady
> GOVERNMENT: Riyadh looks to reset its regional defence outlook
> ECONOMY: Conflict bolsters case for Saudi economic diversification
> BANKING: Saudi lenders readjust to lower lending and deposit climate
> UPSTREAM: Aramco upstream spending gathers pace
> DOWNSTREAM: Sabic steps up Saudi petchems investment
> POWER: Saudi Arabia’s power award activity slows
> WATER: Saudi water sector hits sharp slowdown
> CONSTRUCTION: Saudi construction defies the headwinds
> TRANSPORT: Saudi infrastructure pushes forward amid conflict
> DATABANK: Saudi data indicates project spending shiftTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/20270643/main.jpg -
Dubai announces $490m e-commerce hub expansion plan5 October 2026
Dubai CommerCity has launched a second expansion phase valued at more than AED1.8bn ($490m), adding over 91,000 square metres (sq m) of office, retail and logistics space across the free zone’s business, social and logistics clusters.
Dubai CommerCity is a joint venture of Dubai Airport Free Zone Authority (Dafza) and Dubai government-owned Wasl Asset Management Group.
The expansion is scheduled for delivery between the first quarter of 2027 and the fourth quarter of 2028.
The developer said the move builds on sustained demand at Dubai CommerCity, where occupancy has reached nearly 96% across its office, logistics and retail assets.
Phase two will comprise a series of developments across Dubai CommerCity’s three districts: the Business Cluster, Logistics Cluster and Social Cluster.
The Business Cluster comprises 13 office buildings with a total leasable area of 108,000 sq m. The Logistics Cluster consists of 84 logistics units with a leasable area of 68,000 sq m, while the Social Cluster features art galleries, restaurants and cafes. The development will also include 4,000 parking spaces.
Dafza and Wasl Asset Management Group announced plans to develop the AED2.7bn ($735m) e-commerce free zone In 2017.
READ THE OCTOBER 2026 MEED BUSINESS REVIEW – click here to view PDFIndustry and logistics drive development at Neom; Saudi Arabia’s investment priorities realign amid conflict; MEED’s 2026 power developer ranking.
Distributed to senior decision-makers in the region and around the world, the October 2026 edition of MEED Business Review includes:
> AGENDA: Oxagon takes centre stage at Neom> MARKET FOCUS: Saudi projects hold steady> INDUSTRY REPORT: MEED’s 2026 GCC power developer ranking> LEADERSHIP: The future city does not need to hang above the groundTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/20270228/main.jpg -
Iraq and Turkiye discuss oil and gas deal5 October 2026
Iraq and Turkiye have opened talks in Ankara on a framework agreement for oil, gas and energy cooperation, according to a statement from the Iraqi Oil Ministry.
Iraq’s Oil Minister Bassem Mohammed Khudair Al-Abadi led the Iraqi side, while the Turkish Energy and Natural Resources Minister Alparslan Bayraktar led the Turkish side.
Officials discussed a proposed roadmap to deepen work on oil and gas infrastructure, petrochemicals, and trade in oil, gas and power.
Discussions about a future long-term deal to govern the Iraq-Turkiye Pipeline (ITP) were central to the talks.
The ITP exports oil from northern Iraq to the port of Ceyhan in Turkiye.
In July, Turkiye and Iraq signed a temporary agreement to allow crude flows through the ITP for a period of 12 months.
Before the temporary agreement was signed, the previous deal governing oil exports through the pipeline was due to expire on 27 July.
Speaking last month, Ali Al-Shatri, director general of Iraq’s state organisation for marketing oil (Somo), said the temporary deal was “a prelude” to a much bigger agreement.
As well as governing pipeline exports, the new agreement is expected to cover electricity, chemicals and gas deals as well as the construction of a new oil refinery in Ceyhan.
Under current plans, the new refinery will process Iraqi crude in order to produce refined products that can be exported to Europe.
Bayraktar said: “Following the crude oil transportation agreement signed between our national company … we are clarifying our roadmap for a new, longer-term and more comprehensive agreement.
“In this regard, we plan to activate our joint working groups to rapidly finalise oil and natural gas infrastructure, exploration and production, oil trading, refining-petrochemical and electricity projects.
“In close cooperation with the new Iraqi Government, we will strongly continue to implement these concrete projects for the stability and prosperity of our shared geography.”
Bayraktar said it was important to consider extending the Kirkuk-Ceyhan pipeline to reach Basra in southern Iraq.
He also said it was important to consider expanding the capacity of the ITP to create a strong alternative to the Strait of Hormuz.
The Strait of Hormuz is a key oil export route that has been disrupted by a regional war since the US and Israel attacked Iran on 28 February.
Bayraktar also said that he wanted state-owned Turkish Petroleum Corporation (TPAO) to expand its footprint in Iraq.
He said: “We aim for our national company TPAO to play an active role not only in the Kirkuk fields but also in different fields in Iraq, to reach the target of supplying one million barrels of crude oil as stated by Iraqi Prime Minister Ali ez-Zeydi; and to transform Ceyhan into a global energy hub by increasing trade volume.”
Bayraktar said that Turkiye wanted energy to be a key part of the plan for a north-south trade corridor from the Grand Faw Port to the Turkish border.
Under current plans, the corridor will combine a new railway and highway system.
Bayraktar said that Turkiye also wants the route to include oil and gas pipelines as well as electricity transmission lines.
READ THE OCTOBER 2026 MEED BUSINESS REVIEW – click here to view PDFIndustry and logistics drive development at Neom; Saudi Arabia’s investment priorities realign amid conflict; MEED’s 2026 power developer ranking.
Distributed to senior decision-makers in the region and around the world, the October 2026 edition of MEED Business Review includes:
> AGENDA: Oxagon takes centre stage at Neom> MARKET FOCUS: Saudi projects hold steady> INDUSTRY REPORT: MEED’s 2026 GCC power developer ranking> LEADERSHIP: The future city does not need to hang above the groundTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/20268590/main.jpg -
RTCC/Ictas wins $214m King Salman airport private aviation terminal5 October 2026

Register for MEED’s 14-day trial access
Saudi Arabia’s King Salman International Airport Development Company (KSIADC) has awarded an estimated SR800m ($214m) construction contract to build the private aviation terminal.
The contract was awarded to a joint venture of Riyadh-based Al-Rashid Trading & Contracting (RTCC) and Turkiye’s IC Ictas.
The scope includes constructing a central courtyard, grand boulevard, parking facilities, access-control checkpoints, logistics and ground-support facilities, internal road networks and landscaping.
It also includes all civil, structural, architectural, and mechanical, electrical and plumbing (MEP) works, along with testing, commissioning and handover activities.
KSIADC is making rapid progress on its overall project masterplan. In July, it reported major progress on landside and airside infrastructure works linked to its third runway and private aviation facilities, as part of the wider airport expansion programme.
Project scale
The project covers an area of about 57 square kilometres (sq km), allowing for six parallel runways, and will include the existing terminals at King Khalid International airport. It will also include 12 sq km of airport support facilities, residential and recreational facilities, retail outlets and other logistics real estate.
The airport aims to accommodate up to 100 million passengers by 2030. The cargo target is to process 2 million tonnes a year by 2030.
Saudi Arabia plans to invest significantly in its aviation sector. Riyadh’s Saudi Aviation Strategy, announced by Gaca, aims to triple Saudi Arabia’s annual passenger traffic to 330 million travellers by 2030.
It also aims to increase air cargo traffic to 4.5 million tonnes and raise the country’s total air connections to more than 250 destinations.
MEED’s October 2026 report on Saudi Arabia includes:
> COMMENT: Saudi projects hold steady
> GOVERNMENT: Riyadh looks to reset its regional defence outlook
> ECONOMY: Conflict bolsters case for Saudi economic diversification
> BANKING: Saudi lenders readjust to lower lending and deposit climate
> UPSTREAM: Aramco upstream spending gathers pace
> DOWNSTREAM: Sabic steps up Saudi petchems investment
> POWER: Saudi Arabia’s power award activity slows
> WATER: Saudi water sector hits sharp slowdown
> CONSTRUCTION: Saudi construction defies the headwinds
> TRANSPORT: Saudi infrastructure pushes forward amid conflict
> DATABANK: Saudi data indicates project spending shiftTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/20268414/main.jpeg -
Contractors submit bids for Libya refinery5 October 2026

Bids have been submitted for the main contract for Libya’s planned South Refinery project and are currently under technical evaluation, according to industry sources.
The project, located in Ubari in southern Libya, has gained momentum over the past year, and the main contract is anticipated to be worth more than $600m.
The main contract is expected to use the engineering, procurement and construction (EPC) model.
The EPC work is expected to take 50 months, and the facility will be designed to process 30,000 barrels a day (b/d) of crude oil.
In March, US-based engineering company KBR was awarded a contract by Zallaf Exploration, Production & Refining of Oil & Gas Company to provide project management and technical services for the project.
Under the terms of the contract, KBR will provide contract management, project management and supporting technical services throughout the project’s EPC phases.
The refinery is expected to produce:
- Propane and butane for domestic and industrial uses
- Gasoline
- Kerosene
- Diesel
- Fuel oil
In March, KBR said that the project was aligned with its “long-standing commitment to advancing vital oil and gas infrastructure in Libya”.
Libya currently operates five main refineries with a combined nameplate capacity of 380,000 b/d, but actual throughput is closer to 180,000 b/d due to poor maintenance and damage from military clashes.
In addition to the South Refinery project, Libya also plans to upgrade the Zawiya refinery and carry out projects at the Serir, Brega, Tobruk and Ras Lanuf refineries.
READ THE OCTOBER 2026 MEED BUSINESS REVIEW – click here to view PDFIndustry and logistics drive development at Neom; Saudi Arabia’s investment priorities realign amid conflict; MEED’s 2026 power developer ranking.
Distributed to senior decision-makers in the region and around the world, the October 2026 edition of MEED Business Review includes:
> AGENDA: Oxagon takes centre stage at Neom> MARKET FOCUS: Saudi projects hold steady> INDUSTRY REPORT: MEED’s 2026 GCC power developer ranking> LEADERSHIP: The future city does not need to hang above the groundTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/20267178/main.jpg