Hidden Marina prequalification gets under way

9 July 2024

 

Register for MEED's 14-day trial access 

The prequalification process for Neom's Hidden Marina wastewater recycling plant project is under way.

Saudi Arabia's Enowa, the utility and energy subsidiary of gigaproject developer Neom, received statements of qualifications from interested developers in late June.

The planned facility will have the capacity to treat 64,000 cubic metres a day (cm/d) of wastewater, expandable to 80,000 cm/d.

According to a source close to the project, Enowa is expected to respond within a month to the companies that submitted prequalification documents, which include international and local water and wastewater utility developers.

The plant will supply water recycling services to the anticipated occupants of the 170-kilometre-long pair of parallel buildings that will make up The Line at Neom.

The project includes a sludge treatment facility with a capacity of 16,600 kilogrammes a day.

It will utilise a build-own-operate-transfer model, with the sewage treatment concession period extending 25 years from the date of operation, which is expected to be in the second quarter of 2027.

The project's first phase is expected to cost approximately SR1.3bn ($347m).

UK-headquartered HSBC and the US' White & Case are the client's financial and legal advisers, respectively, for the project.  

According to regional projects tracker MEED Projects, an estimated $10.7bn-worth of utility projects are under construction at Neom. Close to $22bn-worth of projects are in the pre-execution phase, excluding the renewable energy projects that are still in the pre-development stages and for which locations have yet to be identified.

https://image.digitalinsightresearch.in/uploads/NewsArticle/12070182/main1003.jpg
Jennifer Aguinaldo
Related Articles
  • Read the December 2025 MEED Business Review

    28 November 2025

    Download / Subscribe / 14-day trial access

    The region boasts a pipeline of over $140bn-worth of railway schemes, according to data from regional projects tracker MEED Projects.

    This puts the GCC at the centre of global rail construction activity, with progress being made on several large-scale rail schemes.

    From the Qiddiya high-speed rail in Saudi Arabia to the planned expansion of Dubai’s metro network and the long-awaited revival of the GCC railway, a new wave of projects is shaping the region’s economic future.

    As leading construction, engineering and technology firms either expand or return to the region after years of reduced activity, MEED’s latest issue of MEED Business Review looks at the scale and ambition of ongoing rail projects.

    We also consider the region’s growing role as a rail hub, with an increasing need for ongoing servicing, upgrades and new technologies.

    This month’s market focus covers Bahrain, where Manama is pushing ahead with diversification amid mounting fiscal constraints and external pressures.

    MEED’s latest issue also includes our 2025 EPC contractor ranking, as well as analysis on the cost advantages, technological gains and strong execution giving Chinese contractors a regional edge.

    This edition is bursting with features and interviews. The team looks at Libya's ramp up of oil activity; visits the under-construction Aramco Stadium in Khobar as it races towards completion; provides an update on Abu Dhabi's $6bn solar and storage project; and interviews Turki AlShehri, regional vice president for Saudi Arabia and the GCC at French power and water developer Engie.

    We hope our valued subscribers enjoy the December 2025 issue of MEED Business Review

     

    Must-read sections in the December 2025 issue of MEED Business Review include:

    AGENDA: 
    Regional rail construction surges ahead

    Middle East becomes a hub as rail networks mature

    INDUSTRY REPORT:
    EPC contractor ranking
    Larsen & Toubro climbs EPC contractor ranking
    Chinese firms expand oil and gas presence

    > CURRENT AFFAIRS: Oil companies ramp up activity in Libya

    > CONSTRUCTION: Aramco Stadium races towards completion

    > RENEWABLES: UAE moves ahead with $6bn solar and storage project

    > INTERVIEW: Engie pivots towards renewables projects

    > BAHRAIN MARKET REPORT: 
    > COMMENT: Manama pursues reform amid strain
    > GVT & ECONOMY: Bahrain’s cautious economic evolution

    > BANKING: Mergers loom over Bahrain’s banking system
    > OIL & GAS: Bahrain remains in pursuit of hydrocarbon resources
    > POWER & WATER: Bahrain advances utility reform
    > CONSTRUCTION: Bahrain construction faces major slowdown
    > TRANSPORT: Air Asia aviation deal boosts connectivity

    > DATABANK: Bahrain’s economy walks precarious path

    MEED COMMENTS: 
    Bahrain’s willingness to disrupt takes flight with Air Asia

    Projects shift from spending plans to investment opportunities
    Lukoil deal collapse puts $1.8bn of Iraq projects at risk
    > Clear rules drive Saudi Arabia's tariff edge

    > GULF PROJECTS INDEX: UAE fuels Gulf projects expansion

    > OCTOBER 2025 CONTRACTS: Saudi Arabia and UAE lead deal signings

    > ECONOMIC DATA: November 2025: Data drives regional projects

    > OPINIONRiyadh’s American bond

    BUSINESS OUTLOOK: Finance, oil and gas, construction, power and water contracts

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/15168493/main.gif
    MEED Editorial
  • Top deals signed at Dubai Airshow 2025

    27 November 2025

    The Dubai Airshow 2025 drew to a close on 21 November, with deals exceeding $202bn, double the $101bn secured at the 18th edition in 2023. 

    This new milestone reinforces Dubai’s position as a global aviation hub and central force shaping the future of the aviation and space industries, according to a statement from the Government of Dubai Media Office.

    The 19th edition of the event, held at Dubai World Central under the theme ‘The Future is Here’, also drew record attendance, welcoming 248,788 visitors, including industry leaders, government officials and aviation specialists from across the globe. 

    More than 1,500 exhibitors took part, with 440 participating for the first time, along with 490 military and civil delegations from 115 countries. The show also included 21 national pavilions, 98 chalets, an extra 8,000 square metres of display space, and a startup ecosystem with 120 startups and 50 investors.

    One of the most globally diverse editions to date, this year’s airshow featured the usual mega-orders, but also a surprise fleet pivot and an emerging picture of the region’s biggest players taking control of their futures by influencing the development of tomorrow’s jets and securing their supply chains. 

    Anchor customer

    UAE national carriers placed orders for 502 aircraft during the five-day event, with Emirates leading the charge. On the first day of the airshow, Emirates announced a $38bn order for 65 new Boeing 777-9 aircraft. The airline also ordered 130 GE9X engines from GE Aerospace, which power the new twin-engined planes. 

    The deal gives Boeing a boost after the 777-9’s debut was delayed to 2027 – but equally significantly, it provides strong backing for Boeing’s feasibility study to develop the 777-10, a larger variant of its 777X family, as Emirates pushes to replace its Airbus A380 fleet.

    “Emirates has been open about the fact that we are keen for manufacturers to build larger capacity aircraft, which are more efficient to operate, especially with projected air traffic growth and increasing constraints at airports,” said Sheikh Ahmed Bin Saeed Al-Maktoum, chairman and chief executive of Emirates Airline and Group.

    “We fully support Boeing’s feasibility study to develop the 777-10 and have options to convert our latest 777-9 order to the 777-10 or the 777-8.”

    Several days later, Emirates also ordered eight more A350-900 aircraft, worth $3.4bn and powered by Rolls-Royce Trent XWB84 engines, while also urging Airbus to explore a larger version of its A350-1000 wide-body.

    Emirates’ commitment to new aircraft at the Dubai Airshow 2025 is worth $41.4bn at list prices, and brings the airline’s total wide-body aircraft orders to 375, with deliveries scheduled through 2038.

    It was also announced that Emirates would deploy Starlink Wi-Fi across its entire in-service fleet, beginning with Boeing 777 aircraft in November 2025 and completing the rollout by mid-2027.

    Airbus pivot

    Flydubai also signed a memorandum of understanding (MoU) with Boeing to purchase 75 Boeing 737 MAX aircraft valued at $13bn. In one of the show’s biggest strategic shifts, a further MoU was signed with Airbus for 150 A321neo aircraft, making the airline a new Airbus customer.

    Sheikh Ahmed, also chairman and CEO of flydubai, said this addition would diversify the airline’s narrow-body fleet and “enable flydubai to play a key role in the success of Dubai World Central’s expansion plans, an airport we aim to become the largest airport in the world”.

    “We look forward to establishing a strong and enduring partnership between flydubai and Airbus,” he said. 

    Etihad Airways confirmed an order for 32 new Airbus aircraft, including freighters, marking a significant expansion of its wide-body fleet, while Gulf Air, Bahrain’s national carrier, finalised a firm order for 15 787 Dreamliners with options for three more as the carrier looks to further develop its international network. The order adds three Boeing 787s to the airline’s commitment this July and brings Gulf Air’s order book to 17 of the versatile widebody jets.

    Saudi Arabia's emerging airline, Riyadh Air, confirmed a purchase of 120 CFM LEAP-1A engines for its incoming A321neo fleet.

    Taking control

    In a clear sign that Gulf airlines are taking charge of their supply chains, Emirates and France's Safran Seats signed an MoU to bring a manufacturing and plane seat assembly factory to Dubai. The joint industrial cooperation, the first of its kind, will initially focus on Emirates’ business and economy class seats for cabin retrofit projects, with plans to expand into new aircraft in the future.

    “This agreement with Safran marks a pivotal and strategic cooperation that establishes Dubai as an aerospace manufacturing hub,” commented Sheikh Ahmed. “We're bringing world-class seat production capabilities and supply chain to our doorstep, creating highly skilled jobs, and developing capabilities to support Emirates and produce seats for export to other carriers.”

    Emirates is also securing its own engine maintenance capabilities, signing an MoU with Rolls Royce to conduct engine maintenance, repair and overhaul on its own A380 fleet at a new plant in Dubai from 2027.

    Green airline fuel

    Sustainability was a core priority at the airshow, with initiatives including the supply of sustainable aviation fuel (SAF) for participating aircraft, the use of electric and propane-powered ground support equipment in partnership with Jetex, and exhibition halls run entirely on renewable energy.

    On the sidelines of the event, Emirates and Enoc Group signed a memorandum of understanding to explore and develop joint initiatives for the supply of SAF to Emirates at its Dubai hub.

    Defence deals

    Capping the exhibition were the 36 deals signed on behalf of the Ministry of Defence and Abu Dhabi Police by the UAE’s Tawazun council – the national authority mandated to enable, regulate and sustain the UAE’s defence and security industrial ecosystem. Valued at AED25.455bn, the deals included contracts for drones, rescue gear, aircraft parts and support.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/15167232/main.gif
    Marianne Makdisi
  • Prequalification begins for Riyadh King Salman Stadium

    27 November 2025

    Register for MEED’s 14-day trial access 

    Saudi Arabia’s Sports Ministry has issued a notice inviting companies to prequalify for a contract to design and build the King Salman International Stadium in Riyadh.

    The notice was issued on 26 November, with a prequalification deadline of 16 February.

    The stadium will cover an area of about 660,000 square metres (sq m) and will have a seating capacity of 92,000.

    The stadium will feature a 150-seat royal suite, 120 hospitality suites, 300 VIP seats and 2,200 dignitary seats.

    The plan also includes several sports facilities covering more than 360,000 sq m, including two training fields and fan zones; a closed sports hall; an Olympic-sized swimming pool; an athletics track; and outdoor courts for volleyball, basketball and padel.

    The new stadium will host the final of the 2034 Fifa World Cup and will serve as the Saudi national football team’s main headquarters.

    US-based architectural firm Populous is the lead architect for the stadium.

    Construction of the stadium is expected to be completed by 2029.

    The stadium will be located next to King Abdulaziz Park.

    Saudi Arabia stadium plans

    In August last year, MEED reported that Saudi Arabia plans to build 11 new stadiums to host the Fifa World Cup in 2034.

    Eight stadiums will be located in Riyadh, four in Jeddah and one each in Al-Khobar, Abha and Neom.

    An additional 10 cities will host training bases. These are Al-Baha, Jazan, Taif, Medina, Alula, Umluj, Tabuk, Hail, Al-Ahsa and Buraidah.

    There are expected to be 134 training sites across the kingdom, including 61 existing facilities and 73 new training venues.

    The kingdom was officially selected to host the 2034 Fifa World Cup through an online convention of Fifa member associations at the Fifa Congress on 11 December 2024.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/15166460/main.jpg
    Yasir Iqbal
  • Morocco signs $861m deal for polysilicon plant

    27 November 2025

    Register for MEED’s 14-day trial access 

    Morocco has signed a MD8bn ($861m) investment agreement with GPM Holding to establish the country’s first polysilicon manufacturing plant in the southern province of Tan-Tan.

    GPM Holding is a US-based company and a key partner in Green Power Morocco (GPM), which specialises in the installation and maintenance of photovoltaic solar panels.

    GPM is a joint venture with UAE-based renewable energy company Amea Power.

    The planned facility will be located in the El-Ouatia industrial zone, according to the North African country’s Ministry of Investment.

    The facility will have an annual production capacity of 30,000 tonnes, with 85% earmarked for export.

    The plant is expected to generate 1,500 direct and more than 2,000 indirect jobs and strengthen Morocco’s position in renewable energy supply chains, particularly in the manufacturing of solar panel components, according to the Ministry of Investment.

    Last year, GPM completed a 34MW solar project in Hjar Nhal, south of Tangier, under a corporate power purchase agreement.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/15163133/main.jpg
    Wil Crisp
  • Kuwait plans gas export pipeline

    27 November 2025

    State-owned upstream operator Kuwait Oil Company (KOC) is planning a project to develop a new sour gas export pipeline from booster station 171 (BS-171).

    According to information published by KOC, the pipeline will have a diameter of 24 inches and will run from the facility known as TP-1 to the Intermediate Slug Catcher (ISC).

    The project, which is located in the southeast of Kuwait, will include the installation of bi-directional pig traps above the new pipeline.

    A pig trap is a section of piping that allows the launch or reception of a pipeline pig, a device used to clean the pipeline.

    The chosen contractor will need to provide:

    • Valves
    • Piping
    • Fittings
    • Civil services
    • Structural services
    • Electrical and instrumentation services
    • Tie-ins
    • Testing services
    • Pre-commissioning services
    • Commissioning services

    Kuwait is trying to boost project activity in its upstream sector.

    The country’s national oil company, Kuwait Petroleum Corporation, is aiming to increase oil production capacity to 4 million barrels a day (b/d) by 2035.

    In August, Kuwait announced that it was producing 3.2 million b/d.

    Earlier this month, KOC said it was planning to spend KD1.2bn ($3.92bn) on its exploration drilling programme through 2030.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/15163075/main.jpg
    Wil Crisp