Firms submit King Salman airport runway prequalification
5 February 2025

Register for MEED’s 14-day trial access
King Salman International Airport Development Company (KSIADC), backed by Saudi Arabia’s Public Investment Fund, has received prequalification forms from firms for a contract to develop the third runway and taxiways at King Salman International airport (KSIA) in Riyadh.
MEED understands that firms submitted the statements on 18 January.
KSIADC received interest from firms on 18 December for the package.
It is understood that the third runway will add to the two existing runways at Riyadh’s King Khalid International airport, which will eventually become part of KSIA.
KSIADC prequalified firms in September for the main engineering, procurement and construction (EPC) packages, early and enabling works, specialist systems and integration, specialist systems, materials and equipment, engineering and design, professional services, health, safety, security, environment and wellbeing, modular installation and prefabrication, local content and environmental, social and governance (ESG), and other services.
The entire scheme is divided into eight assets. These include:
- Iconic Terminal
- Terminal 6
- Private aviation terminal
- Central runway and temporary apron
- Hangars
- Landside transport
- Cargo buildings
- Real estate
In August, KSIADC confirmed signing up several architectural and design firms for the various elements of the project.
KSIADC confirmed that it signed up UK-based Foster + Partners to design the airport’s masterplan, including the terminals, six runways and a multi-asset real estate area.
US-based engineering firm Jacobs will provide specialist consultancy services for the masterplan and the design of the new runways.
The client also confirmed the appointment of UK-based engineering firm Mace for the delivery partner role on the project.
The airspace design consultancy contract was awarded to the local firm Nera.
Project scale
The project covers an area of about 57 square kilometres (sq km), allowing for six parallel runways, and will include the existing terminals at King Khalid International airport. It will also include 12 sq km of airport support facilities, residential and recreational facilities, retail outlets and other logistics real estate.
If the project is completed on time in 2030, it will become the world’s largest operating airport in terms of passenger capacity, according to GlobalData.
The airport aims to accommodate up to 120 million passengers by 2030 and 185 million by 2050. The goal for cargo is to process 3.5 million tonnes a year by 2050.
Saudi Arabia plans to invest $100bn in its aviation sector. Riyadh’s Saudi Aviation Strategy, announced by the General Authority of Civil Aviation (Gaca), envisages tripling Saudi Arabia’s annual passenger traffic to 330 million travellers by 2030.
It also aims to increase air cargo traffic to 4.5 million tonnes and raise the country’s total air connections to more than 250 destinations.
READ THE FEBRUARY MEED BUSINESS REVIEW
Trump unleashes tech opportunities; Doha achieves diplomatic prowess and economic resilience; GCC water developers eye uptick in award activity in 2025.
Published on 1 February 2025 and distributed to senior decision-makers in the region and around the world, the February MEED Business Review includes:
|
> AGENDA 1: Trump 2.0 targets technology
> AGENDA 2: Trump’s new trial in the Middle East
> AGENDA 3: Unlocking AI’s carbon conundrum
> GAZA: Gaza ceasefire goes into effect
> LEBANON: New Lebanese PM raises political hopes
> WATER DEVELOPERS: Acwa Power improves lead as IWP contract awards slow
> WATER & WASTEWATER: Water projects require innovation
> INTERVIEW: Omran’s tourism strategies help deliver Oman 2040
> PROJECTS RECORD: 2024 breaks all project records
> REAL ESTATE: Ras Al-Khaimah’s robust real estate boom continues
> QATAR: Doha works to reclaim spotlight
> GULF PROJECTS INDEX: Gulf projects market enters 2025 in state of growth
> CONTRACT AWARDS: Monthly haul cements record-breaking total for 2024
> ECONOMIC DATA: Data drives regional projects
> OPINION: Between the extremes as spring approaches
|
Exclusive from Meed
-
DP World awards Jafza warehouse construction deal18 March 2026
-
-
Jabal Omar plans next phase of its Mecca development18 March 2026
-
Egypt styrene project design complete18 March 2026
-
Egypt seeks financing for major petrochemicals project18 March 2026
All of this is only 1% of what MEED.com has to offer
Subscribe now and unlock all the 153,671 articles on MEED.com
- All the latest news, data, and market intelligence across MENA at your fingerprints
- First-hand updates and inside information on projects, clients and competitors that matter to you
- 20 years' archive of information, data, and news for you to access at your convenience
- Strategize to succeed and minimise risks with timely analysis of current and future market trends
Related Articles
-
DP World awards Jafza warehouse construction deal18 March 2026
Dubai-based ports operator DP World has awarded a contract to build a multi-tenant warehouse development at Jebel Ali Freezone in Dubai, UAE.
The contract was awarded to local firm Group Amana.
The development spans 141,916 square metres (sq m) and comprises 187 units across seven blocks.
These comprise warehouses, light industrial units, a retail shop, a mosque and other associated infrastructure.
The new contract builds on their existing partnership to deliver the logistics park at Jeddah Islamic Port in Saudi Arabia.
In February last year, MEED exclusively reported that Dubai’s DP World and the Saudi Ports Authority (Mawani) had awarded a SR347m ($92m) design-and-build contract to Group Amana for the project.
The scope of the contract covers construction work on the buildings under package two of the project’s first phase.
Earlier this week, MEED reported that DP World has kept its 2026 capital expenditure budget at nearly $3bn, focusing on two domestic assets and four overseas projects.
The company said in a statement that the priority developments include Jebel Ali and Drydocks World in Dubai.
Earlier this month, the group announced record financial results for 2025, with revenue up 22% to $24.4bn and adjusted earnings before interest, taxes, depreciation and amortisation (Ebitda) up 18% to $6.4bn, delivering a 26.3% margin.
DP World said this performance was driven by strong momentum across its ports and terminals and logistics business.
The group’s gross throughput rose 5.8% to 93.4 million 20-foot equivalent units.
Profit for the year increased 32.2% to $1.96bn, and operating cash flow grew 14% to $6.3bn.
Return on capital employed increased to 9.9% in 2025, up from 8.9% in 2024, reflecting stronger earnings despite ongoing geopolitical and trade uncertainty.
https://image.digitalinsightresearch.in/uploads/NewsArticle/16026660/main.png -
Egyptian firm starts building Sal’s Riyadh logistics centre18 March 2026
Egyptian contractor Rowad Modern Engineering, a subsidiary of the Elsewedy Electric Group, has begun construction on the expansion of Saudi Logistics Services Company (Sal) facilities at King Khalid International airport in Riyadh.
The scope of work includes the rehabilitation and upgrade of existing infrastructure, as well as the construction of new supporting facilities and services.
Sal started the tendering process for its SR4.2bn ($1bn) logistics zone in the north of Riyadh in September last year, as MEED reported.
UAE-based Global Engineering Consultants is the project consultant.
The logistics hub aims to meet the demand for customised warehouses located near King Khalid International airport and the Riyadh Metro.
The project is in line with Vision 2030 and the National Transport & Logistics Strategy, which aims to support the kingdom’s logistics sector and enhance Saudi Arabia’s position as a global logistics hub.
Sal and Sela signed an agreement to develop the project in March last year.
This was followed by another lease agreement for the project, which will span about 1.57 million square metres.
According to an official statement: “The lease will extend for 30 years, which is further extendable to an additional 15 years upon agreement of both parties.”
GlobalData expects the kingdom’s construction industry to record an annual average growth rate of 5.2% in 2025-28, supported by investments in transport, electricity, housing and tourism infrastructure projects, as well as the $850bn-plus gigaprojects programme.
Growth will also be supported by government investments in rail, dams, industrial and road infrastructure projects.
The industrial sector is estimated to grow by 3.3% in 2025-28, supported by investments in the development of manufacturing, logistics, chemicals and pharmaceuticals plants.
https://image.digitalinsightresearch.in/uploads/NewsArticle/16026154/main.gif -
Jabal Omar plans next phase of its Mecca development18 March 2026
Saudi Arabian developer Jabal Omar Development Company is carrying out planning for phase seven of its Jabal Omar master development in Mecca, according to a fourth-quarter 2025 financial presentation.
The company said phase seven will be a mixed-use scheme comprising hotels, retail and residential components, but did not disclose a breakdown of the project elements.
Jabal Omar plans to use a development partnership model for the phase to minimise capital expenditure.
Separately, the developer said it is targeting the delivery of 1,346 hotel keys and more than 20,000 square metres of gross leasing area in phase four by 2027.
Rotana Jabal Omar Makkah, comprising 655 keys, is due to be fully operational in the first quarter of 2026, after 450 keys began operating in the final week of December 2025.
The 1,141-key Sofitel is scheduled to become operational in the fourth quarter of 2026, while the 20,000 square metres of gross leasable area is expected to be ready in 2027.
Jabal Omar estimates its 2026 capital expenditure at SR1.1bn ($293m), with spending expected to fall once the phase four hotels are completed.
https://image.digitalinsightresearch.in/uploads/NewsArticle/16026145/main.png -
Egypt styrene project design complete18 March 2026
Early design work has been completed for a planned styrene production project in Egypt’s Alexandria region, according to information released by state-owned Egyptian Petrochemicals Holding Company (Echem).
The front-end engineering and design (feed) has now been finished for the 300,000-tonne-a-year project, and investment costs are currently under evaluation.
The plant is planned to be built in El-Dekheila in Alexandria, where around 104,000 square metres of land have been allocated for the facility.
Early site preparation works have been completed, and startup is currently targeted for 2030, according to Echem.
The styrene technology licence agreement has been signed, and the total investment cost is being evaluated.
The shareholding structure of the project company is still under study and feedstock requirements for the plant are expected to include:
- 85,000 tonnes a year of ethylene, which is expected to be supplied locally
- 235,000 tonnes a year of benzene, part of which is expected to be imported
Egypt’s chemicals sector has been disrupted by the US and Israel’s war with Iran.
The war has led to high liquefied natural gas (LNG) prices and Israel shutting off gas flows into the country.
MEED’s March 2026 report on Egypt includes:
> COMMENT: Egypt’s crisis mode gives way to cautious revival
> GOVERNMENT: Egypt adapts its foreign policy approach
> ECONOMY & BANKING: Egypt nears return to economic stability
> OIL & GAS: Egypt’s oil and gas sector shows bright spots
> POWER & WATER: Egypt utility contracts hit $5bn decade peak
> CONSTRUCTION: Coastal destinations are a boon to Egyptian constructionTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/16024817/main.jpg -
Egypt seeks financing for major petrochemicals project18 March 2026
Egypt is working on the financing arrangements for an integrated refining and petrochemicals complex in the Suez Canal Economic Zone (SCZone), which will have a capacity of 3.5 million tonnes a year, according to information provided by the state-owned Egyptian Petrochemicals Holding Company (Echem).
Front-end engineering and design (feed) for the first phase and a financing arrangement are under way for the project, which will be implemented by Red Sea National Petrochemicals Company (RSNPC).
A process design package (PDP) covering 14 technology licences has been issued, defining the configuration of the complex, which is estimated to be worth several billion dollars.
A land agreement for the project has been signed, and permits and regulatory approvals are being obtained, Echem said.
The project has stalled for more than three years due to financial issues, but Echem is optimistic about progress.
A company has already been established to develop and operate the facility and startup is currently targeted for the second quarter of 2030, according to Echem.
The project will cover an area of 3.56 million square metres. The project integrates both a refinery and a mixed-feed cracker.
Phase 1 will produce polyethylene (PE) and polypropylene (PP).
Phase 2 will add the production of benzene, polyethylene terephthalate (PET), paraxylene, mono ethylene Glycol (MEG), di-ethylene glycol (DEG) and purified terephthalic acid (PTA).
In July 2025, RSNPC and China National Chemical Engineering Company (CNCEC) signed a non-binding framework agreement for the project in Beijing.
Egypt’s Ministry of Petroleum & Mineral Resources has said that CNCEC has expressed its willingness to potentially contribute to the project’s equity and possibly help arrange financing covering up to 85% of the value of the project’s engineering, procurement and construction (EPC) contracts.
In April 2025, a consortium of CNCEC, along with Egypt’s Petrojet and Enppi, was awarded the feed contract for phase 1.
https://image.digitalinsightresearch.in/uploads/NewsArticle/16024816/main.jpg