Diriyah prepares more superblock tenders
8 July 2025
Saudi gigaproject developer Diriyah Company is preparing to tender more superblock packages this quarter, following the receipt of prequalification statements from interested firms last week.
MEED understands that notices were issued in mid-June for packages that include the Waldorf Astoria superblock and the Edition superblock, both located in the second phase of the Diriyah Gate development (DG2).
The Waldorf Astoria superblock is a mixed-use development featuring the Waldorf Astoria Residences & Hotel, commercial and residential facilities and office spaces.
The Waldorf Astoria Hotel is a 200-key property, whereas Waldorf Astoria Residences will offer over 46 branded residences.
The project is located along the Grand Boulevard South and the Northern Arterial Road in the Boulevard Northwestern district at DG2.
The prequalification statements for this package were submitted on 29 June.
Prequalification statements for the Edition superblock were submitted on 2 July.
This package comprises a mix of residential, commercial and office spaces, including the 200-key Edition Hotel and 150-key Equinox Hotel.
The project is situated between King Khalid Road and the Grand Boulevard within the Boulevard East district in DG2.
Last week, MEED reported that Diriyah Company had received prequalification statements from firms interested in constructing the upcoming Radisson Red superblock in DG2.
The Radisson Red superblock comprises a hotel, residential apartments, retail facilities, commercial office spaces and a park.
The project is situated in the Boulevard East district, between King Khalid Road and the Grand Boulevard in Diriyah.
Diriyah also tendered a contract in April to build the new iconic museum in the DG2 area.
The same month, MEED exclusively reported that the client had awarded an estimated SR4bn ($1.1bn) contract for a utilities relocation package for the King Saud University (KSU) project located in DG2.
The contract was awarded to the joint venture of Beijing-headquartered China Railway Construction Corporation and China Railway Construction Group Central Plain Construction Company.
Also in April, MEED reported that the company had awarded an estimated SR5bn ($1.3bn) construction deal to build the Royal Diriyah Opera House.
The contract was awarded to a joint venture of local firm El-Seif Engineering & Contracting, Beijing-headquartered China State Construction Engineering Corporation and Qatari firm Midmac Contracting.
Tendering activity is progressing on several other major schemes at Diriyah, including the King Khalid Road project, which passes through the development. The client received bids from firms in the second week of April for the main construction works on this project.
The client is also expected to finalise the contract award shortly for the Arena Block assets in the Boulevard Southwest section in the DG2 area.
Diriyah gigaproject
The Diriyah masterplan envisages the city as a cultural and lifestyle tourism destination. Located northwest of Riyadh’s city centre, it will cover 14 square kilometres and combine 300 years of history, culture and heritage with hospitality facilities.
The company awarded several significant contracts last year, including three contracts worth over SR21bn ($5.5bn). These included an estimated $2bn contract awarded to a joint venture of El-Seif Engineering & Contracting and China State to build the North Cultural District.
In July last year, Diriyah also awarded a $2.1bn package to a joint venture of local contractor Albawani and Qatar’s Urbacon to construct assets in the Wadi Safar district of the gigaproject.
Then in December, Diriyah Company awarded an estimated SR5.8bn ($1.5bn) contract to a joint venture of local firm Nesma & Partners and local branch of Man Enterprise for its Jabal Al-Qurain Avenue cultural district, located in the northern district of the Diriyah Gate project.
Once complete, Diriyah will have the capacity to accommodate 100,000 residents and visitors.
Exclusive from Meed
-
Kafd monorail in Riyadh to commence operations in 2027
25 August 2025
-
-
Acwa Power, SEC and Kepco close $4bn Saudi IPP deals
25 August 2025
-
Riyadh Metro Line 2 is a bellwether for Saudi construction
25 August 2025
-
Kuwait extends bid deadline for Mutriba upstream project
25 August 2025
All of this is only 1% of what MEED.com has to offer
Subscribe now and unlock all the 153,671 articles on MEED.com
- All the latest news, data, and market intelligence across MENA at your fingerprints
- First-hand updates and inside information on projects, clients and competitors that matter to you
- 20 years' archive of information, data, and news for you to access at your convenience
- Strategize to succeed and minimise risks with timely analysis of current and future market trends

Related Articles
-
Kafd monorail in Riyadh to commence operations in 2027
25 August 2025
Saudi Arabia’s King Abdullah Financial District Development & Management Company (Kafd DMC) is expected to begin monorail operations in 2027.
According to local media reports, Faddy Alaql, chief asset delivery officer at Kafd, said construction is anticipated to begin by the end of this year, with the project ready for commissioning by 2027.
The scope of work includes the construction of a 3.6-kilometre elevated monorail in a loop configuration, with six elevated stations and six trains – each consisting of two carriages.
The monorail will connect public buildings within Kafd and integrate with the Riyadh Metro system.
It is expected to carry up to 3,500 passengers an hour during peak times.
In October last year, MEED exclusively reported that Kafd DMC had awarded an estimated SR1.2bn ($320m) deal to complete its monorail project at Riyadh’s King Abdullah Financial District.
The contract was awarded to the joint venture of Egyptian contractor Hassan Allam and Chinese rolling stock provider CRRC.
French engineering firm Systra is understood to have updated the technical and supervision studies for both systems and civil engineering works.
Project background
According to data from regional projects tracker MEED Projects, the scheme was put on hold in 2016 after a decade of planning.
In 2010, Bombardier, now part of French firm Alstom, won a $241m contract to build the monorail.
Bombardier, in partnership with local contractor Saudi Oger, was selected to provide its Innovia operation and maintenance services for the system over a 10-year period.
Located in Riyadh, Kafd is a mixed-use development managed by Kafd DMC, a wholly owned subsidiary of the kingdom’s Public Investment Fund (PIF).
The district was previously managed by Rayadah Investment Corporation.
Construction contracts for several towers in the district were awarded in 2009.
The project stalled when work was approximately 70% complete and later resumed in 2018, after the PIF took over from the Public Pension Agency in 2016-17.
https://image.digitalinsightresearch.in/uploads/NewsArticle/14535623/main.jpg -
Iraq deploys Turkish power ships to ease electricity shortfall
25 August 2025
Iraq’s Ministry of Electricity has begun deploying electricity-generating ships to bolster the national power system. The first Turkish vessel, capable of producing 125MW, arrived at Umm Qasr Port on Thursday.
Minister of Electricity Ziyad Ali Fadhil told the Iraqi News Agency that the ships are part of a government plan to add 600MW to the national grid while reducing reliance on imported fuel.
“The Council of Ministers has taken decisions related to purchasing energy through barges to enhance the electricity system’s production and reduce dependence on imported fuel,” he said.
The second vessel, Orka Sultan, arrived at Khor Al-Zubair Port in Basra province on Saturday. It docked at berth 13 and has the same capacity of 125MW, bringing the combined output of the two vessels to 250MW.
Fadhil said the first barge will be fully docked at the quay within seven days of fuel delivery and will begin generating electricity within the same period.
Preparations are under way to supply gas oil fuel for the operation of both stations once the operating company takes over.
The vessels are part of a project led by BKPS, a Karpowership affiliate, to deploy its signature powerships to support Iraq’s energy security.
The deployment comes as Iraq faces near-nationwide blackouts, with recent temperatures as high as 50 degrees Celsius (122 degrees Fahrenheit) driving electricity demand for air conditioning.
The country periodically suffers from power outages, especially during the summer months, when increased cooling requirements overwhelm its power plants and electricity grid.
The country’s power shortfall has been exacerbated by underinvestment in infrastructure, repeated heatwaves and disruptions to gas imports from neighbouring Iran.
The Turkish vessels are part of a broader model of floating power stations, often deployed by companies such as Karpowership to countries needing electricity but lacking the time or resources to build permanent onshore capacity.
Karpowership said in a statement that it will “provide electricity for an initial contract period of 71 days”, helping to stabilise the national grid and meet demand.
https://image.digitalinsightresearch.in/uploads/NewsArticle/14534752/main.jpg -
Acwa Power, SEC and Kepco close $4bn Saudi IPP deals
25 August 2025
Register for MEED’s 14-day trial access
Acwa Power, Saudi Electricity Company (SEC) and Korea Electric Power Corporation (Kepco) have achieved financial close for the 3,600MW Rumah 1 and Nairyah 1 independent power producer (IPP) projects in Saudi Arabia. The two projects represent a total investment of about SR15bn ($4bn).
Saudi Power Procurement Company is the principal buyer for the projects, responsible for tendering and power offtake. Ownership of the project companies, Remal Energy Company for Rumah 1 and Naseem Energy Company for Nairyah 1, is split between Acwa Power (35%), SEC (35%) and Kepco (30%).
The projects form part of the Saudi Energy Ministry’s plan to maximise local power supply in line with Vision 2030.
They also support the kingdom’s net-zero 2060 target and allow for future integration of carbon capture facilities.
Financing was secured from a syndicate of local, regional and international lenders, including Export Import Bank of Korea, Saudi National Bank, Saudi Investment Bank, Banque Saudi Fransi, Standard Chartered Bank, Bank of China, Agricultural Bank of China, Industrial & Commercial Bank of China and Arab Petroleum Investments Corporation.
MEED reported in Novemeber that the Acwa, SEC and Kepco consortium had won the contracts to develop the two combined-cycle gas turbine IPPs. Tokyo-headquartered Mitsubishi Power was to supply the gas turbines to power the plants.
The team offered a levelised electricity cost of 4.5859 $cents a kilowatt-hour ($c/kWh) for Rumah 1 and 4.6114 $c/kWh for Nairiyah 1.
Rumah 1 involves the construction of a combined-cycle gas turbine plant with a capacity of 1,800MW in Riyadh Province. The project will be developed by Remal Energy Company with an investment of SR7.5bn ($2bn).
Nairyah 1, also with a capacity of 1,800MW, will be built in the Eastern Province and developed by Naseem Energy Company. The investment value is about SR7.5bn ($2bn)
https://image.digitalinsightresearch.in/uploads/NewsArticle/14534558/main3558.jpg -
Riyadh Metro Line 2 is a bellwether for Saudi construction
25 August 2025
Commentary
Colin Foreman
EditorSpeaking to MEED at the end of the first quarter of this year, one of the region’s most active construction companies identified a bellwether project for 2025: the expansion of Riyadh Metro’s Line 2.
At the time, much of the conversation in the market centred on the reprioritisation of projects in Saudi Arabia and expected budget cuts to some of the kingdom’s largest developments. The reasoning was that if the Line 2 project proceeded, it would signal that Riyadh remains committed to delivering key infrastructure.
On 18 July, the Royal Commission for Riyadh City awarded the Arriyadh New Mobility Consortium the estimated $800m-$900m contract. A few weeks later, Riyadh Metro Transit Consultants, a joint venture of US-based Parsons and French engineering firms Egis and Systra, was confirmed as the project management and construction supervision consultant.
The 8.4-kilometre (km) extension, comprising 1.3km of elevated track and 7.1km underground, includes two elevated stations and three underground stations.
It will run from King Saud University (KSU) to new stations at KSU Medical City, KSU West, Diriyah East and Diriyah Central – where it will interchange with the planned Line 7 – and finally to Diriyah South.
The alignment is important as it provides a vital transport link for the $63bn Diriyah project and builds on the popularity of the existing metro network, which opened at the end of 2024.
It also shows contractors that while there is talk of a reprioritisation, opportunities for work on major projects remain.
https://image.digitalinsightresearch.in/uploads/NewsArticle/14534394/main.png -
Kuwait extends bid deadline for Mutriba upstream project
25 August 2025
Kuwait Oil Company (KOC) has extended the bid submission deadline for the contract to develop the planned Mutriba remote boosting facility in Kuwait.
The project was originally tendered earlier this year, with a bid submission deadline of 29 June 2025.
The deadline has now been extended from 17 August to 9 September 2025.
The project has an estimated budget of about KD130m ($420m) and its scope includes:
- Development of the Mutriba oil field
- Installation of the degassing station
- Installation of manifolds
- Installation of condensate facilities
- Installation of wellhead separation units
- Installation of the pumping system
- Installation of wellhead facilities
- Installation of oil and gas treatment plants
- Installation of a natural gas liquids plant
- Installation of a water and gas injection plant
- Construction of associated utilities and facilities
The onshore Mutriba oil field is located in northwest Kuwait.
In October 2024, KOC announced that it was preparing to tender a project management contract for a scheme to develop the field.
At the time, it said four international companies had been invited to participate in the tender process.
These were:
- Schlumberger (US)
- Halliburton (US)
- Baker Hughes (US)
- Weatherford International (US)
KOC also said that the list of qualified companies could be extended before the invitation to bid was issued.
https://image.digitalinsightresearch.in/uploads/NewsArticle/14531471/main.jpg