Decision imminent for UAE West Link project

5 November 2025

 

The UAE’s Etihad Rail is expected to finalise the contract by next month to build the 40-kilometre West Link project, which will connect the Abu Dhabi mainland to islands in the Gulf near Qatar.

“The early contractor involvement (ECI) bid evaluation is in advanced stages, and the decision is expected in a few weeks,” sources close to the project told MEED.

In June, MEED reported that the UAE had engaged two contracting groups on an ECI basis for the project.

The two contracting groups selected are: Greece’s Archirodon partnering with local Western Bainoona Group (with Hewson Consulting as design firm), and Beijing-based China Harbour Engineering Corporation partnering with local NMDC (with Subana Jurong as design firm).

The project involves constructing a 40km road link with two lanes in each direction. The road is planned to start near Ras Ghumais in the Western Region and extend to a ferry terminal on Makasib Island, which will then connect to Qatar.

The ECI process requires selected contractors to submit methodologies for the project and a design proposal during the initial stages of procurement. It is understood that the conceptual design and social, economic and business case studies commenced early last year.

The project is being overseen by the UAE’s Etihad Rail.

Previous plans

In 2005, Abu Dhabi and Doha were reported to have been setting up a joint company to oversee the implementation of a proposed UAE-Qatar causeway.

The crossing would have significantly cut journey times. At present, traffic between Qatar and the UAE has to pass through 125km of Saudi Arabian territory.

Back then, the causeway was planned to start near Sila in Abu Dhabi and extend to the south of Doha.

The scheme ultimately stalled. Problems included difficulties with the route, which infringed on Saudi Arabia’s territorial waters.

In June 2017, the UAE, Saudi Arabia, Bahrain and Egypt severed diplomatic and economic ties with Qatar, preventing any potential joint infrastructure projects.

In January 2021, the Al-Ula Declaration restored diplomatic ties, and economic cooperation has gradually resumed.


READ THE NOVEMBER 2025 MEED BUSINESS REVIEW – click here to view PDF

Mena players up the ante in global LNG production race; Investment takes UAE non-oil economy from strength to strength; Project finance activity draws international lenders back to market

Distributed to senior decision-makers in the region and around the world, the November 2025 edition of MEED Business Review includes:

To see previous issues of MEED Business Review, please click here
https://image.digitalinsightresearch.in/uploads/NewsArticle/15022762/main.jpg
Yasir Iqbal
Related Articles