Decarbonising steel is hard to resist

29 October 2024

Commentary
Jennifer Aguinaldo
Energy & technology editor

A pilot green hydrogen plant supplying a small amount of colourless gas that will be used to extract iron from iron ore – a key steelmaking step – is not a big deal, especially given the multibillion-dollar industrial and petrochemicals investments that this region has grown accustomed to over the past decades.  

The project can be seen as a just one element of Abu Dhabi's multi-pronged strategy to decarbonise large swathes of its economy, given that the client for this project, the newly rebranded Emsteel, holds a 60% share in the local steel industry and exports products to about 70 countries.    

The global steel industry accounts for about 7% of annual greenhouse gas (GHG) emissions.

On one hand, it will take a lot more than a few electrolysers to produce hydrogen that will be used to further decarbonise Emsteel's production and operations; on the other, a small first step is required to make a future big leap given the enormity and urgency of the challenge, and the vast investment it requires.

Specific details are sparse regarding the pilot plant and the future timeline to scale hydrogen production at Emsteel's manufacturing complex in Abu Dhabi.

However, as the executives of Emsteel and its hydrogen partner, Abu Dhabi Future Energy Company (Masdar), have said, the completion of the pilot project is a vital first step towards producing certifiable green steel, which is expected to enjoy brisk demand as pressures to decarbonise sectors such as construction increase across the globe.

As it is, Emsteel's credentials include being the world's first steelmaker to capture part of its carbon dioxide emissions, thanks to Abu Dhabi National Oil Company's (Adnoc) Al-Reyadah carbon capture, utilisation and storage facility. This has enabled the company to operate with "45% less carbon intensity than the global average". Its utilisation of clean energy also rose above 80% last year.

Today, from the vantage point of the stakeholders, the specific details of the pilot project matter less than what it signifies, which is that Abu Dhabi intends to become a major green steel producer, and that it can transform a hard-to-abate sector into a hard to resist one.

 

https://image.digitalinsightresearch.in/uploads/NewsArticle/12812275/main.jpg
Jennifer Aguinaldo
Related Articles
  • Populous wins Bahrain Sports City contract

    21 April 2026

     

    US-based engineering firm Populous has won a BD5m ($13.5m) contract for the Sports City development at Sakhir in Bahrain.

    The contract was awarded by Bahrain’s Ministry of Works, Municipalities Affairs & Urban Planning.

    The scope covers pre-contract consultancy services, including finalising the masterplan and internal infrastructure, completing phase 1A design works and preparing tender documents.

    Populous is a specialist sports venue designer that formerly operated as part of HOK Group.

    The contract was first tendered in 2021, when Populous emerged as the sole bidder.

    At the time, it was reported that Sports City would include Bahrain’s largest sports stadium and a multi-purpose indoor sports arena.

    The project is expected to provide renewed impetus to Bahrain’s construction and transport sector, which has struggled in recent years, with the total value of awarded contracts falling for a third consecutive year.

    According to regional project tracker MEED Projects, about $400m-worth of contracts had been awarded in Bahrain by the end of October last year – less than half the $1.2bn recorded during the same period the previous year.

    The sector has yet to return to pre-pandemic levels. Before 2020, Bahrain consistently awarded more than $2bn in contracts annually, peaking at nearly $4bn in 2016.

    Bahrain’s construction industry is forecast to record average annual growth of 4.9% in 2026-29, supported by investments in transport infrastructure and renewable energy projects aligned with Bahrain’s Economic Vision 2030.

    Vision 2030 includes the BD11.3bn ($30bn) Strategic Projects Plan, unveiled in October 2021, encompassing 22 national infrastructure projects. It also includes plans to create five new cities by 2030: Fasht Al-Jarm, Suhaila Island, Fasht Al-Azem, Bahrain Bay and the Hawar Islands.

    Growth over the forecast period is also expected to be driven by investments under the National Renewable Energy Action Plan, which targets a 30% reduction in carbon emissions by 2035, compared to 2015 levels, and aims to achieve net-zero emissions by 2060.


    READ THE APRIL 2026 MEED BUSINESS REVIEW – click here to view PDF

    Economic shock threatens long-term outlook; Riyadh adjusts to fiscal and geopolitical risk; GCC contractor ranking reflects gigaprojects slowdown.

    Distributed to senior decision-makers in the region and around the world, the April 2026 edition of MEED Business Review includes:

    > GCC CONTRACTOR RANKING: Construction guard undergoes a shift
    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/16487784/main.jpg
    Yasir Iqbal
  • Entries now open for MEED Projects Awards 2026

    21 April 2026

    Enter the awards

    The MEED Projects Awards in association with Mashreq 2026 have officially opened for entries, inviting companies, developers, contractors and project teams to submit their projects for the region’s most prestigious construction awards.

    For over 15 years, the MEED Projects Awards have celebrated the Middle East and North Africa’s most ambitious and transformative projects, recognising technical excellence, innovation, sustainability and delivery impact. Past editions have highlighted landmark developments that set new benchmarks for the region’s built environment, including internationally recognised projects such as Burj Khalifa and Louvre Abu Dhabi.

    “The MEED Projects Awards are the gold standard for recognising outstanding achievements in construction across Mena, showcasing the region’s technical and design excellence while bringing the industry together to celebrate and connect over the very best projects of the year,” said Ed James, head of content and research at MEED.

    “As a long-standing partner of the MEED Projects Awards, Mashreq is proud to support a programme that is recognised for its independence, credibility and industry impact. These awards celebrate projects that set benchmarks for excellence and contribute meaningfully to the region’s development,” said Arun Mathur, executive vice-president and global head of contracting finance at Mashreq.

    Winners are chosen through a rigorous, independent judging process, led by a panel of more than 50 senior industry experts representing developers, contractors, engineers and project specialists. The awards celebrate projects across a wide range of sectors, including Building, Transport, Energy, Water, Healthcare, Education, Hospitality, Culture, Industrial, Power, Small Projects and Developments.

    Being shortlisted or winning a MEED Projects Award places a project among the region’s elite, offering regional recognition, global exposure and industry credibility.

    Submissions are now open, with full category details and entry guidelines available on the official entry platform.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/16487756/main.gif
    MEED Editorial
  • Work advances on Saudi Maaden mine renewables project

    21 April 2026

     

    Local contractor Arabian Qudra Company is advancing construction works on an integrated solar photovoltaic (PV) and battery energy storage system (bess) project at the Al-Baitha bauxite mine in Saudi Arabia.

    The off-grid facility will integrate an 8MWp solar PV array with a 30MWh bess, allowing the mine to operate almost entirely on renewable energy.

    Emerge, a joint venture of Masdar and EDF Power Solutions, is developing the project, including managing financing, design, procurement, construction, operation and maintenance.

    Last August, MEED reported that Maaden Bauxite & Alumina Company (MBAC), a subsidiary of Saudi Arabian Mining Company (Maaden), had signed a 30-year power purchase agreement with Emerge to supply its Al-Baitha bauxite mine with renewable energy.

    Arabian Qudra Company was subsequently appointed as the engineering, procurement and construction (EPC) contractor, with works beginning at the start of 2026.

    The firm is a subsidiary of Abunayyan Holding Company, a privately owned Saudi industrial group.

    The project is expected to generate around 17,300MWh of electricity annually and provide a continuous 24/7 power supply. It will reduce carbon dioxide emissions by approximately 13,800 tonnes a year.

    According to projects tracker MEED Projects, construction is expected to be completed in early 2028.

    Maaden Solar 1

    Maaden is also in the early stages of developing Maaden Solar 1, potentially the world’s largest solar process heat plant. 

    MEED previously reported that US-based GlassPoint had partnered with Saudi Arabia’s Ministry of Investment as a first step towards construction of the planned $1.5bn project.

    In 2025, Spain-headquartered Cox Energy signed a collaboration agreement with the client to participate in the project. The client had been expected to invest approximately $31.1m in the first phase of the project.

    Once complete, Maaden Solar 1 will be a 1,500 megawatt-thermal (MWth) facility. A timeline for the project remains unclear, with construction not expected to begin until at least 2027.


    READ THE APRIL 2026 MEED BUSINESS REVIEW – click here to view PDF

    Economic shock threatens long-term outlook; Riyadh adjusts to fiscal and geopolitical risk; GCC contractor ranking reflects gigaprojects slowdown.

    Distributed to senior decision-makers in the region and around the world, the April 2026 edition of MEED Business Review includes:

    > GCC CONTRACTOR RANKING: Construction guard undergoes a shift
    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/16487404/main.jpg
    Mark Dowdall
  • Egypt to build Olympic Village project on Red Sea

    21 April 2026

    Egypt has moved to back a major new sports development on the Red Sea coast, officially assigning a 225-acre plot for a planned Olympic Village in the Red Sea Governorate.

    The site is located opposite the resort destination of El-Gouna, giving the project access to an established tourism corridor.

    The development is intended to strengthen Egypt’s ambition to become a hub for international sports tourism, with facilities designed to support large-scale regional and global championships.

    Plans include stadiums and purpose-built arenas designed to meet Olympic-level requirements, enabling the complex to accommodate multiple sports and event formats.

    To support visiting delegations and spectators, the Olympic Village is expected to include on-site hospitality facilities, including a hotel.

    The project is intended to operate as an integrated, self-contained destination capable of staging regional and international tournaments, while also leveraging the Red Sea’s year-round appeal for camps, friendlies and seasonal training programmes.

    According to UK analytics firm GlobalData, Egypt’s residential construction sector is expected to grow by 8.3% from 2026 to 2029, supported by investments in the housing sector and the government’s focus on addressing the country’s growing housing deficit amid a rising population.

    The commercial construction sector is expected to register real-term growth of 6.6% in 2026-29, supported by a rebound in the tourism and hospitality markets and an improvement in investment in office buildings and wholesale and retail trade activities.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/16485900/main.jpg
    Yasir Iqbal
  • Algeria launches oil and gas licensing round

    21 April 2026

    Algeria has launched a new bid round offering seven exploration blocks to international companies.

    The round was launched by the National Agency for the Valorisation of Hydrocarbon Resources (Alnaft), which manages and regulates the upstream oil and gas sector in the country.

    The blocks are located in the regions of Ouargla, Illizi, Touggourt and El-Bayadh. Both oil and gas assets are included.

    The blocks on offer are:

    • Est Bordj Omar Driss 1
    • Illizi Centre 1
    • El-M’Zaid Nord
    • El-Borma 2
    • El-Hadjira 3
    • El-Benoud Est
    • Touggourt Sud

    Technical evaluation of bids will cover exploration, development and production optimisation plans.

    All bids – except those for Est Bordj Omar Driss 1– will also be assessed against financial criteria, including the bidder’s participation rate in financing upstream operations.

    Successful bidders will access the assets through contracts with Sonatrach, either via production service agreements or participation agreements, depending on the block.

    Algeria is currently seeing an uptick in demand for its gas exports due to the disruption to exports from Qatar and the UAE in the wake of the US and Israel’s attack on Iran on 28 February.


    READ THE APRIL 2026 MEED BUSINESS REVIEW – click here to view PDF

    Economic shock threatens long-term outlook; Riyadh adjusts to fiscal and geopolitical risk; GCC contractor ranking reflects gigaprojects slowdown.

    Distributed to senior decision-makers in the region and around the world, the April 2026 edition of MEED Business Review includes:

    > GCC CONTRACTOR RANKING: Construction guard undergoes a shift
    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/16478927/main.png
    Wil Crisp