Adnoc selects Cobra-led team for PPP project

20 March 2023

Abu Dhabi National Oil Company (Adnoc) is understood to have selected a team led by Spain's Cobra Instalaciones for the contract to develop a seawater treatment plant and transmission pipeline in Mirfa as part of its Project Wave.

The selected consortium includes Egypt's Orascom and Metito.

Industry sources previously told MEED that the contract has an estimated value of $2bn-$2.5bn.

Adnoc received three bids for the contract to develop the project in September 2022. 

The other companies that submitted proposals for the contract were:

  • Vision International (Saudi Arabia) / Veolia (France)
  • Marubeni Corporation (Japan)

MEED reported in December that Adnoc was undertaking separate negotiations with teams led by Cobra and Saudi Arabia's Vision International.

Neither team submitted an updated bid for the contract at the end of last month.

It is understood that the client had requested bidders to arrange a 100 per cent debt commitment from banks before resubmitting their proposals.

The package involves the development of a nanofiltration plant with a capacity of 115 million imperial gallons a day (MIGD) in Mirfa.

The scheme includes the plant's seawater intake and outfall facilities, a pumping station and a 75-kilometre water transmission pipeline to the Bab and Bu Hasa oil fields.

Adnoc and Abu Dhabi National Energy Company (Taqa) will own 51 per cent of the special purpose vehicle that will implement the project, while the selected developer or developer consortium will own 49 per cent. 

The clients issued the requests for qualifications for the contract to develop two seawater treatment plants and associated facilities in March 2021.

Scope

Project Wave will replace the current aquifer water injection systems used to maintain reservoir pressure in all onshore oil fields in Abu Dhabi. It aims to utilise seawater as an additional source for enhanced oil recovery-based injection into Abu Dhabi's onshore fields.

It is understood that Project Wave's second package, in Al-Nouf, will be tendered separately. 

The two planned standalone greenfield seawater nanofiltration plants were to have a combined treatment capacity of about 210 MIGD. This is understood to have been expanded.

The two seawater treatment plants will be implemented on a build-own-operate-transfer (BOOT) basis.

Adnoc had indicated that it expects the plants to commence commercial operations in 2025. 

Adnoc will be the sole offtaker of the treated seawater at the battery limit of the Adnoc Onshore fields.

A team of UK-based Alderbrook Finance and Saudi Arabia-based SMBC are the financial advisers to the client for the BOOT projects. Austria-headquartered ILF Consulting Engineers is the technical adviser.

https://image.digitalinsightresearch.in/uploads/NewsArticle/10687985/main2508.gif
Jennifer Aguinaldo
Related Articles
  • Contractor appointed for Abu Dhabi Riviera residences

    1 July 2026

     

    Dubai-based real estate developer Mered has appointed Turkiye’s Sera Group as the main contractor for its Riviera Residences project on Al-Reem Island in Abu Dhabi.

    The development will comprise more than 400 one- to three-bedroom apartments and 11 villas.

    Lebanese engineering firm Dar Al-Handasah is the project consultant, while Switzerland’s Herzog & de Meuron is the architect.

    The enabling works are being carried out by local contractor NSCC International.

    Mered and Sera Group are also working together on the Iconic Tower project in Dubai Internet City, where the developer awarded the main contract in December 2024.

    The 67-storey tower is being built on a site covering about 6,368 square metres.

    Local firm Mirage is the project consultant, while Singapore-based Hirsch Bedner Associates is the project architect.

    Dubai-based Chawla Architectural & Consulting Engineers is the architect of record, and Omnium International is the quantity surveyor.

    The foundation works were carried out by local firm Dutch Foundations.

    Mered’s latest contract awards in the UAE market come amid heightened real estate and construction activity, with schemes worth more than $323bn at the execution or planning stages, according to UK-based analytics firm GlobalData.

    GlobalData forecasts that output from the UAE’s residential construction sector will grow by 3% in real terms in 2026-29, supported by infrastructure, energy and utilities developments, as well as residential construction projects.


    READ THE JULY 2026 MEED BUSINESS REVIEW – click here to view PDF

    Stress test for Gulf aviation; Mixed performance as country outlooks diverge in the Levant; GCC tourism sector pivots from crisis to recovery mode.

    Distributed to senior decision-makers in the region and around the world, the July 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/17509888/main.jpg
    Yasir Iqbal
  • Aramco extends deadline for Ras Tanura refinery gas pipeline

    1 July 2026

     

    Saudi Aramco has granted contractors more time to prepare bids for a tender to replace a pipeline in the Gas Line Abqaiq–Ras Tanura (GART) transmission network.

    The GART grid transports associated gas and natural gas liquids (NGL) from the Abqaiq oil processing complex as feedstock, northwards to the Ras Tanura refinery in Saudi Arabia’s Eastern Province.

    The aim of the project is to replace the GART-22 pipeline that connects the Juaymah export terminal on the Gulf coast in the Eastern Province to the Ras Tanura refinery, to ensure reliable fuel gas supply and meet ongoing demand.

    The basic scope of work for the project is to install a new 24-inch pipeline system to replace the GART-22 line and the abandoned GART-24 line. It will cover a distance of 18 kilometres between Juaymah and the Ras Tanura terminal.

    The scope also includes the installation of associated scraper trap facilities (launcher and receiver), pressure control valves, motor-operated valves and gas detection and sampling systems.

    Aramco issued the tender for the project in May, setting an initial deadline of 30 June for contractors to submit proposals, MEED previously reported.

    The Saudi energy giant has now extended that deadline until 10 July, according to sources.

    The following contractors, among others, are understood to be bidding for the project:

    • ACE Pipeline Arabia
    • Combined Group Contracting Company
    • Gas Arabian Services Company
    • Max Streicher Saudi Arabia
    • National Basics Company
    • Saad Ali Alessa Group
    • Sicim
    • Sinopec Engineering Group Saudi
    • Tecton Engineering & Construction
    Ras Tanura refinery complex

    The Ras Tanura refinery is the oldest, and one of the largest, crude oil refineries in Saudi Arabia. The complex has a refining capacity of 550,000 barrels a day (b/d).

    The facility also has a 305,000 b/d NGL processing facility, a 960,000 b/d crude stabilisation facility, combined steam and gas turbine electrical power generation plants with a summer capacity of 145MW and a winter capacity of 158MW, and a combined 150-pound and 600-pound steam capacity of 6,217 million pounds an hour.

    It has 75 crude oil and products storage tanks with a combined capacity of 5.8 million barrels.

    The Ras Tanura refinery’s major facilities include a 325,000 b/d crude distillation unit, a 225,000 b/d gas condensate distillation unit, a 50,000 b/d hydrocracker and 107,000 b/d of catalytic reforming capacity.

    The facility is Aramco’s only refinery to contain a Visbreaker processing unit, which has a 60,000 b/d capacity.

    The Visbreaker reduces the quantity of residual oil produced in the distillation of crude oil and increases the yield of more valuable middle distillates, heating oil and diesel.

    The refinery complex also produces 17,000 b/d of asphalt, more than any other refinery in Saudi Arabia.

    Ras Tanura receives crude feedstock from the Abqaiq, Safaniya and Manifa oil field developments.

    Crude is typically transferred to Ras Tanura through a pipeline and can also be supplied by ship.

    Most of Ras Tanura’s production is transferred to the Dhahran bulk plant for domestic use, while some products are exported from the nearby Ras Tanura shipping terminal.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/17508681/main4014.jpg
    Indrajit Sen
  • Siemens Energy to supply turbines for Oman IPP projects

    1 July 2026

    Germany’s Siemens Energy has announced it will supply power generation technology and long-term service agreements for the 2.6GW Misfah and Duqm independent power producer (IPP) projects in Oman.

    The scope includes the supply of six F-class gas turbines, six generators and 20-year long-term service agreements for the equipment.

    The combined-cycle gas-fired plants will add almost 20% to the sultanate’s electricity generation capacity. They are expected to provide electricity to more than two million people.

    Oman’s Nama Power & Water Procurement (Nama PWP) signed power-purchase agreements (PPAs) for the development and operation of the plants in January.

    The two combined-cycle gas turbine plants are being developed by a consortium comprising Korea Western Power (Kowepo), Qatar’s Nebras Power, the UAE’s Etihad Water & Electricity (EtihadWE) and Oman’s Bhawan Infrastructure Services.

    The Misfah IPP will be led by Nebras Power and located in Wilayat Bousher in Muscat Governorate, with a planned capacity of 1,600MW.

    The Duqm IPP will be led by Kowepo and located in Wilayat Duqm in Al-Wusta Governorate, with a capacity of 800MW.

    In May, MEED exclusively reported that a consortium of China-headquartered Shandong Electric Power Construction No. 3 Company (Sepco 3) and South Korea’s Doosan Enerbility had been appointed as the main contractor.

    The gas turbines will have hydrogen co-firing capability, providing flexibility to increase hydrogen use over time, Siemens said in a statement.

    The turbines will be manufactured at Siemens Energy’s facility in Berlin. The generators will be produced at the company’s plant in Muelheim, Germany.


    READ THE JULY 2026 MEED BUSINESS REVIEW – click here to view PDF

    Stress test for Gulf aviation; Mixed performance as country outlooks diverge in the Levant; GCC tourism sector pivots from crisis to recovery mode.

    Distributed to senior decision-makers in the region and around the world, the July 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/17506190/main.jpg
    Mark Dowdall
  • Qiddiya awards estimated $1bn racecourse deal

    1 July 2026

     

    Register for MEED’s 14-day trial access 

    Saudi gigaproject developer Qiddiya Investment Company (QIC) has awarded an estimated SR4.3bn ($1.1bn) contract for the construction of a racecourse at Qiddiya entertainment city, on the outskirts of Riyadh.

    The contract was awarded to Taj Dhabi, a local subsidiary of UAE-based Trojan Construction.

    The racecourse venue will cover 1.3 million square metres and accommodate 70,000 spectators.

    QIC issued the tender for the construction works in December last year, but formally announced the project only on 10 February. Contractors submitted their bids on 15 February, MEED previously reported.

    According to a statement published on QIC’s website: “The venue will include the region’s first straight-mile turf course, alongside a 2.2 kilometre (km) main turf track and a 2.4km inner dirt track.

    “A 21,000-seat grandstand will anchor the venue, with the ability to expand capacity to up to 70,000 guests through event overlays during major race days,” the statement added.

    A centrepiece of the venue will be a 110-metre central parade ring, located in the middle of the racecourse.

    The project also includes an equine hospital that will provide advanced veterinary services, including diagnostics, surgery, rehabilitation and emergency care for horses.

    The Qiddiya City horse racing venue is one of several major projects within the greater Qiddiya development. Other projects include an e-games arena, the Prince Mohammed Bin Salman Stadium, a motorsports track, a performing arts centre, the Dragon Ball and Six Flags theme parks, and Aquarabia.

    The project is a key part of Riyadh’s strategy to boost leisure tourism in the kingdom. According to GlobalData, leisure tourism in Saudi Arabia has experienced significant growth in recent years.

    GCC presses ahead with tourism projects


    READ THE JULY 2026 MEED BUSINESS REVIEW – click here to view PDF

    Stress test for Gulf aviation; Mixed performance as country outlooks diverge in the Levant; GCC tourism sector pivots from crisis to recovery mode.

    Distributed to senior decision-makers in the region and around the world, the July 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/17506035/main.jpg
    Yasir Iqbal
  • NCP seeks firms for Saudi Arabia university hospital PPP

    1 July 2026

    Saudi Arabia’s Umm Al-Qura University, in collaboration with the National Centre for Privatisation & PPP (NCP), has launched an expression of interest for the completion of the construction and operation of the Umm Al-Qura University Hospital in Mecca.

    Issued to contractors on 30 June, the notice has a submission deadline of 21 July.

    The scope includes completing the remaining construction works, as well as the subsequent operation of the hospital.

    Upon completion, the hospital will have a capacity of 391 beds.

    The project will be delivered as a public-private partnership (PPP) under a design, build, finance, operate and maintain model.

    The contract duration is 30 years.

    The project is the latest healthcare project to be procured on a PPP basis in the kingdom. In June, MEED reported that Saudi Arabia’s Ministry of Health and NCP had awarded a PPP contract for the operation and management of the Sabic Specialised Behavioural Healthcare Hospital in Riyadh.

    That contract was awarded to SEH Healthcare, a consortium comprising local firms Specialised Medical Company (SMC Healthcare) and Health Gates Complex, and Germany’s Dr Ebel Fachkliniken.

    In a filing with the Saudi Exchange (Tadawul), SMC Healthcare said the total estimated project value is about SR3.8bn ($1bn).

    In January, Saudi Arabia launched a national privatisation strategy aimed at mobilising $64bn in private sector capital by 2030.

    Building on the privatisation programme first introduced in 2018, the strategy focuses on unlocking state-owned assets for private investment and privatising selected government services.

    In a statement, NCP said the strategy comprises 147 opportunities drawn from a broader pipeline of more than 500 projects across 18 sectors.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/17506381/main.jpg
    Yasir Iqbal