Data centre activity soars in Saudi Arabia

23 February 2024

Saudi Arabia is experiencing a major uptick in the construction of data centre assets across the country.

Despite the preference for data centres to be inconspicuous due to security concerns, it is not uncommon to see certain construction sites or completed facilities marked clearly as such when one navigates the capital city, Riyadh.

Data sovereignty regulations as well as the widespread use of electronic commerce and social media particularly by young Saudis are driving the data centre construction boom, notes a Riyadh-based expert.

Government agencies, banks, and family-owned conglomerates, in addition to local and international data centre developers and operators, have either started constructing or are planning to start the construction of data centre facilities across Saudi Arabia. 

The value of known data centre projects pipeline in the kingdom falls under $1bn, according to regional projects tracking service MEED Projects. While this value corresponds to just one utility-scale renewable energy plant or a minor upgrade of an oil production facility in Saudi Arabia, future plans point to a major expansion of such facilities, which underpin the kingdom's digital hub and artificial intelligence (AI) strategies.

For instance, the government announced in 2021 a plan to build a network of large-scale data centres that will require investments of up to $18bn by 2030.  At the time, the kingdom's Communications & Information Technology Ministry (MCIT) tapped local firms Gulf Data Hub, Al-Moammar Information Systems and Saudi FAS Holding as its initial partners for the scheme. 

The following year, Saudi-headquartered Quantum Switch Tamasuk (QST)  unveiled plans to design and operate data centre projects with a cumulative total capacity of 300MW for the MCIT  by 2026. The project will comprise six locations across Riyadh, Dammam, Jeddah and Neom, with a reported budget of at least $2bn.

Foreign investments have started pouring in to accommodate the rising capacity demand as well as the kingdom's ambition to become a digital hub.

Dubai developer Damac Properties-owned Edgnex is constructing a data centre, which will have a minimum capacity of 20MW, at Industrial City 2. 

In October last year, South Korea’s second-largest telecoms company, KT, in collaboration with Hyundai Engineering & Construction (Hyundai E&C) and the local telecoms group STC, signed a memorandum of understanding (MoU) to construct internet data centres (IDC) and smart cities in the kingdom. 

Similarly, the UAE-based cloud and data service provider Khazna Data Centres also plans to build data centres in Saudi Arabia as it executes its overseas expansion plans. 

In May last year, sovereign vehicle, the Public Investment Fund (PIF), teamed up with US-based infrastructure investor and asset manager DigitalBridge to develop data centres and related digital infrastructure in Saudi Arabia and across the GCC states.

Telecoms service provider Zain is also expected to build a new data centre with some support from the kingdom's SR5tn ($1.35tn) Shareek private sector investment programme.

Crucially, US-headquartered IT and cloud services giants Microsoft and Oracle pledged at the annual Riyadh tech conference, Leap, last year, to invest a total of $9bn in the kingdom. This will go into the construction of multiple data centres to form a so-called cloud region catering to Saudi Arabia and the wider Middle East region.

Similarly, Chinese tech firm Huawei has pledged to invest $400m to build cloud services in the kingdom.

"The demand is there that's why we are focusing on these projects," said the Riyadh-based construction expert, who also acknowledges that the depreciation rate for data centres is higher compared to real estate assets due to the high obsolescence of technology and the need to replace data centre components frequently.

Digital hub

A growth in the number of subsea cable landing sites in the kingdom is occurring in parallel with the substantial growth in data centre facilities and capacity.

A 45,000-kilometre subsea cable network connecting Africa, Asia and Europe, 2Africa, reached two of its four landing sites in Saudi Arabia in May 2023. The landing sites are in Jeddah and Yanbu.  The cable is expected to reach the third landing site in Duba late last year and the fourth site in Al-Khobar in 2024.

Once completed, 2Africa will connect Saudi Arabia to 33 countries, bringing the kingdom closer to its goal of becoming a digital hub.

The stakes are high for the kingdom, which has simultaneously launched plans to industrialise its economy, decarbonise its industries, increase localisation and reach net-zero carbon emissions by 2060.

While constructing energy-intensive data centres – which globally account for 1% of energy-related greenhouse gas emissions –  may seem counter-intuitive to these objectives, the rapid advancements in cooling and other data centre components, as well as the potential deployment of clean energy to power them, are expected to ease these assets' environmental impact.

 

https://image.digitalinsightresearch.in/uploads/NewsArticle/11543521/main.jpg
Jennifer Aguinaldo
Related Articles
  • Three bids submitted for Riyadh-Qassim IWTP

    18 September 2025

     

    Register for MEED’s 14-day trial access 

    State water offtaker Saudi Water Partnership Company (SWPC) has received three bids from the private sector for the development of the Riyadh-Qassim independent water transmission pipeline (IWTP) project.

    The bids were submitted by two consortiums and one individual company.

    The first consortium comprises Saudi firms Al-Jomaih Energy & Water, Al-Khorayef Water & Power Technologies, AlBawani Capital and Buhur for Investment Company.

    The second consortium comprises Bahrain/Saudi Arabia-based Lamar Holding, the UAE's Etihad Water & Electricity and China’s Shaanxi Construction Installation Group.

    The third bid was submitted by Saudi Arabia's Vision Invest.

    In August, MEED exclusively reported that SWPC had extended the bid submission deadline again for a contract to develop and operate the project. 

    The deadline for bids was 17 September.

    The project will have a transmission capacity of 685,000 cubic metres a day. It will include a pipeline length of 859 kilometres (km) and a total storage capacity of 1.59 million cubic metres.

    The scheme is the third IWTP contract to be tendered by SWPC since 2022.   

    The first two are the 150km Rayis-Rabigh IWTP, which is under construction, and the 603km Jubail-Buraydah IWTP, the contract for which was awarded to a team of Riyadh-based companies comprising Al-Jomaih Energy & Water, Nesma Group and Buhur for Investment Company.

    Like the first two IWTPs, the Riyadh-Qassim IWTP project will be developed using a 35-year build-own-operate-transfer contracting model.

    Commercial operations are expected to commence in the first quarter of 2030.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14691078/main.jpg
    Mark Dowdall
  • Saudi Arabia seeks firms for six renewable projects

    17 September 2025

    Register for MEED’s 14-day trial access 

    Saudi Arabia's principal buyer, Saudi Power Procurement Company (SPPC), has invited interested companies to prequalify for the contracts to develop and operate solar photovoltaic (PV) and wind independent power producer (IPP) projects with a total combined capacity of 5,300MW.

    The following schemes comprise round seven of the kingdom's National Renewable Energy Programme (NREP):

    • 1,400MW Tabjal 2 solar PV IPP (Tabrijal, Al-Jouf Province)
    • 600MW Mawqqaq solar PV IPP (Mawqqaq, Hail Province)
    • 600MW Tathleeth solar PV IPP (Tathleeth, Aseer Province)
    • 500MW South Al-Ula solar PV IPP (Al-Ula, Medina Province)
    • 1,300MW Bilgah wind IPP (Bilgah, Medina Province)
    • 900MW Shagran wind IPP (Shagran, Medina Province)

    These projects are part of the NREP, which aims to achieve an optimal energy mix and supply 50% of the kingdom's electricity from renewable energy by 2030.

    Earlier rounds under the NREP have already put in place large capacities.

    Round six solicited around 4,500MW of solar and wind projects:

    • 1,500MW Dawadmi wind IPP  (Riyadh)
    • 1,400MW Najran solar PV IPP (Najran)
    • 600MW Samtah solar PV IPP (Jizan)
    • 600MW Al-Darb solar PV IPP (Jizan)
    • 400MW Al-Sufun solar PV IPP (Hail)

    In April, MEED reported that prequalified developers were forming teams to bid for the contracts to develop solar farms under the sixth round of the NREP.

    A separate set of bidders were prequalified for the 1,500MW Dawadmi wind farm, with contracts due to be awarded before the end of the year.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14684103/main3708.jpg
    Mark Dowdall
  • Qatar tenders Smaisma infrastructure contract

    17 September 2025

     

    Register for MEED’s 14-day trial access 

    Qatar’s Public Works Authority (Ashghal) has tendered a contract inviting construction firms to bid for the remaining works on roads and infrastructure in the small seaside town of Smaisma.

    The contract covers package two in the south area of Smaisma, located 52 kilometres (km) north of Hamad International airport.

    The scope of work includes the completion of the remaining works and remedial works on three zones. Each zone is further divided into three sub-zones.

    The scope also covers the remaining works on road C1017.

    The contract duration is two years from the start of construction works.

    The tender was floated on 15 September with a bid submission date of 28 October.

    The latest notice follows the tendering for the construction of roads and infrastructure in Wadi Al-Banat North (Zone 70).

    Market overview

    After 2019, there was a consistent year-on-year decline in contract awards in Qatar’s construction and transport sectors. The total value of awards in that year was $13.5bn, but by 2023 it had fallen to just over $1.2bn.

    In 2024, the value of project contract awards increased to $1.7bn, bucking the downward trend in the market in the preceding four years.

    Of last year’s figure, the construction sector accounted for contract awards of over $1.2bn, while transport contract awards were about $200m.

    There are strategic projects in the bidding phase in Qatar worth more than $5bn, and these are expected to provide renewed impetus to the construction and transportation market, presenting opportunities for contractors in the near term.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14682452/main.jpg
    Yasir Iqbal
  • Dragon Oil to boost exploration and production in Egypt

    17 September 2025

    Register for MEED’s 14-day trial access 

    Dubai-based Dragon Oil has signed a deal with the state-owned national oil company Egyptian General Petroleum Corporation (EGPC), agreeing to increase exploration and production activities in the Gulf of Suez.

    Under the terms of the agreement, Dragon Oil will make investments worth about $30m.

    This will fund activities including a programme to drill at least two new wells in the East El-Hamd area.

    Abdulkarim Ahmed Al-Mazmi, the acting chief executive of Dragon Oil, said: “The signing of this agreement reaffirms Dragon Oil’s commitment to strengthening its strategic presence in the Arab Republic of Egypt and supporting EGPC’s efforts to develop energy resources in the Gulf of Suez region, in line with the company’s vision for growth and sustainability.”

    Dragon Oil is wholly owned by Emirates National Oil Company, which is fully owned by the Government of Dubai.

    Al-Mamzi said that the new investments are part of Dragon Oil’s broader strategy to expand in regional markets and to strengthen its position in the oil and gas sector, in line with the directions of the government of the UAE, and in particular the Government of Dubai.

    The agreement was signed at the EGPC headquarters in Cairo.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14680456/main.png
    Wil Crisp
  • Construction launched for final major projects of Iraq’s GGIP

    17 September 2025

    Register for MEED’s 14-day trial access 

    Officials have announced the start of construction on Iraq’s Common Seawater Supply Project (CSSP) and the full field development of the Ratawi oil field, which is also known as the Artarwi field.

    The two projects are the two last major contracts of the Gas Growth Integrated Project (GGIP).

    The GGIP is led by France’s TotalEnergies, which is the operator and has a 45% stake in the project.

    Its partners are Iraq’s state-owned Basra Oil Company, which has a 30% stake, and QatarEnergy, which has a 25% stake.

    An event in Baghdad to mark the launch of the two projects was attended by senior officials including Patrick Pouyanne, the chairman and chief executive of TotalEnergies; and Saad Sherida Al-Kaabi, who is Qatar’s Minister of State for Energy Affairs, as well as the president and chief executive of QatarEnergy.

    In a statement, TotalEnergies said: “All four parts (natural gas, solar, oil, water) of the GGIP are now in the execution phase.”

    The CSSP will be built on Iraq's coast, near the town of Um Qasr. It will process and transport 5 million barrels a day (b/d) of seawater to the main oil fields in southern Iraq.

    Treated seawater will be substituted for the freshwater currently taken from the Tigris, Euphrates and aquifers to maintain pressure in the oil wells.

    The project is expected to help alleviate water stress in the region and free up to 250,000 cubic metres of freshwater a day for irrigation and local agriculture needs, according to TotalEnergies.

    The Ratawi redevelopment was launched in September 2023. Phase one aims to increase production to 120,000 b/d of oil and is expected to come on stream by early 2026.

    The launch of phase two, the full field development, will enable production to be increased to 210,000 b/d starting in 2028, with no routine flaring, according to TotalEnergies.

    In a statement, it said that all 160,000 cubic feet a day (cf/d) of associated gas produced will be fully processed by the 300,000 cf/d Gas Midstream Project (GMP), the construction of which began in early 2025.

    The GMP, which will also treat previously flared gas from two other fields in southern Iraq, will deliver processed gas into the national grid, where it will fuel power plants with a production capacity of approximately 1.5GW, providing electricity to 1.5 million Iraqi households.

    An early production facility to process 50,000 cf/d of associated gas will start in early 2026, together with the Ratawi phase one oil production.

    Pouyanne said: “We are delighted today to award the two final contracts of the GGIP, in particular the seawater treatment plant, which has been long awaited by the oil industry in Iraq.

    “In less than two years since the GGIP effective date in August 2023, TotalEnergies and its partners have fully executed their commitment towards the people of Iraq and launched all projects included in the multi-energy GGIP project, the best showcase of TotalEnergies' transition strategy.

    “All these projects will bring a significant contribution to the Iraq economy and employ during the construction phase 7,000 Iraqi nationals.

    “Furthermore, I am proud to confirm that the first phase of the associated gas, oil and solar projects will start up as soon as early 2026.”

    Turkiye’s Enka has signed a contract to develop a central processing facility at the Ratawi oil field as part of the second phase of the field’s development.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14680455/main.png
    Wil Crisp