Abu Dhabi to tap Kezad for hydrogen plan
10 October 2023
The Khailfa Economic Zones Abu Dhabi (Kezad) is expected to play a key role in the UAE capital's plan to establish a green hydrogen ecosystem.
The sprawling Khalifa Industrial complex, as well as the economic zone's proximity to the Khalifa Port, are expected to incentivise potential green hydrogen and green ammonia production plant developers and investors to locate at Kezad, sources familiar with the plans tell MEED.
The preliminary plan entails allocating space and land for electrolysis plants, powered by solar, wind or hydro power plants that are connected to the grid.
The hydrogen can then be converted into ammonia, stored in tank farms and exported through specialised vessels similar to liquified natural gas (LNG) carriers.
Kezad, or the Khalifa Industrial complex, is the location of several planned green hydrogen projects, including a $1bn scheme being planned by South Korea's Korea Electric Power Corporation (Kepco) and its plant subsidiary Korea Western Power and Samsung C&T, along with Dubai-headquartered Petrolyn Chemie.
The three companies signed a joint development agreement (JDA) with Abu Dhabi officials for the first phase of the planned scheme in June last year.
Hydrogen policy
Abu Dhabi Department of Energy (DoE) is expected to issue a public policy on low-carbon hydrogen around or during the upcoming Cop28 climate summit, MEED reported on 9 October.
The policy was initially expected to be issued earlier this year.
There are 11 known and planned green hydrogen projects in the UAE, with a budget of at least $12bn, according to MEED data.
In addition to the planned $5bn green hydrogen hub planned between Masdar and Engie, the other major planned green hydrogen projects in Abu Dhabi involve its largest industrial firms including Abu Dhabi National Energy Company (Taqa), Emirates Steel, Fertiglobe and Brooge.
One of these projects, the 150MW green hydrogen-based ammonia production facility planned in Ruwais, is in an advanced stage of planning and study.
A consortium led by French utility developer and investor Engie in partnership with Fertiglobe and Abu Dhabi Future Energy Company (Masdar) will develop the project. The team expects to take a final investment decision (FID) on the project by the fourth quarter of 2023.
Policy framework
MEED reported in March this year that the Abu Dhabi DoE developed the policy, which was approved by the Abu Dhabi Executive Council, and whose draft was issued for public consultation in October last year.
The policy aims to adopt a clear and robust framework to enable a low-carbon hydrogen economy, including defining Abu Dhabi’s low-carbon hydrogen industry structure and the supporting regulatory mechanism to “provide confidence for both domestic and international investors”.
The suggested industry structure and the institutional design consist of production, storage, transportation and trading.
The policy document states: “In the industry structure conceived for Abu Dhabi, production, trading and supply are open to market, while storage and transportation through pipelines are likely to be natural monopoly arrangement that in due course, will be regulated like other activities in the energy sector.”
MEED understands early-stage regulation will be considered to ensure access to clean energy and water, public safety, security and other key technical standards.
The policy also covers the entire low-carbon hydrogen ecosystem including enabling so-called hydrogen valleys, where different low-carbon hydrogen production technologies can be collocated to drive system-wide cost optimisation, including sharing of infrastructure and facilities.
It also considers clean electricity clusters that will supply power to electrolysers to produce low-carbon hydrogen. These clusters will be partially isolated with only a backup connection to the electricity grid. They are expected to allow large-scale clean electricity generation and supply at a competitive cost.
The policy supports the UAE hydrogen leadership roadmap to capture up to 25 per cent of the global low-carbon hydrogen market by 2030 as well as to be among the top 10 global suppliers by 2031.
It also supports the country’s 2050 net-zero carbon emissions strategy.
The final policy is expected to be issued separately from the Abu Dhabi hydrogen strategy, which was also due earlier this year.
Exclusive from Meed
-
Saudi firm signs $5.4bn oil and gas contract in Algeria
15 October 2025
-
Indian company wins gas project contract in Kuwait
15 October 2025
-
Firms submit interest for Saudi high-speed rail
15 October 2025
-
Qatar’s Ashghal awards $305m road contracts
15 October 2025
-
L&T announces UAE grid substation award
14 October 2025
All of this is only 1% of what MEED.com has to offer
Subscribe now and unlock all the 153,671 articles on MEED.com
- All the latest news, data, and market intelligence across MENA at your fingerprints
- First-hand updates and inside information on projects, clients and competitors that matter to you
- 20 years' archive of information, data, and news for you to access at your convenience
- Strategize to succeed and minimise risks with timely analysis of current and future market trends

Related Articles
-
Saudi firm signs $5.4bn oil and gas contract in Algeria
15 October 2025
Register for MEED’s 14-day trial access
Algeria's national oil and gas company Sonatrach and Saudi Arabia-based Midad Energy have signed a hydrocarbons exploration and production sharing agreement related to Algeria’s Illizi South block.
The agreement is valued at $5.4bn and has a duration of 30 years, with the option to be extended for an additional 10 years, according to a statement by Sonatrach.
This contract was signed by Sonatrach CEO Rachid Hachichi and the CEO of Midad Energy North Africa, Sheikh Abdelilah Ben Mohamed Ben Abdellah Al-Aiban, at Sonatrach’s headquarters in Algiers.
The investments for exploration and exploitation of the block, which is located about 100 kilometres south of In Amenas, will be financed entirely by Midad Energy and include $288m allocated for research investments.
The contract has a research period of seven years and was singed within the framework of Algeria’s Law 19-13 for hydrocarbons, which came into effect in December 2019.
ALSO READ: Algeria makes provisional award for downstream project
In a statement, Sonatrach said: “The work programme associated with this contract will be implemented in strict compliance with environmental protection requirements and in accordance with applicable Algerian regulations.
“This programme also includes the use of the latest technological and digital solutions,” it added.
Projected production from the Illizi South offshore development by the end of the contractual period is estimated at 993 million barrels of oil equivalent, including 125 billion cubic metres of marketable gas and 204 million barrels of liquid fuels.
The expected 204 million barrels of liquid fuels includes 103 million barrels of liquefied petroleum gas (LPG) and 101 million barrels of condensates.
The latest contract signed by Sonatrach and Midad Energy follows on from an agreement protocol concluded between the two companies on 3 March 2024.
https://image.digitalinsightresearch.in/uploads/NewsArticle/14866259/main1744.jpeg -
Indian company wins gas project contract in Kuwait
15 October 2025
Register for MEED’s 14-day trial access
State-owned upstream operator Kuwait Oil Company (KOC) has awarded a contract for its planned project to develop a gas sweetening and recovery facility in West Kuwait to Indian contractor Megha Engineering & Infrastructure (MEIL).
Hyderabad-based MEIL submitted the lowest bid for the tender, at KD69.2m ($225.5m), in February this year.
The full list of prices that were submitted was:
- L1 – MEIL (India): KD69.2m
- L2 – Al-Khorayef (Saudi Arabia): KD74.5m
- L3 – Mechanical Engineering & Contracting Company (Kuwait): KD94.8m
- L4 – China Oil HBP Science & Technology Corporation (China): KD97.9m
- L5 – Spetco (Kuwait): KD99.5m
- L6 – Jereh Oil & Gas Corporation (China): KD102.8m
The project uses the build-operate-transfer contract model and has been split into two parts. KOC has informed contractors that the two stages will be performed independently.
The project execution stage will cover:
- Licensing
- Design
- Engineering
- Health, safety and environment services
- Project management
- Supply
- Shipment
- Procurement
- Construction
- Testing
- Mechanical completion
- Pre-commissioning
- Commissioning
- Stabilisation
- Performance testing of the facility
The operation and maintenance stage will cover:
- Operation and maintenance of the facility
- Performance of all associated safety, quality control and environmental protection services
- All other inherent and related obligations
In November 2024, KOC's parent entity, Kuwait Petroleum Corpration (KPC), confirmed that it plans to spend $410bn on its long-term energy strategy.
Bader Ebrahim Al-Attar, KPC’s managing director of planning and finance, said the company plans to spend the money until 2050.
The strategy involves raising KPC’s overall oil production capacity to 4 million barrels a day by 2035.
https://image.digitalinsightresearch.in/uploads/NewsArticle/14866258/main0806.jpg -
Firms submit interest for Saudi high-speed rail
15 October 2025
Register for MEED’s 14-day trial access
Firms expressed interest on 12 October in the Qiddiya high-speed rail project, which will connect King Salman International airport and King Abdullah Financial District (KAFD) in Riyadh with Qiddiya City.
Saudi Arabia's Royal Commission for Riyadh City, in collaboration with Qiddiya Investment Company and the National Centre for Privatisation & PPP, issued the expression of interest notice to the market in September.
Also known as Q-Express, the railway line will travel at speeds of up to 250 kilometres an hour, reaching Qiddiya in 30 minutes.
The project was previously planned to be developed under a conventional model, but will now progress under a public-private partnership (PPP) model.
The line is expected to be developed in two phases. The first phase will connect Qiddiya with KAFD and King Khalid International airport.
The second phase will start from a development known as the North Pole – which is understood to include the Public Investment Fund’s proposed 2-kilometre-tall tower – and travel to the New Murabba development, King Salman Park, central Riyadh and Industrial City in the south of Riyadh.
In November 2023, MEED reported that French consultant Egis had been appointed as the technical adviser for the project.
UK-based consultancy Ernst & Young is acting as the transaction adviser on the project. Latham & Watkins is the legal adviser.
Qiddiya is one of Saudi Arabia’s five official gigaprojects and covers a total area of 376 square kilometres (sq km), with 223 sq km of developed land.
https://image.digitalinsightresearch.in/uploads/NewsArticle/14867663/main.png -
Qatar’s Ashghal awards $305m road contracts
15 October 2025
Register for MEED’s 14-day trial access
Qatar’s Public Works Authority (Ashghal) has awarded two contracts worth over QR1.1bn ($305m) for the construction of roads and infrastructure networks in the Izghawa and Al-Themaid areas in the northwest of Doha.
The contract for the first package, valued at over QR688m ($190m), was awarded to local firm Al-Mohannadi for Roads & Trading & Contracting.
The contract for the second package was awarded to another local firm, Attikat. The value of the contract is QR418.4m ($115m).
This project involves the construction of a single- and dual-carriageway road network in the area.
The scope includes the construction of carriageways, footpaths, parking areas, kerb lines, traffic signs and road markings, pedestrian guard rails, fencing, traffic signals, street lighting, landscaping and irrigation systems.
The scope also involves surface/groundwater drainage systems, foul water drainage systems, treated sewage effluent irrigation, potable water network systems, electricity networks, a telecommunications infrastructure network and other associated facilities.
The construction period is three years.
The proposed development includes a residential area comprising over 1,262 housing plots, 133 utility plots, 32 government plots, 28 open spaces, four commercial centres, nine mosques, two transportation and four education facilities.
In June 2022, Qatar’s Transport Ministry unveiled the Transportation Master Plan for Qatar 2050. The plan supports 286 projects, including 86 highway schemes, 22 for goods transport, 54 public transport schemes, 21 for pedestrians, 29 cycling schemes and 74 cross-modal and integration projects.
The future highway schemes entail 37 infrastructure packages totalling 770 kilometres (km), 22 truck schemes and 10 infrastructure and facilities schemes. The public transport programme comprises 30 schemes for upgrading the main 540km public transport network.
The masterplan also includes long-distance, metro and regional rail network plans.
https://image.digitalinsightresearch.in/uploads/NewsArticle/14867823/main.jpg -
L&T announces UAE grid substation award
14 October 2025
Indian industrial contracting conglomerate Larsen & Toubro (L&T) has announced several new grid infrastructure orders, including the engineering, procurement and construction of a 400kV substation in the UAE.
The facility, awarded to L&T's Power Transmission & Distribution business, forms part of the planned 400kV interconnection between Oman and the GCC grid.
The interconnection will enable a direct 400kV link between Ibri in Oman and Al-Sila in the UAE. It involves around 528 kilometres of overhead transmission lines, expansion of the existing Al-Sila substation and the development of two new 400kV substations, one in each country.
MEED understands the substation to be built by L&T is a planned 400kV intermediate substation near Madinat Zayed in the UAE.
L&T also said it has secured an order for the construction of a series of 132kV substations in the Middle East to cater to rising power demand. No other details were given and it is unclear where these substations will be located.
In Saudi Arabia, the company has received a contract for the construction of 380kV overhead transmission lines associated with the integration of renewable energy power plants.
It is understood that these contracts are for Saudi Electricity Company's Al-Khurma 1 and Al-Khurma 2 projects in Mecca, for which L&T submitted the lowest bids earlier this year.
ALSO READ: L&T announces QatarEnergy NGL train project award
https://image.digitalinsightresearch.in/uploads/NewsArticle/14863247/main4046.jpg