The commercial case for plastics recycling

23 June 2023

 

Establishing a circular plastics economy not only has the potential to mitigate the environmental pollution caused by plastics, but also presents a commercial opportunity for producers and consumers alike.

Devising an effective plastics recycling infrastructure could prevent over $120bn from being lost through plastic waste annually in the Gulf region, according to the Gulf Petrochemicals & Chemicals Association. 

GCC countries could reap significant socioeconomic benefits from developing a plastics recycling infrastructure. The sector is estimated to create about 1,500 direct jobs and have a $650m GDP impact for every million tonnes of plastic that is recycled. 

“By 2030, we project a global shortage of up to 25 million tonnes of recycled plastic,” say Devesh Katiyar, principal, and Jayanth Mantri, manager, at Strategy& Middle East, part of the PwC network. 

“This provides a unique opportunity for the Middle East and North Africa (Mena) region to create a circular plastics economy by developing a dual feedstock advantage.  

“The region should focus on energy-intensive advanced recycling technologies as they confer a substantial cost advantage given the access to cheap and abundant renewable energy,” they add.

Region prepares for circular plastics economy

Commercial prospects

Although the commercial opportunities that plastics recycling offers remain largely untapped in the Gulf, recent initiatives and collaborations suggest that governments and industrial players are increasingly being drawn to the commercial case that a circular plastics economy presents.

Rebound, a subsidiary of Abu Dhabi-based investment fund International Holding Company, facilitated the launch of the Rebound Plastic Exchange in September 2022. It serves as a global business-to-business marketplace to trade recycled plastics and aims to enable the recycling of 5 million tonnes of plastic though the platform by 2025. 

Rebound also signed an agreement with Japan’s Jeplan in late May to jointly study ways to develop the polyethylene terephthalate (PET) recycling ecosystem in the UAE. The two firms signed a letter of intent for a demonstration project to build a PET chemical recycling plant in the UAE as part of the country’s preparation for hosting the 28th UN climate change conference (Cop28) in November.

During the World Economic Forum annual meeting in Switzerland in January of this year, Saudi Basic Industries Corporation (Sabic) announced it was considering investing in a commercial advanced recycling facility with a capacity of about 200 kilotonnes a year. 

In its recently released 2022 Sustainability Report, Sabic highlighted “plans already in motion to significantly upscale volumes of its Trucircle circular materials globally”. 

Trucircle is a portfolio of Sabic’s products, services and technologies that aim to prevent land and marine pollution resulting from plastics use and support stakeholders in the plastics value chain in the adoption of sustainable practices. Sabic aims to process 1 million metric tonnes of Trucircle circular materials a year by 2030.

Petrochemicals projects

Big-ticket petrochemicals projects in the Gulf are set to enter operations during this decade. These include the Borouge 4
project in Abu Dhabi, the Ras Laffan ethane cracking facility in Qatar, the Amiral petrochemicals and derivatives complex
by Satorp in Saudi Arabia and the Duqm petrochemicals scheme in Oman.

As suppliers of feedstock for the manufacturing of plastics, such projects hold the key to the development of a thriving circular economy, says Hani Tohme, managing director of Middle East and head of sustainability in the Mena region at Roland Berger, a Munich-based international management consultancy. 

“The growth in production could allow these companies to realise economies of scale, reducing per-unit production costs and offering competitive pricing on the global stage. 

“Furthermore, with the establishment of these petrochemicals complexes, the region could attract downstream industries, fostering local industrial development and creating new employment opportunities. This could lead to the creation of a robust ecosystem that supports and benefits from the petrochemicals and plastics industry,” he adds. 

To fully capitalise on these benefits, however, producers need to integrate sustainability into their operations. 

“By demonstrating a commitment to sustainable practices, such as using recycled plastic as feedstock, implementing carbon capture technologies and enhancing energy efficiency, Mena producers can differentiate their offerings in the global market. This commitment can open up opportunities in sectors that demand greener products and potentially enable access to future markets in a world that is moving towards circular economies,” he says. 

“The spike in plastics production could bring economic benefits to the Mena region but aligning these activities with global sustainability trends is vital for long-term success.” 

https://image.digitalinsightresearch.in/uploads/NewsArticle/10963257/main.gif
Indrajit Sen
Related Articles
  • Iraq awards Baghdad airport PPP deal

    29 October 2025

    Register for MEED’s 14-day trial access 

    Iraq has awarded a contract to develop Baghdad International airport on a public-private partnership (PPP) basis to a consortium comprising Luxembourg-based Corporacion America Airports (CAAP) and local firm Amwaj International.

    According to local media reports, the estimated $764m contract covers the rehabilitation of airport infrastructure, construction of a new passenger terminal, and operations and maintenance under a 25-year concession.

    In a statement on its website, the Ministry of Transport said the airport’s initial capacity is expected to be around 9 million passengers, gradually increasing to 15 million.

    Iraq’s Ministry of Transport and General Company for Airports & Air Navigation Services received the bids earlier this month, MEED reported.

    The bidding consortium included:

    • Asyad Holding / Top International Engineering Corporation / Lamar Holding / YDA Insaat / Dublin Airport Authority (Saudi Arabia/Saudi Arabia/Saudi Arabia/Turkiye/Ireland) 
    • Corporacion America Airports / Amwaj International (Luxembourg/Iraq)
    • ERG International / Terminal Yapi / ERG Insaat (UK/Turkiye/Turkiye)

    The media report added that the winning consortium offered the government 43.05% of total airport revenues.

    The Asyad-led consortium offered 38.05%.

    The ERG International-led consortium was disqualified from the bidding process.

    The International Finance Corporation (IFC), a member of the World Bank Group, is the project’s lead transaction adviser.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14971278/main.jpg
    Yasir Iqbal
  • Saudi Electricity Company secures $3bn financing deal

    29 October 2025

    Saudi Electricity Company (SEC) has signed a $3bn financing agreement with a consortium of international banks at the Future Investment Initiative Forum (FII9) in Riyadh.

    The financing comes as SEC continues to expand its project portfolio to meet rising electricity demand. In September, SEC outlined plans to invest SR220bn ($58.7bn) in power projects between 2025 and 2030.

    This includes SR135bn ($36bn) and SR85bn ($22.7bn) for transmission and distribution, respectively, and is part of long-term plans to meet growing electricity demand while improving grid efficiency and reliability.

    The financing partners include the UAE's Abu Dhabi Commercial Bank, Abu Dhabi Islamic Bank, Dubai Islamic Bank and Emirates NBD.

    Also included are Bank of East Asia (Hong Kong), Bank of China, Barclays (UK), China Construction Bank, HSBC (UK), Industrial and Commercial Bank of China (China), ING (Netherlands) and Mega Bank (Taiwan)

    The state-controlled utility, majority-owned by the Public Investment Fund (PIF), has dominated procurement activity in the power sector in 2025, awarding approximately $6bn-worth of contracts.

    This has been led by two standalone projects in Dawadmi and Riyadh, each with a capacity of 500MW/2,000MWh and an estimated value of about $600m.

    The utility continues to advance other major developments including the PP13 and PP14 combined-cycle gas turbine (CCGT) power plants in Riyadh. In October, it signed $3.4bn in offtake deals for the plants, which have a total capacity of 3,356MW.

    It also recently reached financial close for Saudi Arabia’s Qurayyah CCGT independent power project (IPP) expansion.

    SEC will develop, finance, build, own and operate the 3,010MW plant as part of a consortium with Saudi Arabia's Acwa Power and Hajj Abdullah Alireza & Company (Haaco).

    Alongside its financing agreement, SEC launched a new Supply Chain Financing Programme during FII9 in partnership with local fintech Manafa and US-headquartered SAP Taulia, supported by the Saudi Industrial Development Fund.

    The initiative aims to improve liquidity across the energy supply chain and enable suppliers to access fast financing at more competitive rates.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14971266/main.jpg
    Mark Dowdall
  • Design work completed for $1bn Libyan pipeline

    29 October 2025

     

    Front-end engineering and design (feed) work has been completed for the major oil pipeline that will extend from oil fields in the south of Libya to the oil export terminal of Es Sider, according to industry sources.

    Libya’s Waha Oil Company, a subsidiary of state-owned National Oil Corporation (NOC), is developing the pipeline.

    The 700-kilometre pipeline will have a diameter of 32 inches and the capacity to transport 1 million barrels a day (b/d) of oil.

    One source said: “It is crucial that the existing pipeline is replaced. The existing pipeline is suffering frequent leaks and cannot handle higher pressures.

    “In 1960, when the pipeline was installed, the pipe thickness was 36mm, but it is now so worn out that this has been reduced to around 8mm across much of the pipeline. In some spots, it is even less than 8mm.

    “Production cannot be increased at the oil field due to this ageing facility.”

    Waha is preparing to eventually tender an engineering, procurement and construction (EPC) contract for the project, which is estimated to have a value of between $1bn and $1.25bn.

    Although the pipeline’s actual usage is unlikely to exceed 300,000 b/d for some time after its completion, it is being designed to be ready for a significant increase in oil production from Libya’s southern oil fields.

    It is unclear when Waha plans to issue an invitation to bid for the project’s EPC contract.

    In 2012, Waha announced a project to replace key oil pipelines in Libya, but funding issues delayed the timeline and invitations to bid were never issued.

    In January 2024, MEED reported that Waha was considering plans to boost its production by 1 million b/d.

    At the time, the subsidiary was producing about 300,000 b/d.

    Earlier this month, NOC announced that the country’s crude oil production had reached 1,383,430 barrels a day (b/d).

    The company said that natural gas production was 2,519 million cubic feet a day (cf/d), while condensate production was 49,013 b/d.

    NOC said it aimed to further increase production capacity to approximately 1.6 million cf/d by 2026.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14970171/main.jpg
    Wil Crisp
  • Qatari firm tenders Oman gabbro mining works

    29 October 2025

    Register for MEED’s 14-day trial access 

    Qatar Primary Materials Company (QPMC) has issued a tender for additional works at its gabbro mining development in the Khatmat Milaha area of Oman, close to a border crossing with the UAE.

    The broad scope of work involves the remaining works for two gabbro quarries and the construction of an export jetty at Khatmat Milaha, state-owned QPMC, also known as Al-Awalia, said in the tender notice.

    Firms have until 11 November to submit bids for the tender, QPMC said.

    QPMC owns a 3 million tonne‑a‑year (t/y) gabbro quarry at Khatmat Milaha in Oman, which is understood to have been commissioned in 2020. The quarry has an expandable capacity of 7 million t/y.

    The Omani quarry project had been planned for a number of years. In 2015, QPMC signed an agreement with Belgian firm Rent-A-Port to start work on the Khatmat Milaha quarry project.

    Rent-A-Port was the consultant for QPMC’s gabbro port in Qatar. A joint venture of Denmark’s FLSmidth and Sixco completed the estimated QR1.6bn ($430m) contract to build the aggregate berths in 2017. 

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14968152/main2817.jpg
    Indrajit Sen
  • Kuwait forms project company for Al-Zour North expansion

    29 October 2025

    Register for MEED’s 14-day trial access 

    Kuwait has formally established a new public shareholding company to manage the next stages of the Al-Zour North independent water and power plant (IWPP).

    The Gulf Alliance for Power & Water Company will be responsible for the construction, implementation, management, operation and maintenance of Al-Zour North IWPP phases two and three.

    The Al-Zour North phases two and three IWPP involves constructing a 2,700MW power plant and a 120-million-imperial-gallon-a-day desalination facility. The project’s total estimated value is approximately $4bn.

    In August, Saudi Arabia’s Acwa Power and Kuwait-based financial institution Gulf Investment Corporation (GIC) signed a contract to develop the project, which will be the country’s largest IWPP.

    The consortium of Acwa Power and GIC will hold 40% of the project company through Al-Zour Kuwaiti Second & Third Holding Company.

    The Public-Private Partnership Authority will hold 10% on behalf of government entities, while 50% will be offered to Kuwaiti citizens through a public subscription process.

    Al-Zour North IWPP phases two and three is owned by the Kuwait Authority for Partnership Projects (Kapp) and the Ministry of Electricity, Water & Renewable Energy.

    It will be developed under a build-operate-transfer model with a 25-year offtake agreement.

    Sepco3 is the EPC contractor for the project.

    The project company has been set up with an authorised and issued capital of KD197.032m ($639m).

    This capital is divided into 1.97 billion shares, each with a nominal value of 100 fils. The paid-up capital at the time of establishment is KD49.2m.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14963914/main.jpg
    Mark Dowdall