Adnoc selects Cobra-led team for PPP project

20 March 2023

Abu Dhabi National Oil Company (Adnoc) is understood to have selected a team led by Spain's Cobra Instalaciones for the contract to develop a seawater treatment plant and transmission pipeline in Mirfa as part of its Project Wave.

The selected consortium includes Egypt's Orascom and Metito.

Industry sources previously told MEED that the contract has an estimated value of $2bn-$2.5bn.

Adnoc received three bids for the contract to develop the project in September 2022. 

The other companies that submitted proposals for the contract were:

  • Vision International (Saudi Arabia) / Veolia (France)
  • Marubeni Corporation (Japan)

MEED reported in December that Adnoc was undertaking separate negotiations with teams led by Cobra and Saudi Arabia's Vision International.

Neither team submitted an updated bid for the contract at the end of last month.

It is understood that the client had requested bidders to arrange a 100 per cent debt commitment from banks before resubmitting their proposals.

The package involves the development of a nanofiltration plant with a capacity of 115 million imperial gallons a day (MIGD) in Mirfa.

The scheme includes the plant's seawater intake and outfall facilities, a pumping station and a 75-kilometre water transmission pipeline to the Bab and Bu Hasa oil fields.

Adnoc and Abu Dhabi National Energy Company (Taqa) will own 51 per cent of the special purpose vehicle that will implement the project, while the selected developer or developer consortium will own 49 per cent. 

The clients issued the requests for qualifications for the contract to develop two seawater treatment plants and associated facilities in March 2021.

Scope

Project Wave will replace the current aquifer water injection systems used to maintain reservoir pressure in all onshore oil fields in Abu Dhabi. It aims to utilise seawater as an additional source for enhanced oil recovery-based injection into Abu Dhabi's onshore fields.

It is understood that Project Wave's second package, in Al-Nouf, will be tendered separately. 

The two planned standalone greenfield seawater nanofiltration plants were to have a combined treatment capacity of about 210 MIGD. This is understood to have been expanded.

The two seawater treatment plants will be implemented on a build-own-operate-transfer (BOOT) basis.

Adnoc had indicated that it expects the plants to commence commercial operations in 2025. 

Adnoc will be the sole offtaker of the treated seawater at the battery limit of the Adnoc Onshore fields.

A team of UK-based Alderbrook Finance and Saudi Arabia-based SMBC are the financial advisers to the client for the BOOT projects. Austria-headquartered ILF Consulting Engineers is the technical adviser.

https://image.digitalinsightresearch.in/uploads/NewsArticle/10687985/main2508.gif
Jennifer Aguinaldo
Related Articles
  • Iranian drones hit Kuwait International airport’s Terminal 1

    3 June 2026

    Kuwait International airport was struck by a fresh wave of hostile drone attacks on 3 June. The drones caused significant structural damage to Terminal 1 and wounded several individuals.

    Brigadier General Saud Abdulaziz Al-Otaibi, official spokesman for the Ministry of Defence, blamed the strikes on “criminal Iranian aggression”. He confirmed that the injured had been evacuated for medical care and stated that the armed forces remain in a state of complete readiness to secure the state.

    The incident is the third major drone strike on the hub in recent months. On 1 April, a drone strike hit fuel tanks managed by Kuwait Aviation Fuelling Company, sparking massive fires. On March 28, another multi-drone raid severely damaged the airport’s primary radar systems.

    The airport is being expanded with the construction of a new terminal, and works on the project are expected to be completed by 2027. It consists of three packages.

    These are:

    • Package 1: Main works – $4,329m
    • Package 2: Multistorey car park building, connection roads, bridges and landscaping works – $550m
    • Package 3: Aircraft parking, runways and service buildings – $950m

    Turkiye’s Limak Holding is executing the main works.

    The terminal building was designed by Foster+Partners and Gulf Consult.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/17089683/main.gif
    Colin Foreman
  • Consortium signs PPA for Taweelah C power plant

    3 June 2026

    Emirates Water & Electricity Company (Ewec) has confirmed it has signed a power-purchase agreement (PPA) with a developer consortium for the Taweelah C independent power producer (IPP) project.

    The agreement, which will run through to 2050, was signed with Abu Dhabi National Energy Company (Taqa), Al-Jomaih Energy & Water Company (Saudi Arabia) and Sembcorp Industries (Singapore), the utility said in a statement.

    Taqa will own a 60% stake in the project, with the international consortium holding 40%. The ADX-listed company will also own 40% of the project’s operations and maintenance company, while the international consortium will own 60%.

    Last month, MEED exclusively revealed that the winning consortium had been selected for the project, with the PPA initially expected to be signed in mid-May.

    It is understood that China Energy Engineering Corporation (CEEC) will be the engineering, procurement and construction contractor.

    The combined-cycle gas turbine plant will have a capacity of about 2.5GW. It will be located at the Al-Taweelah power and desalination complex, about 50 kilometres northeast of Abu Dhabi city.

    Taweelah C is part of Ewec’s wider programme to support the UAE’s Net Zero by 2050 Strategic Initiative and the Abu Dhabi Department of Energy’s Clean Energy Strategic Target 2035.

    Ewec plans to raise solar power capacity to 18GW and wind capacity to 2.6GW by 2035, while reducing the carbon intensity of its power generation by more than half compared with 2019.

    The Taweelah C IPP is now expected to start commercial operations in 2029. The facility had previously been scheduled to begin commercial operations in the fourth quarter of 2028.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/17089163/main.jpg
    Mark Dowdall
  • Local contractor wins Oman water transmission contract

    3 June 2026

     

    Local contractor Al-Jesr United has won the main engineering, procurement and construction contract to reinforce Oman’s Sur water transmission system.

    The contract, awarded by state-owned utility Nama Water Services (NWS), forms part of a project to improve the reliability of potable water supply to Sur, a coastal city about 200 kilometres southeast of Muscat.

    The scheme, estimated to cost $80m, is designed to strengthen the network’s resilience during peak-demand periods and emergencies.

    The scope of work includes upgrading the pumps at the Sur DP Pump Station with variable frequency drive units and replacing ductile iron pipes and fittings within the facility. It also covers about 17km of new transmission pipelines.

    According to regional projects tracker MEED Projects, at least five local firms submitted commercial bids for the contract, which was tendered in August 2025.

    These include:

    • Al-Jesr United
    • Al-Rafaa Trading & Contracting
    • Gulf Petrochemical Services & Trading
    • Professionals Trading
    • Sarooj Construction Company

    In June 2024, NWS awarded a $1.3m contract for the project’s design and construction supervision to Muscat-headquartered Ibn Khaldun Almadaen Engineering Consultants.

    Sur is home to one of the sultanate’s key desalination plants, which supplies potable water to communities across eastern Oman. 

    The water transmission project will support network expansion in areas such as Al-Aigah and Ahiae, as the existing ductile iron pipeline serving Wilayat Sur is no longer sufficient to meet current and future demand.

    Construction is expected to start in the third quarter of 2026 and take about two years to complete.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/17088454/main.jpg
    Mark Dowdall
  • Syria to tender gas plant contract

    3 June 2026

     

    Syria is preparing to tender a project to rehabilitate the Conoco gas plant in Deir ez-Zor province in the east of the country within the next 10 weeks, according to a document published by the US-Syria Business Council.

    The gas plant was reclaimed by Syria’s military during an offensive in January this year.

    It is Syria’s largest gas plant, but is severely damaged and cannot be operated in its current condition.

    Before the country’s civil war, it processed 13 million cubic metres of gas a day.

    The US-based companies ConocoPhillips and Novaterra signed a memorandum of understanding with the state-owned Syria Petroleum Company (SPC) to restore the facility in November last year.

    Syria is currently in the midst of a push to ramp up oil and gas production and establish itself as a regional energy hub.

    Earlier this year, Yousef Qiblawy, chief executive of SPC, said that his organisation was aiming to double national oil production before 2027 and boost output to 800,000 barrels a day by the end of 2029, not including offshore production.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/17088320/main.jpg
    Wil Crisp
  • AD Ports enters South America with $835m Brazil deal

    3 June 2026

    Abu Dhabi-listed AD Ports Group has entered the South American market by agreeing to acquire a majority stake in Corredor Logística e Infraestrutura (CLI), Brazil’s leading independent agri-bulk port terminal operator, for an enterprise value of $835m.

    The transaction represents AD Ports’ largest acquisition to date, surpassing its $720m purchase of Spain’s Noatum in 2023, and its $510m purchase of a 51% stake in Dubai-based Global Feeder Shipping in early 2024.

    Under the terms of the agreement, AD Ports will acquire CLI from joint owners Macquarie Asset Management and IG4 Capital. CLI operates two major agri-bulk export terminals under long-term concessions: CLI Norte at the Port of Itaqui, which is 100% owned by CLI, and CLI Sul at the Port of Santos, which is 80% owned. In 2025, CLI handled 17 million tonnes of cargo, generating $178m in revenue and profits of $98m.

    The deal, expected to close in the second half of 2026, subject to regulatory approvals, aligns with AD Ports’ strategy to expand its agrifood vertical. The group has recently secured similar international assets, including a 30-year concession at Jordan’s Aqaba multipurpose port, a $30m investment in Kazakhstan’s Sarzha Grain Terminal, and a clean bulk facility development at Pakistan’s Karachi Port.

    The acquisition also reflects broader economic ties between the UAE and Brazil, where UAE investments total about $5bn. The UAE is currently negotiating a Comprehensive Economic Partnership Agreement (CEPA) with the Mercosur trading bloc, which includes Brazil.

    The major capital deployment follows a period of significant financial growth and international expansion for the Abu Dhabi operator, which is 75.42% owned by sovereign wealth fund ADQ. AD Ports reported record results for 2025, with revenue rising 20% year-on-year to AED20.77bn ($5.66bn) and net profit increasing 16% to AED2.07bn.

    According to its 2025 annual report, the group plans to invest AED2.45bn in port infrastructure development during 2026 alone, alongside AED1.3bn for liquefied petroleum gas and liquefied natural gas storage terminals between 2026 and 2028. To fund higher-return projects and optimise its balance sheet, AD Ports launched an asset monetisation programme in late 2025 targeting the recycling of AED4.6bn of capital.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/17087945/main.jpg
    Colin Foreman