Egypt’s construction sector faces delays

22 February 2023

This package on Egypt’s construction and transport sectors also includes:

Egypt’s El-Attal launches $229m development

Qatari Diar selects New Cairo project contractor

Japan inks a new Cairo metro loan

NMDC to execute $272m Egypt dredging works

Bidders prepare Egypt dry port proposals

Egypt qualifies firms for schools PPP


 

After seven years of continuous growth, Egypt’s construction sector is showing signs of wobbling amid the country’s economic troubles.

The value of construction and transport contract awards in Egypt has grown every year since 2015 and rose to record highs in the past two years, according to regional projects tracker MEED Projects. It grew by 44 per cent to $19.3bn in 2021 – from $13.4bn in 2020 – before rising again by 31 per cent to $25.4bn in 2022.

In January, however, the value of construction and transport contract awards fell to less than $200m. This was the lowest monthly total since July 2016, and well below the $2.6bn of contract awards in January 2022.

Although the general outlook for the construction sector is strong, economic volatility presents downside risks, at least in the short term.

“Things are at a standstill for the moment,” says Salwa Elbakry, business development director for Egis in Egypt. 

“Several tenders were set to be issued in early January and February, but due to the current economic situation, including devaluation, there were some delays.”

This slowdown started in June, when the currency crises deepened. Companies remain optimistic, however, as “Egypt has proven to be a versatile economy”, says Elbakry.  “There are a lot of positive outlooks for 2023. By the end of the first quarter or the beginning of the second quarter, things will get better.”

As Egypt’s major projects are backed by sovereign funds, international investors and institutions, it is “business as usual”, she adds.

Cairo’s positioning as a destination for international investment has grown in recent years. In 2021, Egypt’s International Cooperation Ministry secured $10.2bn in development financing, of which $8.7bn was dedicated to public sector projects and $1.5bn to private sector development.

GCC investors continue to believe in the Egyptian market as well. “The ties between the GCC and Egypt go way back,” says Elbakry.

Focus on key projects

While the IMF suggested in January that Egypt should curb its project spending, the government has said its major projects are vital for the country’s development and a vehicle for GDP growth.

Recently, Egyptian president Abdul Fattah al-Sisi pledged that national projects would continue. Ongoing infrastructure schemes include a high-speed railway network; roads and bridges; hospitals; and several new cities, including the $20bn new capital, to the east of Cairo.

“Egypt continues to be driving ahead with a lot of big projects,” says Raouf Ghali, CEO of Hill International. “It is the first time I have seen Egypt working on projects and programmes that rival the GCC, and this is very unusual.”

Other sectors that are expected to initiate new developments are tourism, healthcare and education, as well as logistics.

“This year will witness several public-private partnership schemes related to tourism, ports and industrial zones,” says Elbakry. “There is also a lot of buzz around the hospitality sector.”

Rail versus real estate

Railway projects make up $10.5bn, or 90 per cent, of the $11.7bn-worth of construction and transport projects in the bidding phase in Egypt.

The two largest upcoming projects are for work on the Cairo Metro: a $5bn Line 6 package and an $800m package for phase one of Line 4. Both schemes are in the bid evaluation phase.

Schemes on the Alexandria Metro are the next biggest pending awards. The National Authority for Tunnels is receiving bids for two $750m packages for the line between Abu Qir and Misr Station.

With the ongoing currency and inflation crisis, Egypt is trying to use more local resources and further reduce its imports of construction materials. The demand for foreign expertise remains strong in sectors such as rail, however.

“While the Egyptian market is rich in engineering and architectural skills, some projects like aviation, rail, ports, smart cities or water require international know-how,” says Elbakry.

The World Bank Group approved a further $400m in financing in 2022 to support railway network development in Alexandria and Cairo.

Real estate has been another booming sector in recent years, driven largely by domestic demand. Yet the outlook might be shifting now, with projects in the sector appearing to be scaling down and foreign funding showing signs of drying up.

“Egyptians rely on real estate as an investment,” says Elbakry, adding that the market is currently at a standstill because “the only people able to invest in real estate at the moment are high-income individuals”.

For the moment, “everybody is watching what the Central Bank is going to do with the currency and the exchange rate”, says Ghali.

“For construction companies, it is great to get these big contracts, but devaluations after signing contracts do not help profitability. 

“It also creates a lot of insecurity because you have a lot of cash in the country that you cannot export, which makes it a very challenging environment,” he adds. 

“Overall, we are bullish, but also very cautious because of the currency situation.”


MEED's March 2023 special report on Egypt also includes:

> GOVERNMENT & ECONOMYEgypt faces up to economic reality

> POWERCrisis dampens Egypt’s energy diversification

> WATEREgypt turns to private sector for water

> BANKING: Interesting times for Egypt’s lenders

 

https://image.digitalinsightresearch.in/uploads/NewsArticle/10585786/main.gif
Eva Levesque
Related Articles
  • Iraq to start procurement for $1bn rail modernisation

    2 July 2025

     

    Iraq’s Ministry of Transport and its General Company for Railways division will soon start procurement for a $1bn-plus modernisation programme of its north-south main rail line.

    Known as the Iraq Railways Extension & Modernisation (IREM) project, the scheme comprises the rehabilitation, upgrade and modernisation of 1,047 kilometres (km) of existing single-line track linking Umm Qasr Port in the south with Mosul in the north, running through Basra and Baghdad.

    There will be two main construction packages. The first contract, expected to be tendered in October, covers:

    • Renewal of 32km of track between Al-Yussifia and Baghdad, totalling 32km, with an estimated cost of $33m
    • Renewal of 20km of track between Baghdad and Taji, totalling 20km, with an estimated cost of $21m
    • Renewal of the line between Baiji and Mosul, totalling 189km, with an estimated cost of $197m

    The second deal involves the largest element of the programme: an estimated $570m deal to install European Train Control System (ETCS) signalling and ducts for optical fibre along the entirety of the line, including a safety level-crossing protection system for all official crossings along the alignment, and the modernisation of selected train stations.

    The package will also include the:

    • Spot rehabilitation of the 72km-long Umm Qasr-Basr line, with an estimated cost of $4m
    • Spot rehabilitation of the 520km-long section between Basra and Baghdad, with an estimated cost of $32m

    Requests for proposals for this second deal are due to be issued in January 2026.

    Before then, the client is expected to tender an estimated $15m contract for the capex management role on the scheme this month.

    Iraq’s rail sector consists of a 2,272km standard gauge network with 115 stations, most of which are in poor condition and provide only limited transport options.

    The system features two main routes: the north-south line and an east-west line running from Baghdad to near the Syrian border.

    There are also several short branch lines. Service is limited, with a few freight trains carrying oil and grain, as well as passenger services, including an overnight Baghdad–Basra train and a weekly train to Samarra.

    The southern section of the north-south line was partly restored in 2014, allowing trains to run up to 80km an hour (km/h) with a 25-tonne axle load.

    The northern segment, from Baghdad to Rabiaa and linking to Syria, operates at 40-60 km/h with an axle load limit of 18-20 tonnes. This section sees limited and irregular freight movement and contains a major workshop at Baiji that will be refurbished under the programme at an estimated cost of $10m.

    The modernised railway line is expected to carry 6.3 million tonnes of domestic freight, 1.1 million tonnes of exports and imports, and 2.85 million passengers by 2037.

    The IREM project is a central component of Iraq’s Development Road (IDR) Initiative, which aims to position Iraq as a regional transportation hub linking the GCC states with Turkey and then Europe. In the long run, the network is hoped to connect with the planned GCC railway in Kuwait.

    The launch of the project follows confirmation from the World Bank of a loan agreement worth $930m to fund almost all of the project. 

    Prior to the extension of the loan, Italy’s BTP Infrastrutture carried out the initial feasibility study and preliminary design work.

    The firm is also conducting a similar contract covering a new multibillion-dollar 1,700km high-speed railway between Al-Faw on the Gulf coast and Fishkabour on the Syrian border, along with a major highway along the same alignment.

    It has also been engaged on the design of the Al-Faw Grand Port project. 

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14187478/main.gif
    Edward James
  • Hong Kong firm reveals $3bn Riyadh tech district design

    2 July 2025

    Register for MEED’s 14-day trial access 

    Hong Kong-headquartered architectural firm LWK & Partners has released details about the estimated SR12bn ($3.2bn) Pulse Wadi project, an upcoming technology and cybersecurity district located on the outskirts of Riyadh.

    The project will span an area of over 600,000 square metres (sq m) with a gross floor area of about 1.14 million sq m.

    In an official statement, the firm said that the project will be anchored by a government complex, two iconic headquarters, several cultural institutions and a dynamic cyber-research district.

    At the centre of the district lies the central wadi plaza, which will be an events space.

    LWK & Partners is the project’s lead design consultant, master planner, urban designer, design architect and landscape architect.

    According to UK data analytics firm GlobalData, the construction industry in Saudi Arabia is expected to grow by 4.4% in real terms in 2025, supported by investments in the housing, energy, industrial and transport infrastructure sectors, coupled with investments in preparation for football’s Fifa World Cup 2034.

    In November last year, the government approved the kingdom’s 2025 budget, which includes a total expenditure of SR1.3tn ($342.7bn) for this year.

    The commercial construction sector is expected to grow by 3.7% in real terms in 2025, before registering an annual average growth rate of 3.7% in 2026-29, supported by investments in leisure and hospitality, retail, data centres and sports infrastructure projects. 

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14187435/main.jpg
    Yasir Iqbal
  • Indian contractor wins Ruwais LNG jetty construction

    2 July 2025

    Register for MEED’s 14-day trial access 

    India-based ITD Cementation India has announced winning a contract worth $67.7m for jetty construction work on Abu Dhabi National Oil Company’s (Adnoc) upcoming liquefied natural gas (LNG) processing terminal at Ruwais in Abu Dhabi.

    The job is understood to have been awarded by a consortium of France’s Technip Energies, Japan-based JGC Corporation and Abu Dhabi-owned NMDC Energy, the main contractors performing engineering, procurement and construction (EPC) works on the $5.5bn project.

    Prior to awarding this sub-contract to ITD Cementation India, the consortium of Technip Energies, JGC Corporation and NMDC Energy awarded Abu Dhabi-based Dutch Foundations a contract to perform piling works on the Ruwais LNG project.

    Also, in January, US-based midstream energy and storage services provider Chicago Bridge & Iron (CB&I) won an order from the main EPC consortium to supply two cryogenic tanks for the Ruwais LNG project. CB&I described the contract as “substantial”, a term it uses to denote values between $250m and $500m.

    Ruwais LNG terminal project

    The upcoming LNG export terminal in Ruwais will have the capacity to produce about 9.6 million tonnes a year (t/y) of LNG from two processing trains, each with a capacity of 4.8 million t/y. When the project is commissioned, Adnoc’s LNG production capacity will more than double to about 15 million t/y.

    Adnoc awarded the full EPC contract to the consortium of Technip Energies, JGC Corporation and NMDC Energy, and achieved the final investment decision for the Ruwais LNG terminal complex in June last year.

    The complex will also feature process units, storage tanks and an export jetty for loading cargoes and LNG bunkering, as well as utilities, flare handling systems and associated buildings.

    The planned LNG facility will run on electric-powered rotary equipment and compressors instead of gas-fired units. Adnoc awarded a $400m contract in October 2023 to US-based Baker Hughes for the supply of all-electric compression systems for the project. The LNG trains will run on energy-efficient Baker Hughes technology, including compressors driven by 75MW electric motors.

    Separately, Adnoc has also signed agreements with international energy companies to divest a total stake of 40% in the Ruwais LNG project.

    UK energy producer BP, Japan's Mitsui & Co, London-headquartered Shell and French energy producer TotalEnergies will each hold 10% stakes in the Ruwais LNG terminal project, with Adnoc retaining the majority 60% stake in the facility.

    Adnoc Group subsidiary Adnoc Gas will acquire its parent company’s 60% stake in the Ruwais LNG facility at cost in the second half of 2028, when first production from the complex is due.

    ALSO READ: Adnoc to supply LNG to Mitsui from Ruwais project

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14186135/main.jpg
    Indrajit Sen
  • Firm wins $27m Dubai Ras Al-Khor wildlife sanctuary work

    2 July 2025

     

    Austrian firm Waagner Biro, part of French engineering group Egis, has won a AED100m ($27m) contract for the first phase of the Ras Al-Khor wildlife sanctuary development project in Dubai.

    Dubai Municipality awarded the contract.

    The project’s first phase covers an area of over 6.4 square kilometres (sq km) and is expected to be completed by 2026.

    The scope involves rehabilitating mangrove habitats and increasing mangrove coverage from 40 hectares to 65 hectares. This includes adding new irrigation channels, rehabilitating mangrove forests, creating new habitats such as the mangrove lake, north edge lake and reed ponds, and adding a green spine.

    According to an official statement, the first phase also involves increasing the water bodies by 144%, expanding their total area to 74 hectares. Additionally, 10 hectares of mudflats will be added.

    Ras Al-Khor Wildlife Sanctuary was established in 1985 and is on the list of wetlands of international importance under the Ramsar Convention 2007, making it the first Ramsar site in the UAE. Birdlife International has also declared it an important bird area.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14185288/main.jpeg
    Yasir Iqbal
  • Kuwait extends deadline for Jurassic oil project

    2 July 2025

    State-owned upstream operator Kuwait Oil Company (KOC) has extended the bid deadline for its planned project to develop Jurassic Light Oil (JLO) export facilities and upgrade the existing export network.

    The main contract bid submission date for the project, which is understood to have a budget of KD175m ($569m), has been changed to 15 July 2025.

    The previous bid deadline was 24 June 2025.

    The project was originally tendered in November last year with a bid deadline of 1 December 2024.

    Other recent deadlines have included 27 May, 27 April and 6 April.

    In an announcement in April this year, the list of prequalified bidders was made up of 15 companies:

    • CTCI (Taiwan)
    • Daewoo (South Korea)
    • Fluor (US)
    • Hyundai Engineering & Construction (South Korea)
    • Hyundai Engineering Company (South Korea)
    • Hyundai Heavy Industries (South Korea)
    • JGC Corporation (Japan)
    • Larsen & Toubro (India)
    • NMDC Energy (UAE)
    • Petrofac (UK)
    • Saipem (Italy)
    • Samsung Engineering Company (South Korea)
    • Sinopec Engineering Corporation (China)
    • Sinopec Luoyang Engineering Company (China)
    • Tecnicas Reunidas (Spain)

    In September 2024, KOC made a second announcement about the project, stating that just 13 companies were prequalified.

    Both Hyundai Heavy Industries and NMDC Energy had been removed from the list.

    At the time, KOC said that companies not included on the list could file a complaint against their non-inclusion before the official invitation to bid on the project.

    It is unclear whether more prequalified companies have been added or removed from the list since September.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14179469/main1321.jpg
    Wil Crisp