Kuwait tenders LNG project

1 October 2026

 

State-owned Kuwait Integrated Petroleum Industries Company (Kipic) has tendered a project to develop a reliquefaction unit at the Al-Zour liquefied natural gas (LNG) import terminal.

The project focuses on developing a boil-off gas (BOG) unit at the terminal, with bids due on 22 December.

A meeting for contractors to discuss the project is scheduled for 18 October.

The project scope includes engineering, procurement and construction works, along with pre-commissioning, commissioning and performance testing services.

The list of prequalified companies is:

  • Fluor (US)
  • GS Engineering & Construction (South Korea)
  • Tecnicas Reunidas (Spain)
  • Larsen & Toubro (India)
  • Hyundai Engineering (South Korea)
  • CTCI Corporation (Taiwan)
  • Daewoo Engineering & Construction (South Korea)
  • Hyundai Engineering & Construction (South Korea)
  • Saipem (Italy)
  • Samsung Engineering (South Korea)
  • Sinopec Engineering (China)
  • JGC Holdings (Japan)
  • KBR (US)
  • China National Petroleum Corporation (China)
  • Technip (France)

A BOG unit at an LNG facility captures, compresses and processes natural gas vapours that evaporate from cryogenic storage tanks, enabling the gas to be recycled back into the system rather than flared.

In April, MEED revealed that contractors expected the project to be worth about $200m.

https://image.digitalinsightresearch.in/uploads/NewsArticle/20168625/main2005.jpg
Wil Crisp
Related Articles