Adnoc allows extra time for Umm Shaif gas cap project prices
28 January 2026

The offshore oil and gas business of Abu Dhabi National Oil Company (Adnoc Offshore) has allowed contractors extra time to prepare commercial bids for a project to increase gas and condensate production from the Umm Shaif hydrocarbons field.
The primary objective of Adnoc Offshore’s Umm Shaif gas cap and surface pressure boosting project is to increase gas production by 550 million cubic feet a day (cf/d) and raise associated condensate output by 50,000 barrels a day (b/d).
Adnoc Offshore intends to feed about 520 million cf/d of the additional produced gas volumes into the sales gas grid of its parent company, Adnoc Group.
Contractors now have until 2 February to submit commercial bids for the project, according to sources. The previous deadlines for the submission of prices were 26 January and 5 January.
Adnoc Offshore has divided the engineering, procurement and construction (EPC) scope of the project’s first phase into three packages. The broad scopes of the two offshore packages and one onshore package are as follows:
- Offshore package 1 – fabrication of a 30,000-tonne gas compression system
- Offshore package 2 – fabrication of a 30,000-tonne gas compression system
- Onshore package – EPC of gas inlet and processing systems on Das Island
Contractors submitted technical bids for the three EPC packages of the Umm Shaif gas cap and surface pressure boosting project by the deadline of 30 October.
The previous technical bid submission deadlines were 31 July, 1 September and 10 October, MEED previously reported.
The following contractors are among those that are understood to be bidding for the three EPC packages of the project:
Offshore package 1:
- Saipem (Italy) / Seatrium (Singapore)
- Larsen & Toubro Energy Hydrocarbon (India) / Lamprell (Saudi Arabia/UAE)
- NMDC Energy (UAE) / Hyundai Heavy Industries (South Korea)
Offshore package 2:
- China Offshore Oil Engineering Company (COOEC)
- McDermott (US)
- Larsen & Toubro Energy Hydrocarbon (India) / Lamprell (Saudi Arabia/UAE)
- NMDC Energy (UAE) / Hyundai Heavy Industries (South Korea)
Onshore package:
- Archirodon (Greece)
- China Petroleum Engineering & Construction Company (CPECC)
- Engineering for the Petroleum & Process Industries (Enppi; Egypt)
- Galfar Emirates (UAE branch of Oman’s Galfar Engineering & Construction)
- Target Engineering Construction Company (UAE)
Adnoc Offshore is understood to have issued the main EPC tender for the Umm Shaif gas cap and surface pressure boosting project in the first quarter of 2025.
Australian firm Worley has performed front-end engineering and design (feed) work on the project.
Umm Shaif gas production
Adnoc Offshore operates the Umm Shaif hydrocarbons development, which is located 150 kilometres (km) northwest of the city of Abu Dhabi. The field is located in Abu Dhabi’s offshore Umm Shaif and Nasr hydrocarbons concession, previously operated by former Adnoc Group companies Adma-Opco and Zadco.
Between March and April 2018, Adnoc awarded a 10% stake in the Umm Shaif and Nasr offshore block to Italy’s Eni, 20% to France’s TotalEnergies and 10% to China National Petroleum Corporation. Adnoc Group retained the majority 60% interest. The operators produce a total of about 460,000 b/d of oil from the Umm Shaif and Nasr block.
Gas is produced from the Umm Shaif Khuff and Uweinat reservoirs, as well as from the Arab C and Arab D Early Production Scheme 2. The Umm Shaif Khuff reservoir is a formation that consists of dry gas volumetric reservoirs located in the Umm Shaif field.
Khuff reservoirs have been in production in Abu Dhabi since August 1989. Umm Shaif Khuff gas is currently produced from 28 active wells within the Umm Shaif field. A majority of these wells supply gas to Adnoc Group subsidiaries Adnoc LNG and Adnoc Gas Processing, with the rest supporting oil reservoirs at the Umm Shaif field through gas injection.
The Umm Shaif Super Complex (USSC) processes and transports oil, condensates and natural gas in separate pipelines to Das Island for further processing and export. The condensates collected from the USSC are transported to Das Island through an 18-inch pipeline stretching 34.4km, or are spiked into the 36-inch Adnoc main oil line.
The gas collected from the USSC is transported to Das Island through two 46-inch pipelines, which also run 34.4km.
Pressure at the Umm Shaif Khuff gas reservoirs will start to decline by the end of 2028. The flowing wellhead pressures at some of the Khuff gas wellhead towers are likely to reduce, so boosting well deliverability and increasing the flowrates is necessary.
Therefore, new Khuff surface pressure boosting facilities are required to maintain the plateau – with a goal of achieving a 90% gas recovery factor – and increase production beyond the end of the plateau by lowering pressure at the Khuff reservoirs.
Project tendering exercise
Adnoc Offshore has been making attempts to advance the Umm Shaif gas cap project since at least 2019, and has experimented with several project execution models.
According to the original schedule, the project was due to be commissioned in 2023, but progress slowed down, primarily due to the Covid-19 pandemic.
Adnoc Offshore launched a feed-to-engineering, procurement, construction and installation (EPCI) competition for the project in May 2019 and selected the following three entities based on their feed submissions:
- McDermott (US)
- National Petroleum Construction Company (UAE) / TechnipFMC (France)
- Saipem (Italy) / Petrofac (UK)
Technical bids for the EPCI works on the estimated $1.5bn project were submitted in January 2020 and commercial bids were submitted by August of that year.
The Saipem/Petrofac consortium emerged as the lowest bidder for the project in September 2020, MEED reported.
Petrofac is understood to have eventually pulled out of the consortium and was replaced by state-owned China Petroleum Engineering & Construction Company (CPECC).
In 2022, the Saipem/CPECC consortium is understood to have been the lone bidder remaining on the Umm Shaif gas cap project. Adnoc Offshore engaged the consortium for a revised feed exercise, and went on to receive commercial offers on a single-source basis.
In 2023, Adnoc Offshore cancelled the tendering process for the project and later decided to proceed with a conventional EPC-based project execution model.
Last year, the operator appointed Worley to undertake feed works on the renewed Umm Shaif gas cap project. Worley has a legacy of involvement in the Umm Shaif hydrocarbons development.
READ THE JANUARY 2026 MEED BUSINESS REVIEW – click here to view PDF
Saudi Arabia courts real estate investment; EVs and battery production are key regional tech themes; Muscat holds a steady growth course despite headwinds
Distributed to senior decision-makers in the region and around the world, the January 2026 edition of MEED Business Review includes:
|
> AGENDA: Saudi real estate to surge in 2026
> BATTERIES: Batteries shape the region's energy future
> INTERVIEW: Tabreed finishes the year on a high
> CONTRACTORS: Managing risk in the GCC construction market
> ECONOMIC ACTIVITY INDEX: UAE and Qatar emerge as markets to watch
> AIRSHOW: Top deals signed at Dubai Airshow 2025
> MARKET FOCUS: Oman steadies growth with strategic restraint
|
Exclusive from Meed
-
Safety and security matters3 April 2026
-
Saudi forecast remains one of growth3 April 2026
-
-
-
Oman’s Nama PWP tenders consultancy contract3 April 2026
All of this is only 1% of what MEED.com has to offer
Subscribe now and unlock all the 153,671 articles on MEED.com
- All the latest news, data, and market intelligence across MENA at your fingerprints
- First-hand updates and inside information on projects, clients and competitors that matter to you
- 20 years' archive of information, data, and news for you to access at your convenience
- Strategize to succeed and minimise risks with timely analysis of current and future market trends
Related Articles
-
Safety and security matters3 April 2026
Commentary
Colin Foreman
EditorRead the April issue of MEED Business Review
Employment and investment opportunities in a low or no-tax environment have been key attractions for people and businesses located in the GCC for decades. Another crucial factor has been safety and security.
That reputation has been tested by the missile and drone attacks that began on 28 February. Whether the GCC’s safe haven status has been damaged depends on perspective.
For some, the fact that attacks occurred fundamentally changes how the region is viewed. For others, the ability to absorb a serious shock, respond quickly, and keep daily life and businesses functioning demonstrates resilience.Any assessment of safety is also relative. Many people and businesses that relocate in the GCC do so not only for opportunity, but because of dissatisfaction elsewhere. Common reasons include limited economic prospects, high taxation, distrust in political leadership and concerns about personal safety. Even with the recent conflict, the GCC may still compare favourably for those considering these factors.
There is no doubt that missile and drone attacks are extremely dangerous, and the fear of further incidents can linger. Even if attacks are infrequent, the uncertainty matters. It can influence personal decisions, travel advice, and the cost of insurance and risk management. These perceptions will shape the region’s attractiveness.
Safety concerns vary. In many parts of the world, higher levels of crime are an everyday worry for residents and businesses. For some, the GCC may still feel like the better option, provided the current tensions do not become the new normal.
How this question is answered will play an important role in how the region’s economies perform in the period ahead. If confidence returns quickly and the risk is seen as contained and manageable, investment and hiring will likely rebound faster than many expect. If uncertainty persists or escalates, the road to recovery will be a long one.
READ THE APRIL 2026 MEED BUSINESS REVIEW – click here to view PDFEconomic shock threatens long-term outlook; Riyadh adjusts to fiscal and geopolitical risk; GCC contractor ranking reflects gigaprojects slowdown.
Distributed to senior decision-makers in the region and around the world, the April 2026 edition of MEED Business Review includes:
> AGENDA: Gulf economies under fire> GCC CONTRACTOR RANKING: Construction guard undergoes a shift> MARKET FOCUS: Risk accelerates Saudi spending shift> QATAR LNG: Qatar’s new $8bn investment heats up global LNG race> LEADERSHIP: Shaping the future of passenger rail in the Middle EastTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/16250747/main.gif -
Saudi forecast remains one of growth3 April 2026

MEED’s April 2026 report on Saudi Arabia includes:
> COMMENT: Risk accelerates Saudi spending shift
> GVT &: ECONOMY: Riyadh navigates a changed landscape
> BANKING: Testing times for Saudi banks
> UPSTREAM: Offshore oil and gas projects to dominate Aramco capex in 2026
> DOWNSTREAM: Saudi downstream projects market enters lean period
> POWER: Wind power gathers pace in Saudi Arabia
> WATER: Sharakat plan signals next phase of Saudi water expansion
> CONSTRUCTION: Saudi construction enters a period of strategic readjustment
> TRANSPORT: Rail expansion powers Saudi Arabia’s infrastructure pushTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/16250096/main.gif -
Dubai seeks consultants for Al-Khawaneej stormwater project3 April 2026
Dubai Municipality has issued a consultancy tender to assess and upgrade the stormwater drainage system serving the Al-Khawaneej First residential district in northeastern Dubai.
The project, listed as TF-22-E1, covers the upgrading and rehabilitation of the stormwater system in the area. The tender has been issued by the municipality’s Sewerage and Recycled Water Projects Department.
The bid submission deadline is 23 April.
The works form part of Dubai’s wider efforts to strengthen flood resilience and support sustainable urban infrastructure development.
Two separate consultancy tenders were issued in March as part of a broader review of the emirate’s water and wastewater infrastructure to support future population growth.
One involves a study to develop a sustainable urban drainage systems strategy across the emirate. The other covers a review of the emirate’s sewage treatment and recycled water distribution strategy.
The Al-Khawaneej First consultancy role will include data collection, site investigations and an assessment of existing drainage conditions.
Additionally, the consultant will be required to identify flooding hotspots and evaluate the performance of the current system.
The project covers the preparation of preliminary and detailed designs, tender documents and construction packages as well as construction supervision through to project handover.
The municipality added that integrated drainage solutions are to be developed as part of the package, including sustainable drainage systems (SuDS) and nature-based approaches to address current and future stormwater demand.
READ THE APRIL 2026 MEED BUSINESS REVIEW – click here to view PDFEconomic shock threatens long-term outlook; Riyadh adjusts to fiscal and geopolitical risk; GCC contractor ranking reflects gigaprojects slowdown.
Distributed to senior decision-makers in the region and around the world, the April 2026 edition of MEED Business Review includes:
> AGENDA: Gulf economies under fire> GCC CONTRACTOR RANKING: Construction guard undergoes a shift> MARKET FOCUS: Risk accelerates Saudi spending shift> QATAR LNG: Qatar’s new $8bn investment heats up global LNG race> LEADERSHIP: Shaping the future of passenger rail in the Middle EastTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/16249098/main.jpg -
Developer plans two residential schemes in Saudi Arabia3 April 2026
Saudi developer Alramz Real Estate is planning two new residential developments in Jeddah and Riyadh.
In a Tadawul filing on 31 March, Alramz said it had signed an agreement with Oud Capital to establish a sharia-compliant real estate investment fund to develop the Alramz Front project in Jeddah’s Al-Firdous district.
The fund is targeting approximately SR650m ($173m), with Alramz committing about SR81.6m. The company will also contribute land totalling around 47,800 square metres, valued at SR215m, as an in-kind contribution.
The project is expected to deliver nearly 900 residential units. Alramz will serve as developer and exclusive marketer under a development contract valued at about SR269m.
Separately, Alramz said it had acquired mixed-use plots in Riyadh’s Al-Malqa district for SR94.6m. The 8,600 sq m site will be developed into a residential scheme comprising approximately 135 apartments.
READ THE APRIL 2026 MEED BUSINESS REVIEW – click here to view PDFEconomic shock threatens long-term outlook; Riyadh adjusts to fiscal and geopolitical risk; GCC contractor ranking reflects gigaprojects slowdown.
Distributed to senior decision-makers in the region and around the world, the April 2026 edition of MEED Business Review includes:
> AGENDA: Gulf economies under fire> GCC CONTRACTOR RANKING: Construction guard undergoes a shift> MARKET FOCUS: Risk accelerates Saudi spending shift> QATAR LNG: Qatar’s new $8bn investment heats up global LNG race> LEADERSHIP: Shaping the future of passenger rail in the Middle EastTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/16249064/main.jpg -
Oman’s Nama PWP tenders consultancy contract3 April 2026
Oman’s Nama Power & Water Procurement Company (Nama PWP) has opened a tender for the provision of environmental, social and governance (ESG) reporting consultancy services.
The tender seeks proposals from interested parties to support the utility in assessing its ESG maturity and identifying gaps against the Oman Investment Authority’s ESG guidelines.
The deadline for firms to submit offers is 10 May.
According to the tender notice, the selected consultant will develop the required ESG policies, strategy, report and implementation roadmap.
Nama PWP, part of Nama Group, said the scope of work is intended to support the company’s wider ESG framework as it continues to procure new power and water capacity in Oman.
The utility also recently opened a tender seeking proposals from qualified law firms to provide legal consultancy services in Oman.
The selected firms will be included on a panel and engaged on an as-needed basis. They will deliver legal advisory services across a range of matters relevant to Nama PWP’s business.
The deadline for firms to submit offers is 21 April.
In March, the state utility released its latest seven-year plan outlining the rapid expansion of solar and wind projects.
It expects the renewable energy share of Oman’s power generation mix to increase steadily across the period, reaching 16% in 2028 and 21% in 2029 before rising to 30% in 2030. This compares to about 4% in 2024.
The pipeline includes a series of large-scale independent power projects scheduled for delivery between 2027 and 2031.
Solar photovoltaic capacity in the sultanate is projected to rise from 1.54GW in 2024 to 23.26GW by 2031. Wind capacity is expected to grow from 120MW to 6.75GW,
READ THE APRIL 2026 MEED BUSINESS REVIEW – click here to view PDFEconomic shock threatens long-term outlook; Riyadh adjusts to fiscal and geopolitical risk; GCC contractor ranking reflects gigaprojects slowdown.
Distributed to senior decision-makers in the region and around the world, the April 2026 edition of MEED Business Review includes:
> AGENDA: Gulf economies under fire> GCC CONTRACTOR RANKING: Construction guard undergoes a shift> MARKET FOCUS: Risk accelerates Saudi spending shift> QATAR LNG: Qatar’s new $8bn investment heats up global LNG race> LEADERSHIP: Shaping the future of passenger rail in the Middle EastTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/16249021/main.jpg
