Adnoc Sour Gas evaluates bids for Shah gas plant expansion

3 October 2025

Adnoc Sour Gas is evaluating bids it has received for engineering, procurement and construction (EPC) works on a project to expand the Shah gas plant in Abu Dhabi.

Adnoc Sour Gas is a subsidiary of Abu Dhabi National Oil Company (Adnoc Group). The project aligns with Adnoc Sour Gas’ objective to increase the Shah gas plant’s sour gas processing capacity to 1.85 billion cubic feet a day (cf/d).

Based on initial evaluation of bids, China Petroleum Engineering & Construction Company (CPECC) has emerged as the lowest bidder for the Shah gas plant expansion project, sources told MEED.

Discussions between client and CPECC, along with the other bidders are ongoing, as per sources.

A contract award is not expected to take place “anytime soon”, one source said.

The following contractors, among others, are understood to have submitted bids for the Shah gas plant expansion project:

  • China Petroleum Engineering & Construction Company
  • Petrofac (UK)
  • Saipem (Italy) / Samsung E&A (South Korea)
  • Tecnimont (Italy)

MEED previously reported that contractors submitted technical bids by 13 May. Adnoc Sour Gas received commercial bids from contractors by the deadline of 31 July.

Adnoc Sour Gas is understood to have issued the main EPC tender for the Shah gas plant expansion project in December.

The company initially planned to execute the project using a feed-to-EPC model. This process requires the operator to shortlist contractors for the project’s front-end engineering and design (feed) work, with the firm that submits the best feed proposal being awarded the contract for the EPC works.

Contractors expressed interest in participating in the feed-to-EPC competition for the Shah gas plant scheme in September 2023.

Adnoc Sour Gas later cancelled the feed-to-EPC model and opted for a conventional project execution approach, according to sources.

A fresh feed tender for the project was issued “during the last quarter” of 2023, sources said at the time.

MEED previously reported that UK-headquartered Wood Group won the project’s feed work contract in January 2024.

Shah gas plant expansion

The Shah gas plant, located 210 kilometres southwest of the city of Abu Dhabi, came online in 2015 with a processing capacity of 1.28 billion cf/d.

The facility draws associated gas produced from the onshore Shah oil field, which has an output capacity of 70,000 barrels a day. In January, Adnoc announced that the Shah field had achieved a carbon intensity of 0.1 kilogrammes of carbon dioxide (CO2) equivalent per barrel of oil equivalent.

The field reached this milestone through optimised field development and the deployment of digitalisation, artificial intelligence (AI) and other technologies to maximise efficiencies and minimise emissions. The field also benefits from Adnoc’s electrification of its onshore assets, which are powered by nuclear and solar energy sources.

To increase the Shah gas plant’s output to a potential 1.45 billion cf/d, Adnoc Sour Gas undertook the Optimum Shah Gas Expansion (OGSE) project in 2021. Italian contractor Saipem was awarded a $510m contract in June of that year to execute EPC works on the project. The OGSE project is now in the commissioning stage.

Adnoc Sour Gas expects to raise the asset’s production potential to 1.85 billion cf/d through the Shah gas plant expansion project.

Shah gas plant CO2 recovery

Last year, Adnoc Sour Gas undertook a project to capture and transport CO2 emissions from the facility’s operations.

The project aimed to recover, dehydrate, compress and transport CO2 from the Shah gas plant’s operations to the Bab onshore oil field for enhanced oil recovery (EOR).

However, Adnoc Sour Gas suspended the Shah gas plant CO2 recovery project, with sources expecting it could be revived this year.

The Shah gas plant CO2 recovery project is expected to deliver up to 1.37 billion cf/d of CO2 with a 95.5 mole percentage. The CO2 recovery facilities are to be designed for a target availability of 95%, with less than 400 parts per million by volume hydrogen sulphide and less than 20 pounds of water per million cubic feet a day.

The recovered CO2 will be supplied through an approximately 125-kilometre pipeline to the Bab field for re-injection into the wells at 210-barg pressure for EOR purposes.

Adnoc Sour Gas has stipulated the use of Shell’s Cansolv CO2 capture licensed technology by the EPC contractor for the project.

Adnoc Sour Gas production

Adnoc Sour Gas, in which Adnoc Group holds the majority 60% stake and US energy company Occidental Petroleum (Oxy) holds the other 40%, currently produces 1.28 billion cf/d of gas and 4.2 million tonnes a year of sulphur from the Shah onshore sour gas field.

The Shah gas production complex in Abu Dhabi is understood to be the world’s largest ultra-sour gas facility. It includes gas processing units and a sulphur granulation plant that features four of the largest sulphur recovery units in the world.

Adnoc Sour Gas processes more than 1 billion cf/d of ultra-sour gas, with a hydrogen sulphide content of more than 23%, from a single, integrated field-gas plant development. The company accounts for about 5% of global production.

About 17,000 tonnes of granulated sulphur produced by Adnoc Sour Gas from the Shah and Habshan fields are transported by Etihad Rail to Adnoc’s Ruwais terminal every day. From there, it is exported to markets worldwide for use in fertiliser manufacturing.

Adnoc Sour Gas also produces condensates, ethane and natural gas liquids. All products, except sulphur, are delivered to Adnoc Group companies for further processing or distribution to domestic consumers.

https://image.digitalinsightresearch.in/uploads/NewsArticle/14794799/main4059.jpg
Indrajit Sen
Related Articles
  • Public Investment Fund backs Neom

    16 April 2026

    Commentary
    Colin Foreman
    Editor

    Register for MEED’s 14-day trial access 

    Saudi Arabia’s Public Investment Fund (PIF) has backed Neom by including it as one of six strategic ecosystems in its newly approved 2026-30 strategy.

    The future of the $500bn gigaproject had been thrown into doubt following the postponement of the 2029 Asian Winter Games at the Trojena mountain resort, the cancellation of construction contracts – such as the $5bn deal with Italian contractor Webuild for dam works at Trojena – and the slowdown of development at The Line, where tunnelling contracts were cancelled and staff left the project.

    The backing comes as Neom’s operational focus appears to be evolving in response to shifting regional dynamics and global economic conditions. For example, on 15 April Neom posted on its official X account about a new Europe-Egypt-Neom-GCC corridor, describing it as a faster route for time-sensitive goods. It said the corridor combines trucking and ferry services to move goods quickly into the Gulf, adding that importers from several European markets are already using it to reach the UAE, Kuwait, Iraq, Oman and beyond.

    Powered by Pan Marine, DFDS and regional RoPax services, the initiative is positioned as a way to add flexibility and resilience to regional supply chains. This emphasis on logistics and immediate trade utility suggests a shift away from the more speculative architectural announcements that characterised Neom’s early years, towards activity more directly tied to current market realities.

    PIF’s broader 2026-30 strategy places heavy emphasis on “delivering competitive domestic ecosystems to connect sectors, unlock the full potential of strategic assets, maximise long-term returns and continue to drive the economic transformation of Saudi Arabia”.

    The inclusion of Neom as a standalone ecosystem within the Vision Portfolio suggests that while the project remains part of the kingdom’s Vision 2030 goals, it will be subject to the fund's focus on working with the private sector.

    That means the long-term success of Neom will increasingly depend on its ability to attract external investment and function as a viable economic hub rather than just a state-funded construction site.


    MEED’s April 2026 report on Saudi Arabia includes:

    > COMMENT: Risk accelerates Saudi spending shift
    > GVT &: ECONOMY: Riyadh navigates a changed landscape
    > BANKING: Testing times for Saudi banks
    > UPSTREAM: Offshore oil and gas projects to dominate Aramco capex in 2026
    > DOWNSTREAM: Saudi downstream projects market enters lean period
    > POWER: Wind power gathers pace in Saudi Arabia

    > WATER: Sharakat plan signals next phase of Saudi water expansion
    > CONSTRUCTION: Saudi construction enters a period of strategic readjustment
    > TRANSPORT: Rail expansion powers Saudi Arabia’s infrastructure push

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/16417262/main.jpeg
    Colin Foreman
  • Kuwait gas project worth $3.3bn put on hold

    16 April 2026

     

    State-owned Kuwait Gulf Oil Company’s (KGOC’s) planned tender for the development of an onshore gas plant next to the Al-Zour refinery has been put on hold due to uncertainty created by the US and Israel’s war with Iran, according to industry sources.

    The project budget is estimated to be $3.3bn, and the last meeting with contractors to discuss the project took place in Kuwait on 10 February.

    Previously, it was expected to be tendered in late March, but the tendering process was delayed due to the regional conflict and disruption to shipping through the Strait of Hormuz.

    One source said: “This tender is now effectively on hold while KGOC waits for increased stability in the region before it invites companies to bid for the contract.”

    Under current plans, the plant will have the capacity to process up to 632 million cubic feet a day of gas and 88.9 million barrels a day of condensates from the Dorra offshore field, located in Gulf waters in the Saudi-Kuwait Neutral Zone.

    Ownership of the field is disputed by Iran, which refers to the field as Arash.

    Iran claims the field partially extends into Iranian territory and asserts that Tehran should be a stakeholder in its development.

    It is believed that the Dorra field’s close proximity to Iran will make development difficult due to the current security environment.

    The offshore elements of the project are expected to be especially difficult to protect from attacks from Iran.

    In July last year, MEED reported that KGOC had initiated the project by launching an early engagement process with contractors for the main engineering, procurement and construction tender.

    France-based Technip Energies completed the contract for the front-end engineering and design.


    READ THE APRIL 2026 MEED BUSINESS REVIEW – click here to view PDF

    Economic shock threatens long-term outlook; Riyadh adjusts to fiscal and geopolitical risk; GCC contractor ranking reflects gigaprojects slowdown.

    Distributed to senior decision-makers in the region and around the world, the April 2026 edition of MEED Business Review includes:

    > GCC CONTRACTOR RANKING: Construction guard undergoes a shift
    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/16413221/main.png
    Wil Crisp
  • Iraq pushes to revive oil pipeline through Saudi Arabia

    16 April 2026

    Iraq is pushing to revive an oil pipeline that passes through Saudi Arabia, allowing it to diversify export routes.

    Saheb Bazoun, a spokesman for Iraq’s Oil Ministry, said the pipeline would help to insulate Iraq from any future blockades of the Strait of Hormuz, which has been largely closed since 28 February.

    The original pipeline through Saudi Arabia has not been used for more than 30 years and would need work to be done in order to bring it online.

    It is 1,568km long, extending from the city of Zubair in Iraq to the Saudi port of Yanbu on the Red Sea.

    The pipeline was built in two phases during the 1980s. The first phase stretches between Zubair and Khurais, while the second extends to Yanbu. The pipeline’s operating capacity reached over 1.6 million barrels a day (b/d).

    Following the Gulf War, the pipeline was shut down in August 1990. It has remained out of operation for decades, despite Iraq’s several attempts to restart it.

    The original pipeline project cost over $2.6bn, including storage tanks and loading terminals.

    In the wake of the US and Israel attacking Iran on 28 February, global markets have lost 11 million barrels a day (b/d) of oil supply due to the effective closure of the Strait of Hormuz.


    READ THE APRIL 2026 MEED BUSINESS REVIEW – click here to view PDF

    Economic shock threatens long-term outlook; Riyadh adjusts to fiscal and geopolitical risk; GCC contractor ranking reflects gigaprojects slowdown.

    Distributed to senior decision-makers in the region and around the world, the April 2026 edition of MEED Business Review includes:

    > GCC CONTRACTOR RANKING: Construction guard undergoes a shift
    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/16413290/main.jpg
    Wil Crisp
  • Algeria opens bidding for water treatment plant

    15 April 2026

     

    State-owned Cosider Pipelines, part of Algeria’s public infrastructure group Cosider, has issued a tender for the construction of a demineralisation plant in In Salah in Algeria.

    The contract covers the design, supply, installation, testing and commissioning of a plant with a treatment capacity of 62,000 cubic metres a day (cm/d).

    The tender is open to local and international companies specialising in the design and construction of demineralisation and reverse osmosis desalination plants.

    The bid submission deadline is 26 April.

    The project will be located at In Salah, a key industrial area in southern Algeria, where treated water supply is important for both municipal and industrial use.

    Cosider said that individual bidders must demonstrate that they have completed at least one reverse osmosis demineralisation or desalination plant with a capacity of 20,000 cubic metres a day or more.

    They must also show an average annual turnover of at least AD1bn ($7.7m) for their five best years over the past decade.

    For consortium bids, all partners must share full responsibility for the contract, while the lead company must meet the technical and financial requirements.

    Recent projects

    In 2023, MEED reported that Riyadh-based water utility developer Wetico had won two contracts to develop water desalination plants in Algeria.

    Societe Algerienne de Realisation de Projects Industriels (Sarpi) awarded the contract for the El-Tarf desalination plant, while Entreprise Nationale de Canalisations (Enac) is the client for the Bejaja facility.

    Both plants were commissioned in 2025, each with a production capacity of 300,000 cm/d.

    Separately, Wetico was the main contractor on a third plant commissioned last year. The Cap Dijinet 2 seawater desalination plant in Boumerdes province covers 18 hectares and also has a capacity of 300,000 cm/d.

    Like many countries, Algeria is facing pressure on resources due to longer and more frequent droughts. Seawater desalination is seen as a key driver of the government’s strategy to guarantee drinking water supply.

    According to previous reports, the government is planning to build up to six additional plants by 2030.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/16404325/main.jpg
    Mark Dowdall
  • WEBINAR: UAE Projects Market 2026

    15 April 2026

    Webinar: UAE Projects Market 2026
    Tuesday, 28 April 2026 | 11:00 GST  |  Register now


    Agenda:

    • Overview of the UAE projects market landscape
    • 2025 projects market performance
    • Value of work awarded 2026 YTD
    • Impact of the Iran conflict on the projects market and real estate, assessing supply chain disruptions, material cost inflation and war risk premiums
    • Key drivers, challenges and opportunities
    • Size of future pipeline by sector and status
    • Ranking of the top contractors and clients
    • Summary of key current and future projects
    • Short and long-term market outlook
    • Audience Q&A

    Hosted by: Colin Foreman, editor of MEED 

    Colin Foreman is editor and a specialist construction journalist for news and analysis on MEED.com and the MEED Business Review magazine. He has been reporting on the region since 2003, specialising in the construction sector and its impact on the broader economy. He has reported exclusively on a wide range of projects across the region including Dubai Metro, the Burj Khalifa, Jeddah Airport, Doha Metro, Hamad International airport and Yas Island. Before joining MEED, Colin reported on the construction sector in Hong Kong.

    Click here to register

    https://image.digitalinsightresearch.in/uploads/NewsArticle/16401868/main.gif
    Colin Foreman