Hassan Allam eyes role in Saudi Arabia’s transformation

16 May 2025

 

As Saudi Arabia undertakes a generational transformation under Vision 2030, regional players with deep engineering and construction expertise are emerging as critical enablers of this historic journey.

Among them, Egypt-headquartered Hassan Allam Holding has rapidly expanded its footprint in the kingdom, leveraging a legacy that dates back over 85 years and a proven regional model built on operational excellence and sustainable growth.

MEED spoke exclusively with Hassan Allam, CEO of Hassan Allam Holding, to discuss the firm’s role and future plans in the kingdom.

Founded in 1936, Hassan Allam Holding’s vision in Saudi Arabia is rooted in delivering long-term value while maintaining a high-quality standard across diverse sectors.

With a presence now in over 10 countries, the group brings cross-market expertise and resource optimisation to some of the kingdom’s most ambitious projects.

“Saudi Arabia, given its scale, ambition and market maturity, plays a central role in our regional strategy,” Allam says.

Deepening roots in the kingdom

The company’s journey in Saudi Arabia began over 40 years ago, but its recent establishment of a regional headquarters in Riyadh marks a significant institutional shift.

“This move has enabled us to engage more deeply with key stakeholders, navigate regulatory frameworks with greater efficiency and build strong local partnerships,” Allam explains.

This embedded approach has allowed Hassan Allam to localise its supply chains, access talent pools more effectively and align closely with Saudi Arabia’s major development programmes.

“The kingdom is not just another market – it is a strategic hub where Hassan Allam has made significant investments in capabilities, people and systems,” Allam adds.

Contributing to Vision 2030

Hassan Allam’s operations in Saudi Arabia fully align with Vision 2030’s objectives to diversify the economy, enhance quality of life and ensure sustainable development.

“Our operations are structured to support national objectives through a diversified portfolio, leveraging our deep technical expertise and regional track record,” Allam says.

Projects span a wide range of sectors, including infrastructure, transportation, hospitality, water treatment and environmental sustainability. Notable among these are several luxury hospitality developments in collaboration with Red Sea Global, such as the Four Seasons, Six Senses and Rosewood hotels at the Amaala destination. These projects exemplify the group’s commitment to delivering high-end, sustainable tourism offerings.

Environmental initiatives are also a core part of the company’s portfolio. “In Neom, we are proud to contribute to the world’s largest coral reef restoration initiative in collaboration with Kaust,” Allam notes, highlighting a pioneering effort in marine conservation.

Managing complexity at scale

Executing gigaprojects on accelerated timelines requires agility, precision and scale, all of which are hallmarks of Hassan Allam’s approach in the kingdom. With over 50,000 professionals across the region, the group deploys integrated planning, early stakeholder engagement and digital project management to manage complex scopes.

“Our track record includes delivering time-sensitive, high-impact projects like the luxury hospitality hotels in Amaala and the King Abdullah Financial District monorail,” Allam explains. Modular construction, strong supply chains and lean practices ensure that speed never comes at the expense of quality or safety.

The company also made major investments in adopting construction technology across its Saudi projects. Through its dedicated technical and digital delivery department, which evolved from its building information modelling (BIM) department, founded in 2018, the company deploys technologies like 3D to 6D BIM, geographic information systems, laser scanning, drones, augmented reality/virtual reality, digital twins and artificial intelligence.

“These technologies are applied from early tendering and design through construction, as-built documentation and handover,” Allam notes. The result is enhanced efficiency, cost control and real-time decision-making, key advantages in a market where time and precision are critical.

“Our digital platforms also support real-time collaboration among stakeholders, improving decision-making and enabling proactive risk management,” Allam adds.

Investing in local talent

In line with Saudi Arabia’s workforce nationalisation agenda, Hassan Allam is deeply committed to developing local talent. “Our approach goes beyond compliance with Saudisation targets; it reflects a long-term investment in building a skilled, empowered and future-ready workforce,” Allam says.

Its dedicated talent programme provides structured rotational assignments and mentorship for young Saudi professionals. Internship and cooperative training programmes offer hands-on project exposure, while ongoing annual training plans ensure continued growth for the broader workforce.

Our approach goes beyond compliance with Saudisation targets; it reflects a long-term investment in building a skilled, empowered and future-ready workforce
Hassan Allam, CEO of Hassan Allam Holding

Navigating challenges with strategic vision

Operating in Saudi Arabia does come with its complexities, from rapidly evolving regulations to high localisation standards. But the company views these as opportunities.

“What sets Saudi Arabia apart from other GCC countries is the scale and structure of government support, particularly through the Public Investment Fund (PIF),” Allam notes.

Through close collaboration with PIF, Hassan Allam has scaled up rapidly, mobilising over 3,600 employees across 15 ongoing projects in the kingdom.

When entering joint ventures or bidding on gigaproject components, Hassan Allam maintains a cautious yet ambitious strategy.

“We approach every joint venture and project bid with a measured, strategic mindset that weighs both opportunity and risk through comprehensive due diligence,” Allam says.

The focus is on long-term value creation, working with reputable partners and adhering to stringent internal risk protocols. Already, the company has secured over 14 project awards in the kingdom, further solidifying Saudi Arabia’s importance in its regional portfolio.

Looking ahead

The next three to five years are expected to witness continued momentum in Saudi Arabia’s construction and infrastructure space, driven by sustained public investment and rising private sector engagement. Hassan Allam Holding is positioning itself to be a key player in this transformation.

“Our strategic priorities will focus on expanding our local footprint, building strong and enduring partnerships, and advancing our digital and sustainability initiatives,” Allam outlines.

With a legacy of engineering excellence and a future-focused approach, Hassan Allam Holding is set to play an integral role in shaping Saudi Arabia’s next chapter.

https://image.digitalinsightresearch.in/uploads/NewsArticle/13850823/main0536.jpg
Yasir Iqbal
Related Articles
  • Ora Developers adds land bank to its Bayn masterplan

    17 April 2026

    Egyptian firm Ora Developers has signed a land acquisition agreement with Abu Dhabi-based developer Modon Holding to acquire an additional 4.8 million square metres (sq m) of land in the Ghantoot area between Abu Dhabi and Dubai.

    Ora Developers said that the land acquisition will increase the existing Bayn masterplan from 4.8 million sq m to 9.6 million sq m.

    The firm added that the total investment in the masterplan upon completion is expected to reach AED30bn ($8bn).

    In January, Ora Developers appointed six engineering consultancies to lead the development of the first phase of its Bayn residential community project.

    The developer appointed UK-based firm Mace to lead the overall project management.

    Canadian firm WSP will serve as the masterplan, infrastructure, landscape and water bodies design consultant, as reported by MEED in May last year.

    Another US firm, Aecom, will provide construction supervision services.

    Hong Kong’s 10 Design is the project’s architectural concept design consultant.

    Local firm Dewan Architects & Engineers is the project’s design consultant and architect of record.

    The UK’s Currie & Brown is the cost consultant.

    The first phase will offer 805 villas and townhouses, and the project is expected to be completed in 2028.

    The project will also include a neighbourhood park, sports facilities, a water park, a five-star hotel and a shopping mall.

    In December last year, Abu Dhabi government-owned contractor NMDC Group won a AED142m ($39m) contract from Ora Developers.

    The contract scope covers the execution of enabling works on the Bayn masterplan.

    The main construction works on the project's first phase are expected to begin in the second quarter of this year.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/16439214/main.jpg
    Yasir Iqbal
  • SAR extends deadline for Riyadh section of Saudi Landbridge

    16 April 2026

     

    Saudi Arabia Railways (SAR) has set a deadline of 29 April for a design-and-build contract for the construction of a new railway line, the Riyadh Rail Link, which will run from north to south Riyadh.

    The tender was issued on 29 January. The previous bid submission deadline was 29 March.

    The scope of work includes constructing a 35-kilometre-long double-track railway line connecting SAR’s North-South railway to the Eastern railway network.

    The contract also covers the procurement, construction and installation of associated infrastructure such as viaducts, civil works, utility installations, signalling systems and other related works.

    The project is expected to form a key component of the Saudi Landbridge railway.

    In January, SAR said it will deliver the Saudi Landbridge project through a “new mechanism” by 2034, after failing to reach an agreement with a Chinese consortium for the construction of the project, as MEED reported.

    In an interview with local media, SAR CEO Bashar Bin Khalid Al-Malik said the consortium failed to meet local content requirements and that the project will now be delivered in several phases under a different procurement model.

    The project has been under negotiation between Saudi Arabia and China-backed investors keen to develop it through a public-private partnership.

    Al-Malik said that the project cost is about SR100bn ($26.6bn).

    It comprises more than 1,500 kilometres (km) of new track. The core component is a 900km new railway between Riyadh and Jeddah, which will provide direct freight access to the capital from King Abdullah Port on the Red Sea.

    Other key sections include upgrading the existing Riyadh-Dammam line, a bypass around the capital called the Riyadh Link, and a link between King Abdullah Port and Yanbu.

    The Saudi Landbridge is one of the kingdom’s most anticipated project programmes. Plans to develop it were first announced in 2004, but put on hold in 2010 before being revived a year later. Key stumbling blocks were rights-of-way issues, route alignment and its high cost.


    MEED’s April 2026 report on Saudi Arabia includes:

    > COMMENT: Risk accelerates Saudi spending shift
    > GVT &: ECONOMY: Riyadh navigates a changed landscape
    > BANKING: Testing times for Saudi banks
    > UPSTREAM: Offshore oil and gas projects to dominate Aramco capex in 2026
    > DOWNSTREAM: Saudi downstream projects market enters lean period
    > POWER: Wind power gathers pace in Saudi Arabia

    > WATER: Sharakat plan signals next phase of Saudi water expansion
    > CONSTRUCTION: Saudi construction enters a period of strategic readjustment
    > TRANSPORT: Rail expansion powers Saudi Arabia’s infrastructure push

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/16418597/main.gif
    Yasir Iqbal
  • Public Investment Fund backs Neom

    16 April 2026

    Commentary
    Colin Foreman
    Editor

    Register for MEED’s 14-day trial access 

    Saudi Arabia’s Public Investment Fund (PIF) has backed Neom by including it as one of six strategic ecosystems in its newly approved 2026-30 strategy.

    The future of the $500bn gigaproject had been thrown into doubt following the postponement of the 2029 Asian Winter Games at the Trojena mountain resort, the cancellation of construction contracts – such as the $5bn deal with Italian contractor Webuild for dam works at Trojena – and the slowdown of development at The Line, where tunnelling contracts were cancelled and staff left the project.

    The backing comes as Neom’s operational focus appears to be evolving in response to shifting regional dynamics and global economic conditions. For example, on 15 April Neom posted on its official X account about a new Europe-Egypt-Neom-GCC corridor, describing it as a faster route for time-sensitive goods. It said the corridor combines trucking and ferry services to move goods quickly into the Gulf, adding that importers from several European markets are already using it to reach the UAE, Kuwait, Iraq, Oman and beyond.

    Powered by Pan Marine, DFDS and regional RoPax services, the initiative is positioned as a way to add flexibility and resilience to regional supply chains. This emphasis on logistics and immediate trade utility suggests a shift away from the more speculative architectural announcements that characterised Neom’s early years, towards activity more directly tied to current market realities.

    PIF’s broader 2026-30 strategy places heavy emphasis on “delivering competitive domestic ecosystems to connect sectors, unlock the full potential of strategic assets, maximise long-term returns and continue to drive the economic transformation of Saudi Arabia”.

    The inclusion of Neom as a standalone ecosystem within the Vision Portfolio suggests that while the project remains part of the kingdom’s Vision 2030 goals, it will be subject to the fund's focus on working with the private sector.

    That means the long-term success of Neom will increasingly depend on its ability to attract external investment and function as a viable economic hub rather than just a state-funded construction site.


    MEED’s April 2026 report on Saudi Arabia includes:

    > COMMENT: Risk accelerates Saudi spending shift
    > GVT &: ECONOMY: Riyadh navigates a changed landscape
    > BANKING: Testing times for Saudi banks
    > UPSTREAM: Offshore oil and gas projects to dominate Aramco capex in 2026
    > DOWNSTREAM: Saudi downstream projects market enters lean period
    > POWER: Wind power gathers pace in Saudi Arabia

    > WATER: Sharakat plan signals next phase of Saudi water expansion
    > CONSTRUCTION: Saudi construction enters a period of strategic readjustment
    > TRANSPORT: Rail expansion powers Saudi Arabia’s infrastructure push

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/16417262/main.jpeg
    Colin Foreman
  • Kuwait gas project worth $3.3bn put on hold

    16 April 2026

     

    State-owned Kuwait Gulf Oil Company’s (KGOC’s) planned tender for the development of an onshore gas plant next to the Al-Zour refinery has been put on hold due to uncertainty created by the US and Israel’s war with Iran, according to industry sources.

    The project budget is estimated to be $3.3bn, and the last meeting with contractors to discuss the project took place in Kuwait on 10 February.

    Previously, it was expected to be tendered in late March, but the tendering process was delayed due to the regional conflict and disruption to shipping through the Strait of Hormuz.

    One source said: “This tender is now effectively on hold while KGOC waits for increased stability in the region before it invites companies to bid for the contract.”

    Under current plans, the plant will have the capacity to process up to 632 million cubic feet a day of gas and 88.9 million barrels a day of condensates from the Dorra offshore field, located in Gulf waters in the Saudi-Kuwait Neutral Zone.

    Ownership of the field is disputed by Iran, which refers to the field as Arash.

    Iran claims the field partially extends into Iranian territory and asserts that Tehran should be a stakeholder in its development.

    It is believed that the Dorra field’s close proximity to Iran will make development difficult due to the current security environment.

    The offshore elements of the project are expected to be especially difficult to protect from attacks from Iran.

    In July last year, MEED reported that KGOC had initiated the project by launching an early engagement process with contractors for the main engineering, procurement and construction tender.

    France-based Technip Energies completed the contract for the front-end engineering and design.


    READ THE APRIL 2026 MEED BUSINESS REVIEW – click here to view PDF

    Economic shock threatens long-term outlook; Riyadh adjusts to fiscal and geopolitical risk; GCC contractor ranking reflects gigaprojects slowdown.

    Distributed to senior decision-makers in the region and around the world, the April 2026 edition of MEED Business Review includes:

    > GCC CONTRACTOR RANKING: Construction guard undergoes a shift
    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/16413221/main.png
    Wil Crisp
  • Iraq pushes to revive oil pipeline through Saudi Arabia

    16 April 2026

    Iraq is pushing to revive an oil pipeline that passes through Saudi Arabia, allowing it to diversify export routes.

    Saheb Bazoun, a spokesman for Iraq’s Oil Ministry, said the pipeline would help to insulate Iraq from any future blockades of the Strait of Hormuz, which has been largely closed since 28 February.

    The original pipeline through Saudi Arabia has not been used for more than 30 years and would need work to be done in order to bring it online.

    It is 1,568km long, extending from the city of Zubair in Iraq to the Saudi port of Yanbu on the Red Sea.

    The pipeline was built in two phases during the 1980s. The first phase stretches between Zubair and Khurais, while the second extends to Yanbu. The pipeline’s operating capacity reached over 1.6 million barrels a day (b/d).

    Following the Gulf War, the pipeline was shut down in August 1990. It has remained out of operation for decades, despite Iraq’s several attempts to restart it.

    The original pipeline project cost over $2.6bn, including storage tanks and loading terminals.

    In the wake of the US and Israel attacking Iran on 28 February, global markets have lost 11 million barrels a day (b/d) of oil supply due to the effective closure of the Strait of Hormuz.


    READ THE APRIL 2026 MEED BUSINESS REVIEW – click here to view PDF

    Economic shock threatens long-term outlook; Riyadh adjusts to fiscal and geopolitical risk; GCC contractor ranking reflects gigaprojects slowdown.

    Distributed to senior decision-makers in the region and around the world, the April 2026 edition of MEED Business Review includes:

    > GCC CONTRACTOR RANKING: Construction guard undergoes a shift
    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/16413290/main.jpg
    Wil Crisp