Contractors in the region have increased their orderbooks in the past year as the GCC’s key construction markets – Saudi Arabia and the UAE – have continued to award major contracts. 

In Saudi Arabia, the rate of growth has not matched that experienced in 2023-24, which suggests that the market is reaching saturation at time when client bodies are assessing their future spending plans.

In the UAE, the value of projects that contractors are working on has increased significantly, which reflects the start of public works schemes such as the Dubai Metro, as well as the ongoing boom in real estate, which has allowed developers to start work on an array of new building projects.

Top performers

Based on data from regional projects tracker MEED Projects, the GCC’s most active contractor is Saudi Arabia’s Nesma & Partners, with $13.9bn of work at the execution stage. While it remains the top-ranked contractor, the total value of projects it has at the execution stage has dropped from the $15bn total it had in 2024.

While Nesma & Partners remains the top-ranked contractor in 2025, the total value of projects it has at the execution stage has dropped

In 2024, Nesma was ahead of the second-ranked contractor by $5bn – Italy’s Webuild had $10bn of projects under execution last year. This year, the contractor in second place, Beijing-based China State Construction Engineering Corporation, is just $300m behind Nesma with $13.5bn. China State has grown strongly over the past five years, as it has expanded its presence in Saudi Arabia significantly and is now the second-ranked contractor in the kingdom. 

Turkiye’s Limak, which is in third position, is also close behind with $12.9bn of projects under execution. Limak has added the Dubai Metro Blue Line project to its existing work on Kuwait International airport.

There are five other Saudi firms in the top 10, which reflects the kingdom’s status as the region’s largest construction market, and the ambition and scale of its infrastructure spending and gigaprojects programme. 

The other Saudi contractors in the top 10 are Almabani in fourth place with $8.5bn of projects; Shibh Al-Jazira, which also has $8.5bn of projects, in fifth; and El-Seif Engineering Contracting in sixth with $8.3bn of projects under execution. 

Al-Bawani then follows in eighth position with $7.3bn of projects, and Saudi Binladin Group rounds out the top 10 with $6.5bn of projects in 10th place.

The other contractors in the top 10 are Abu Dhabi-headquartered Trojan General Contracting, which is in seventh place with $8bn of projects, and Dubai-based Alec, which has secured ninth place in the ranking with $6.8bn of work at the execution stage, spilt between its home market in the UAE and Saudi Arabia.

Alec is reportedly considering an initial public offering, which is another sign of how well the construction sector is performing in 2025.

Bahrain

The top two contractors in Bahrain’s ranking in 2025 remain the same. China Machinery Engineering Corporation (CMEC) retains the top spot with $700m of work at the execution phase. The Chinese contractor’s work centres on building residential units at East Sitra for the Housing & Urban Planning Ministry. In July 2024, it signed a deal to build 1,269 houses for the third phase of the scheme.

The third phase adds to the project’s second phase, which has 531 units and was handed over in early 2024. The first phase, which has 1,077 units, has also been handed over. The housing ministry signed a BD260m ($689.9m) deal with CMEC for the construction of more than 3,000 housing units at East Sitra in December 2019.

Al-Hamad Building Contracting remains the second-ranked contractor. Its largest project is the longstanding Villamar residential complex at Bahrain Financial Harbour in Manama for Gulf Holding Company.

Grnata joins the top 10 in third position. Its largest ongoing project is the Golden Gate Towers scheme in Manama for the Grnata Group, which involves the construction of two towers, one with 45 and the other with 53 storeys, that together will have a total of 746 apartments.

Grnata edges out Nass Contracting, which was in third place in 2024. Nass drops down the ranking despite two high-profile contract awards. In May 2024, its joint venture with Nassir Hazza & Bros won a BD37.2m contract for the construction works on package three of the Busaiteen Link scheme for the Works Ministry.

Nass also won a $45m contract in June 2024 for the expansion of the campus of the Royal College of Surgeons in Ireland-Medical University of Bahrain in the Al-Sayh area of Muharraq Governorate.

Kuwait

For the second year running, Turkiye’s Limak Holding has strengthened its position at the top of Kuwait’s ranking. The contractor has $6.1bn of construction work at the execution stage, according to MEED Projects. This is about $500m more than the $5.6bn it had in 2024.

In October 2024, Limak was one of the contractors that secured work as part of more than KD400m ($1.3bn) of road maintenance works contracts that were awarded by the Public Works Ministry to 18 local and international companies.

The road work adds to Limak’s ongoing works at Kuwait International airport. In 2023, it secured a contract for package three of the expansion of Terminal 2, which covers the construction of aircraft parking aprons, taxiways and service buildings.

China Gezhouba Group Corporation is in second position. In March this year, it won two contracts worth over $557m from Kuwait’s Public Authority for Housing Welfare for the South Saad Al-Abdullah residential project in Al-Jahra Governorate.

China Gezhouba Group Corporation’s rise to second place shifts Shapoorji Pallonji into third place. The Indian contractor is working on two healthcare projects and one education scheme in a joint venture with the local Al-Sager General Trading & Contracting, which is also working on $1.4bn of projects at the execution stage.

Oman

The local Galfar Engineering & Contracting topped Oman’s 2024 ranking with $900m of work at the execution stage. In 2025, there are seven contractors in Oman that have more than $900m of construction work under execution, which reflects an increased level of projects activity across the sultanate. 

Galfar remains the top-ranked contractor in 2025 with $2.5bn of work at the execution phase. 

Last year, as part of a consortium with Abu Dhabi-based National Projects Construction, National Infrastructure Construction Company and Tristar Engineering & Construction, it won an estimated $1.5bn design-and-build contract for the Hafeet Railway project connecting the sultanate with the UAE. It also won a $119.5m contract from the Transport, Communication & Information Technology Ministry for the dualisation of the road connecting the city of Nizwa and the nearby town of Izki.

The overall uptick in projects activity in Oman has meant that the 10th-ranked contractor in 2025 has $500m of work at the execution stage compared to just $200m for the 10th-ranked contractor in 2024. 

Qatar

UCC Holding leads the Qatar ranking in 2025. The local firm was ranked the fifth most active contractor in 2024 with $1.2bn of projects at the execution stage. That total has increased to $1.3bn this year, and with the Qatar construction market remaining subdued after the Fifa World Cup in 2022, it is enough to take UCC to the top of the ranking. 

The contractor’s main ongoing projects are part of the country’s public-private partnership schools scheme. Earlier this year, it signed an estimated $330m deal covering the design, build and maintenance of 14 schools in several areas of Qatar.

UCC Holding also has two major road schemes under execution for the Public Works Authority (Ashghal). UCC is in a joint venture with Infraroad Trading & Contracting Company for both projects. 

The first contract, valued at $170m, covers the construction of the roads and infrastructure works in Al-Mearad and southwest of Muaither. The other, valued at $150m, covers the construction of roads and infrastructure works in the Al-Kharaitiyat and Izghawa areas of Doha.

UCC replaces Turkiye’s TAV Construction and the local Midmac Contracting Company, which jointly held the top ranking position in 2024 with $1.4bn of projects at the execution phase thanks to the terminal expansion programme at Hamad International airport. 

The expansion, which has added 51,000 square metres of space to the airport, including eight new gates, opened in February this year.

Saudi Arabia

There was an expectation in 2024 that Saudi Arabia’s contractor ranking would be transformed in 2025 as development activity accelerated on projects across the kingdom. 

While activity in the kingdom continues, the pace of awards has levelled off as the government and the Public Investment Fund (PIF) have begun to prioritise projects. This drive to rationalise the projects market can be seen in the contractor ranking for 2025. 

Like last year, Nesma tops the list, with $13.9bn of work at the execution stage. This total is less than the $14.7bn of projects that the local contractor had in 2024. 

China State Construction Engineering Company is in second with $9.3bn of projects under execution. The Beijing-based contractor has risen up the ranking from 10th place last year, when it had $3.9bn of projects under execution.

The largest new contract that the firm has secured in the past year is a $3bn scheme to deliver 2,000 housing units for the National Housing Company at several locations in the kingdom. 

China State is joined in the top 10 in 2025 by another Chinese contractor: China Harbour Engineering Corporation, which is in 10th place with $5.6bn of work. One of its recent wins was in June last year, when it secured an $800m contract in joint venture with Al-Ayuni Investment & Contracting for the construction works on the second southern ring road in Riyadh.

China Harbour replaces Greece’s Archirodon, which has dropped out of the Saudi top 10 in 2025. The other contractors in the 2025 top 10 ranking remain from 2024. 

UAE

There is no change at the top of the UAE contractor ranking, as Abu Dhabi-based Trojan General Contracting once again leads in 2025. The firm has $7.2bn of projects under execution this year, compared to $6.2bn in 2024.

There have been significant changes to the companies making up the rest of the ranking, however, and to the value of projects that contractors have under execution. This reflects a shift in the market in 2024, as government-backed infrastructure projects moved into construction. 

In 2024, the second-ranked contractor was Abu Dhabi-based National Marine Dredging Company with $3.1bn of projects under execution – a total that would not even make the top 10 in 2025. This year, it is the fifth-ranked contractor, with $4.7bn-worth of projects.

In 2025, the second-ranked contractor is Turkiye’s Mapa with $6bn of projects – thanks largely to a contract it secured in December 2024 for the Blue Line extension of Dubai Metro. Mapa is joined by China’s CRRC Corporation in third place and Turkiye’s Limak in fourth, which are also working on the Blue Line project. 

Abu Dhabi-headquartered Arabian Construction Company is the sixth-ranked contractor with $4.5bn. The firm, which specialises in high-end building projects, returns to the top 10 amid reports that it is planning to list on the stock market with an initial public offering.

The other contractors in the UAE’s top 10 listing are Beijing-based China State Construction Engineering Corporation, India’s Sobha, UK-headquartered Innovo and the local Alec. 

Alec has dropped from fourth position in 2024 to 10th this year, despite increasing the value of projects under execution from $2.6bn to $3.3bn, which reflects how much contractors’ orderbooks have filled up over the past year.

https://image.digitalinsightresearch.in/uploads/NewsArticle/13767362/main.gif
Colin Foreman
Related Articles
  • WEBINAR: Saudi gigaprojects 2026 and beyond

    7 November 2025

    Webinar: Saudi Gigaprojects 2026 & Beyond
    Tuesday 25 November 2025 | 11:00 GST  |  Register now


    Agenda:

    • Latest update to November 2025 on the gigaprojects programme and the Saudi projects market in general, with full data analysis for 2025 year-to-date
    • Latest assessment on the reprioritisation of the programme and views on which of the gigaprojects are being prioritised
    • Summary of key recent project developments and announcements 
    • Analysis of key contracts awarded this year to date
    • Highlights of key contracts to be tendered and awarded over the next six months
    • Key drivers and challenges going forward plus MEED’s outlook for the future short and long-term prospects of the gigaprojects programme
    • In-depth look at the recently announced King Salman Gate gigaproject and other planned, but unannounced PIF developments
    • Life beyond the gigaprojects – what other key project programmes are being implemented in the kingdom 
    • Q&A session

    Hosted by: Edward James, head of content and analysis at MEED

    A well-known and respected thought leader in Mena affairs, Edward James has been with MEED for more than 19 years, working as a researcher, consultant and content director. Today he heads up all content and research produced by the MEED group. His specific areas of expertise are construction, hydrocarbons, power and water, and the petrochemicals market. He is considered one of the world’s foremost experts on the Mena projects market. He is a regular guest commentator on Middle East issues for news channels such as the BBC, CNN and ABC News and is a regular speaker at events in the region. 

    Click here to register

    https://image.digitalinsightresearch.in/uploads/NewsArticle/15045990/main.gif
    Edward James
  • Bahrain advances utility reform

    7 November 2025

     

    In September, Bahrain’s government referred a draft law to parliament to restructure the kingdom’s electricity and water sector.

    This proposes dissolving the Electricity & Water Authority (Ewa) and transferring its assets and functions to a newly established National Electricity & Water Company, which will operate under the oversight of the Electricity & Water Regulatory Authority. 

    The reform marks the first full structural overhaul of Bahrain’s utilities sector in nearly two decades and signals a shift towards a more commercially driven model. 

    Regulatory and operational roles would be separated for the first time, allowing private sector participation under transparent licensing and tariff systems, aligning Bahrain with utility reforms seen in Saudi Arabia, Oman and the UAE.

    It comes amid a relatively subdued year for new contracts that broadly falls in line with 2024’s performance. Most significantly, Bahrain continues to move towards its two upcoming utility public-private partnership (PPP) schemes, the Sitra independent water and power project (IWPP) and the Al-Hidd independent water project (IWP).

    In August, a developer tender was issued for the main works package for the Sitra IWPP. This followed the prequalification of seven companies and consortiums, reflecting a wide range of international interest.

    The planned Sitra IWPP replaces the previously planned Al-Dur 3 and will be the first IWPP project to be awarded since the 1,500MW Al-Dur 2 IWPP was completed in 2021.

    The combined-cycle gas turbine (CCGT) plant is expected to have a production capacity of about 1,200MW of electricity, while the project’s seawater reverse osmosis (SWRO) desalination unit will have a production capacity of 30 million imperial gallons a day (MIGD) of potable water. The main contract is expected to be awarded by the end of the year, with commercial operations set for 2029. 

    A developer tender was also recently launched for Bahrain’s first independent, standalone SWRO plant following a prequalification process that shortlisted nine companies and consortiums.

    The Al-Hidd IWP is expected to have a production capacity of about 60MIGD of potable water and be completed in 2028. It is likely to be the last IWPP for Bahrain, which aims to reach net-zero carbon emissions by 2060.

    The imminent launch of the two projects boosts Bahrain’s projects pipeline, which has experienced muted growth in the aftermath of the Covid-19 pandemic, carried by relatively small-scale projects.

    Solar PV projects

    The creation of the National Electricity & Water Company as Bahrain’s new operational entity could also support the rollout of future renewable energy schemes. 

    As a corporatised offtaker, the company will be able to enter long-term power purchase agreements (PPAs) with private developers under a more bankable framework. Currently, these are negotiated by Ewa on a case-by-case basis.

    The government recently signed a 123MWp solar PPA with the UAE’s Yellow Door Energy, highlighting growing private sector interest in the market. The project includes the world’s largest single-site rooftop solar installation and will be developed at Foulath Holding’s industrial complex in Salman Industrial City.

    Bahrain has already set a target to source 20% of its energy from renewables by 2035 and reach net-zero emissions by 2060.

    In October, Ewa also issued a tender for the development of the Bilaj Al-Jazayer solar independent power project (IPP). The planned 100MW project will be developed on a build-own-operate basis with a 25-year contract term.

    In parallel, Bahrain is broadening its long-term energy strategy beyond solar. In July, the kingdom signed a cooperation agreement with the US on the peaceful use of nuclear energy, aimed at advancing research and potential deployment of small modular reactor (SMR) technology.

    For countries like Bahrain, which has limited land availability and high energy demand growth, SMRs could offer a way to produce low-carbon, reliable baseload power without requiring vast areas of land for solar or wind farms. 

    Officials have indicated that SMRs, along with floating solar solutions, are being studied as part of a broader push to diversify energy sources and expand renewable generation capacity.

    Water and waste

    Bids for four Ewa-owned projects are currently being evaluated. This includes the construction of a new SWRO desalination plant on Hawar Island and rehabilitation works for the Ras Abu Jarjur water treatment plant in Askar. Contracts for both projects are expected to be awarded this year.

    Bahrain’s Ministry of Works (MoW) is the other client for the island-state’s power and water infrastructure-related projects. It has awarded three smaller sewage-related contracts this year.

    It is also preparing to tender the construction of a $130m sewage treatment plant in Khalifa City, which will be developed in two phases. Meanwhile, the construction of MoW’s sewerage scheme phase 2 network in Bahrain remains in the early design stage with no further updates.

    As Bahrain moves ahead with these projects, the new electricity and water law could define how future investments are structured, regulated and financed. This could reshape the kingdom’s utilities landscape for decades to come.


    MEED's December special report on Bahrain also includes:

    > ECONOMY: Bahrain’s cautious economic evolution
    > BANKING: Mergers loom over Bahrain’s banking system
    > OIL & GAS: Bahrain remains in pursuit of hydrocarbon resources
    > CONSTRUCTION: Bahrain construction faces major slowdown
    > TRANSPORT: Bahrain signs game-changer aviation deal with Air Asia

    https://image.digitalinsightresearch.in/uploads/NewsArticle/15044915/main.gif
    Mark Dowdall
  • Masdar and OMV sign 140MW green hydrogen plant deal

    7 November 2025

    Register for MEED’s 14-day trial access 

    Abu Dhabi Future Energy Company (Masdar) has signed a binding agreement with Austrian energy company OMV to develop and operate a major green hydrogen production plant in Austria.

    The 140MW green hydrogen electrolyser plant will be Europe's fifth-largest hydrogen plant, according to Masdar chairman, Sultan Ahmed Al-Jaber.

    It will be built in Bruck an der Leitha, about 40 kilometres southeast of Vienna.

    The facility will be developed under a newly established joint venture, in which Masdar owns 49% and OMV holds the majority 51% stake.

    The agreement was signed at the Abu Dhabi International Petroleum Exhibition and Conference (Adipec), in the presence of Al-Jaber; Austria’s Federal Minister of Economy, Energy and Tourism, Wolfgang Hattmannsdorfer; OMV CEO Alfred Stern; and Masdar CEO Mohamed Jameel Al-Ramahi.

    It is expected that the project will reach financial close in early 2026, subject to final documentation, shareholder consent and regulatory approvals.

    Construction began in September, with operations scheduled to start in 2027.

    OMV, which already operates a 10MW electrolyser in Schwechat, will procure renewable electricity for hydrogen production and retain ownership of the output.

    Several large-scale hydrogen facilities across Europe are currently under construction.

    In 2024, Germany's Siemens Energy signed a deal with German utility EWE to build a 280MW green hydrogen electrolysis plant. This is expected to begin operations in 2027.

    Masdar and OMV previously signed a letter of intent to cooperate on green hydrogen, synthetic sustainable aviation fuels (e-SAF) and synthetic chemicals in both the UAE and central and northern Europe.


    READ THE NOVEMBER 2025 MEED BUSINESS REVIEW – click here to view PDF

    Mena players up the ante in global LNG production race; Investment takes UAE non-oil economy from strength to strength; Project finance activity draws international lenders back to market

    Distributed to senior decision-makers in the region and around the world, the November 2025 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/15040802/main0933.jpg
    Mark Dowdall
  • Firms submit Saudi customs warehouses PPP bids

    7 November 2025

     

    Three Saudi-based firms submitted bids on 29 September for a contract to build new customs warehouses in Saudi Arabia.

    The project is being tendered as a public-private partnership (PPP) on a design, build, finance, operate, maintain and transfer basis, with a contract duration of 15 years, including the construction period.

    The bidders include:

    • Al-Drees Petroleum & Transport Services Company
    • Lamar Holding
    • Mada International Holding

    The contract scope covers the development of 13 warehouses – including the design and construction of 12 new facilities and the renovation of one – across 13 different points of entry in the kingdom, along with the maintenance of all sites.

    The contract also includes the supply of equipment, as well as logistical support and cleaning services, for all new and existing warehouses at 38 points of entry across the kingdom.

    In January, the Zakat, Tax and Customs Authority (Zatca), through the National Centre for Privatisation and PPP (NCP), prequalified five companies to bid, MEED reported.

    The client issued the expressions of interest (EOI) and request for qualifications (RFQ) notices for the project in October last year.

    PPP plans

    In April 2023, Saudi Arabia announced a privatisation and public-private partnership (P&PPP) pipeline comprising 200 projects across 16 sectors.

    The P&PPP pipeline aims to attract both local and international investors and ensure their readiness to participate in the schemes tendered to the market.

    The initiative supports the kingdom’s efforts to enhance the attractiveness of its economy and increase the private sector’s contribution to GDP.


    READ THE NOVEMBER 2025 MEED BUSINESS REVIEW – click here to view PDF

    Mena players up the ante in global LNG production race; Investment takes UAE non-oil economy from strength to strength; Project finance activity draws international lenders back to market

    Distributed to senior decision-makers in the region and around the world, the November 2025 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/15040496/main.gif
    Yasir Iqbal
  • KBR selected for Iraq gas project

    7 November 2025

    Register for MEED’s 14-day trial access 

    US-based KBR has been selected by Turkiye’s Enka to provide detailed design services for its part of the broader $27bn Gas Growth Integrated Project (GGIP) masterplan.

    KBR was selected to provide the detailed design services after successfully completing the front-end engineering and design (feed) work for Enka’s central processing facility (CPF) package, according to a statement issued by the company.

    The wider GGIP project is being developed by France’s TotalEnergies along with its partners Basra Oil Company (BOC) and Qatar Energy.

    In September, Enka signed a contract to develop a CPF at Iraq’s Ratawi oil field as part of the second phase of the field’s development.

    Enka did not give a value for the contract, but it is believed to be worth more than $1bn.

    The contract covers engineering, procurement, supply, construction and commissioning (EPSCC) of the CPF for the project known as ‘Associated Gas Upstream Project Phase 2 (AGUP2)’.

    The aim of the AGUP2 project, due to start in 2028, is to process oil and associated gas from the Ratawi oil field to increase production capacity to 210,000 barrels a day of oil and 154 million standard cubic feet a day of gas.

    GGIP masterplan

    The GGIP programme is being led by TotalEnergies, which is the operator and holds a 45% stake.

    Basra Oil Company and QatarEnergy hold 30% and 25% stakes, respectively. The consortium formalised the investment agreement with the Iraqi government in September 2021.

    The four projects that comprise the GGIP are:

    • The Common Seawater Supply Project (CSSP)
    • The Ratawi gas processing complex
    • A 1GW solar power project for Iraq’s electricity ministry
    • A field development project at Ratawi, known as the Associated Gas Upstream Project (AGUP)

    The CSSP is designed to support oil production in Iraq’s southern oil and gas fields – mainly Zubair, Rumaila, Majnoon, West Qurna and Ratawi – by delivering treated seawater for injection, a method used to boost crude recovery rates and improve long-term reservoir performance.

    China Petroleum Engineering & Construction Corporation (CPECC) won a $1.61bn contract in May to execute EPC works to build the gas processing complex at the Ratawi field development.

    CPECC’s project team based in its office in Dubai is performing detailed engineering works on the project.

    In August last year, TotalEnergies awarded China Energy Engineering International Group the EPC contract for the 1GW solar project at the Ratawi field. A month later, QatarEnergy signed an agreement with TotalEnergies to acquire a 50% interest in the project.

    The 1GW Ratawi solar scheme will be developed in phases that will come online between 2025 and 2027. It will have the capacity to provide electricity to about 350,000 homes in Iraq’s Basra region.

    The project, consisting of 2 million bifacial solar panels mounted on single-axis trackers, will include the design, procurement, construction and commissioning of the photovoltaic power station site and 132kV booster station.

    Separately, in June, TotalEnergies awarded CPPE an EPC contract worth $294m to build a pipeline as part of a package known as the Ratawi Gas Midstream Pipeline.

    Also, TotalEnergies awarded UK-based consultant Wood Group a pair of engineering framework agreements in April, worth a combined $11m, under the GGIP scheme.

    The agreements have a three-year term under which Wood will support TotalEnergies in advancing the AGUP.

    One of the aims of the AGUP is to debottleneck and upgrade existing facilities to increase production capacity to 120,000 b/d of oil on completion of the first phase, according to a statement by Wood.


    READ THE NOVEMBER 2025 MEED BUSINESS REVIEW – click here to view PDF

    Mena players up the ante in global LNG production race; Investment takes UAE non-oil economy from strength to strength; Project finance activity draws international lenders back to market

    Distributed to senior decision-makers in the region and around the world, the November 2025 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/15040492/main.png
    Wil Crisp