Oman to tender Musandam airport
19 March 2025
Register for MEED’s 14-day trial access
The design works for the proposed Musandam airport development in Oman have been completed and tendering activity is expected to start shortly, according to an announcement made by the Governor of Musandam, Sayyid Ibrahim Bin Said Al-Busaidy, earlier this week.
In March last year, Oman’s Civil Aviation Authority (CAA) appointed Swiss engineering firm Renardet SA & Partners to prepare designs for the proposed development of Musandam airport in the northern peninsula of the country, which is separated from the rest of Oman by the UAE.
The airport is planned to be developed in two phases. The first phase involves the construction of a 2.5-kilometre-long and 45-metre-wide runway, a terminal building capable of handling 250,000 passengers annually, an air traffic control tower and other associated facilities.
A new 7 kilometre (km) road will also be constructed as part of the first phase.
The second phase includes the expansion of the runway to 3.3km and the expansion of the terminal building and associated facilities.
The timeline to implement the designs is 18 months, and the main construction work will take three years.
The implementation period for the second phase is 18 months. The airport is expected to be completed in 2028.
The estimated $250m Musandam airport project features two runways, an airstrip, a terminal, aircraft parking bays, service buildings, an air traffic control tower, cargo zones, taxiways and a service and hangar area suitable for Airbus 320 and Boeing 737 aircraft.
It also includes commercial and retail units, parking and associated facilities.
In 2020, Oman announced its National Aviation Strategy 2030, which aims to attract an investment of $3.6bn in airport cities over 20 years.
The country plans to expand its navigation infrastructure and open the sector to private international investors by granting concessions for managing and operating local airports and aviation-related services.
Oman's aviation sector has demonstrated positive growth and recovery, according to GlobalData.
A recent report by the National Centre for Statistics & Information shows that airports in Oman have witnessed a significant increase in inbound and outbound passenger numbers.
By November last year, Oman's airports had experienced a 3.1% increase in passenger traffic, with a total of 13.3 million passengers travelling on 98,933 flights, compared to 12.9 million passengers on 97,802 flights during the same period in 2023.
This data reflects the resilience and rebound of the aviation sector in Oman, indicating a recovery in travel and tourism activities that makes it necessary for the sultanate to invest in new airports.
Exclusive from Meed
-
Iraq awards Baghdad airport PPP deal29 October 2025
-
Saudi Electricity Company secures $3bn financing deal29 October 2025
-
Design work completed for $1bn Libyan pipeline29 October 2025
-
Qatari firm tenders Oman gabbro mining works29 October 2025
-
Kuwait forms project company for Al-Zour North expansion29 October 2025
All of this is only 1% of what MEED.com has to offer
Subscribe now and unlock all the 153,671 articles on MEED.com
- All the latest news, data, and market intelligence across MENA at your fingerprints
- First-hand updates and inside information on projects, clients and competitors that matter to you
- 20 years' archive of information, data, and news for you to access at your convenience
- Strategize to succeed and minimise risks with timely analysis of current and future market trends
Related Articles
-
Iraq awards Baghdad airport PPP deal29 October 2025
Register for MEED’s 14-day trial access
Iraq has awarded a contract to develop Baghdad International airport on a public-private partnership (PPP) basis to a consortium comprising Luxembourg-based Corporacion America Airports (CAAP) and local firm Amwaj International.
According to local media reports, the estimated $764m contract covers the rehabilitation of airport infrastructure, construction of a new passenger terminal, and operations and maintenance under a 25-year concession.
In a statement on its website, the Ministry of Transport said the airport’s initial capacity is expected to be around 9 million passengers, gradually increasing to 15 million.
Iraq’s Ministry of Transport and General Company for Airports & Air Navigation Services received the bids earlier this month, MEED reported.
The bidding consortium included:
- Asyad Holding / Top International Engineering Corporation / Lamar Holding / YDA Insaat / Dublin Airport Authority (Saudi Arabia/Saudi Arabia/Saudi Arabia/Turkiye/Ireland)
- Corporacion America Airports / Amwaj International (Luxembourg/Iraq)
- ERG International / Terminal Yapi / ERG Insaat (UK/Turkiye/Turkiye)
The media report added that the winning consortium offered the government 43.05% of total airport revenues.
The Asyad-led consortium offered 38.05%.
The ERG International-led consortium was disqualified from the bidding process.
The International Finance Corporation (IFC), a member of the World Bank Group, is the project’s lead transaction adviser.
https://image.digitalinsightresearch.in/uploads/NewsArticle/14971278/main.jpg -
Saudi Electricity Company secures $3bn financing deal29 October 2025
Saudi Electricity Company (SEC) has signed a $3bn financing agreement with a consortium of international banks at the Future Investment Initiative Forum (FII9) in Riyadh.
The financing comes as SEC continues to expand its project portfolio to meet rising electricity demand. In September, SEC outlined plans to invest SR220bn ($58.7bn) in power projects between 2025 and 2030.
This includes SR135bn ($36bn) and SR85bn ($22.7bn) for transmission and distribution, respectively, and is part of long-term plans to meet growing electricity demand while improving grid efficiency and reliability.
The financing partners include the UAE's Abu Dhabi Commercial Bank, Abu Dhabi Islamic Bank, Dubai Islamic Bank and Emirates NBD.
Also included are Bank of East Asia (Hong Kong), Bank of China, Barclays (UK), China Construction Bank, HSBC (UK), Industrial and Commercial Bank of China (China), ING (Netherlands) and Mega Bank (Taiwan)
The state-controlled utility, majority-owned by the Public Investment Fund (PIF), has dominated procurement activity in the power sector in 2025, awarding approximately $6bn-worth of contracts.
This has been led by two standalone projects in Dawadmi and Riyadh, each with a capacity of 500MW/2,000MWh and an estimated value of about $600m.
The utility continues to advance other major developments including the PP13 and PP14 combined-cycle gas turbine (CCGT) power plants in Riyadh. In October, it signed $3.4bn in offtake deals for the plants, which have a total capacity of 3,356MW.
It also recently reached financial close for Saudi Arabia’s Qurayyah CCGT independent power project (IPP) expansion.
SEC will develop, finance, build, own and operate the 3,010MW plant as part of a consortium with Saudi Arabia's Acwa Power and Hajj Abdullah Alireza & Company (Haaco).
Alongside its financing agreement, SEC launched a new Supply Chain Financing Programme during FII9 in partnership with local fintech Manafa and US-headquartered SAP Taulia, supported by the Saudi Industrial Development Fund.
The initiative aims to improve liquidity across the energy supply chain and enable suppliers to access fast financing at more competitive rates.
https://image.digitalinsightresearch.in/uploads/NewsArticle/14971266/main.jpg -
Design work completed for $1bn Libyan pipeline29 October 2025

Front-end engineering and design (feed) work has been completed for the major oil pipeline that will extend from oil fields in the south of Libya to the oil export terminal of Es Sider, according to industry sources.
Libya’s Waha Oil Company, a subsidiary of state-owned National Oil Corporation (NOC), is developing the pipeline.
The 700-kilometre pipeline will have a diameter of 32 inches and the capacity to transport 1 million barrels a day (b/d) of oil.
One source said: “It is crucial that the existing pipeline is replaced. The existing pipeline is suffering frequent leaks and cannot handle higher pressures.
“In 1960, when the pipeline was installed, the pipe thickness was 36mm, but it is now so worn out that this has been reduced to around 8mm across much of the pipeline. In some spots, it is even less than 8mm.
“Production cannot be increased at the oil field due to this ageing facility.”
Waha is preparing to eventually tender an engineering, procurement and construction (EPC) contract for the project, which is estimated to have a value of between $1bn and $1.25bn.
Although the pipeline’s actual usage is unlikely to exceed 300,000 b/d for some time after its completion, it is being designed to be ready for a significant increase in oil production from Libya’s southern oil fields.
It is unclear when Waha plans to issue an invitation to bid for the project’s EPC contract.
In 2012, Waha announced a project to replace key oil pipelines in Libya, but funding issues delayed the timeline and invitations to bid were never issued.
In January 2024, MEED reported that Waha was considering plans to boost its production by 1 million b/d.
At the time, the subsidiary was producing about 300,000 b/d.
Earlier this month, NOC announced that the country’s crude oil production had reached 1,383,430 barrels a day (b/d).
The company said that natural gas production was 2,519 million cubic feet a day (cf/d), while condensate production was 49,013 b/d.
NOC said it aimed to further increase production capacity to approximately 1.6 million cf/d by 2026.
https://image.digitalinsightresearch.in/uploads/NewsArticle/14970171/main.jpg -
Qatari firm tenders Oman gabbro mining works29 October 2025
Register for MEED’s 14-day trial access
Qatar Primary Materials Company (QPMC) has issued a tender for additional works at its gabbro mining development in the Khatmat Milaha area of Oman, close to a border crossing with the UAE.
The broad scope of work involves the remaining works for two gabbro quarries and the construction of an export jetty at Khatmat Milaha, state-owned QPMC, also known as Al-Awalia, said in the tender notice.
Firms have until 11 November to submit bids for the tender, QPMC said.
QPMC owns a 3 million tonne‑a‑year (t/y) gabbro quarry at Khatmat Milaha in Oman, which is understood to have been commissioned in 2020. The quarry has an expandable capacity of 7 million t/y.
The Omani quarry project had been planned for a number of years. In 2015, QPMC signed an agreement with Belgian firm Rent-A-Port to start work on the Khatmat Milaha quarry project.
Rent-A-Port was the consultant for QPMC’s gabbro port in Qatar. A joint venture of Denmark’s FLSmidth and Sixco completed the estimated QR1.6bn ($430m) contract to build the aggregate berths in 2017.
https://image.digitalinsightresearch.in/uploads/NewsArticle/14968152/main2817.jpg -
Kuwait forms project company for Al-Zour North expansion29 October 2025
Register for MEED’s 14-day trial access
Kuwait has formally established a new public shareholding company to manage the next stages of the Al-Zour North independent water and power plant (IWPP).
The Gulf Alliance for Power & Water Company will be responsible for the construction, implementation, management, operation and maintenance of Al-Zour North IWPP phases two and three.
The Al-Zour North phases two and three IWPP involves constructing a 2,700MW power plant and a 120-million-imperial-gallon-a-day desalination facility. The project’s total estimated value is approximately $4bn.
In August, Saudi Arabia’s Acwa Power and Kuwait-based financial institution Gulf Investment Corporation (GIC) signed a contract to develop the project, which will be the country’s largest IWPP.
The consortium of Acwa Power and GIC will hold 40% of the project company through Al-Zour Kuwaiti Second & Third Holding Company.
The Public-Private Partnership Authority will hold 10% on behalf of government entities, while 50% will be offered to Kuwaiti citizens through a public subscription process.
Al-Zour North IWPP phases two and three is owned by the Kuwait Authority for Partnership Projects (Kapp) and the Ministry of Electricity, Water & Renewable Energy.
It will be developed under a build-operate-transfer model with a 25-year offtake agreement.
Sepco3 is the EPC contractor for the project.
The project company has been set up with an authorised and issued capital of KD197.032m ($639m).
This capital is divided into 1.97 billion shares, each with a nominal value of 100 fils. The paid-up capital at the time of establishment is KD49.2m.
https://image.digitalinsightresearch.in/uploads/NewsArticle/14963914/main.jpg

