Egypt gas project activity collapses amid energy crisis

27 February 2025

 

The total value of active Egyptian gas projects has fallen by 79% despite a steep decline in domestic gas output that has ramped up the need for costly imports.

At the start of 2019, the total value of active gas projects in Egypt was $41.5bn. This has now sunk to $8.6bn, according to data from regional project tracker MEED Projects.

Despite the billions of dollars of investment that has been sunk into upstream projects in Egypt’s gas sector in recent years, production has been dropping after it peaked in 2021, according to the Energy Institute’s Statistical Review of World Energy.

In 2021, Egypt produced 67.8 billion cubic metres (bcm) of gas. This fell to 64.5 bcm in 2022 and 57.1 bcm in 2023.

In May 2024, Egypt’s domestic gas output hit a six-year low, down by about 25% from its 2021 peak.

Declining domestic production has led to a severe energy shortage in Egypt.

Last year, the North African country had to resort to load-shedding to keep its grid functioning amid a lack of gas supply and rising demand, while the deepening energy crisis strained Cairo’s budget as it grappled with a heavy subsidies bill.

In the past 12 months, Gulf countries have had to help Egypt finance liquefied natural gas (LNG) imports worth billions of dollars to try and ease the country’s crisis.

Egypt had planned to become a regional gas hub and a major exporter after Italy’s Eni discovered the Zohr offshore field in 2015.

When Zohr started production in 2017, Egypt’s oil and gas ministry said that the field would produce 2.7 billion cubic feet a day (bcf/d) until 2039, but after rising to a peak at 3.2 bcf/d in 2019 output fell to just 1.9 bcf/d in the first half of 2024.

Production outlook

The collapse in the total value of gas projects in Egypt does not bode well for future domestic gas production – and signals that the country may remain reliant on costly gas imports for some time to come.

In addition, many of Egypt’s biggest active gas projects remain at the study stage with significant uncertainty about when execution will start and new production will be brought online.

A total of $5.1bn of all of Egypt’s active gas projects are currently in the study stage, making up 60% of active gas projects in the country.

Meanwhile, 12% of active gas projects are at the bid evaluation stage and 27% are currently under execution.

Last year, the Egyptian Natural Gas Holding Company launched an international bid round for the exploration and exploitation of natural gas and crude oil across 12 blocks in the Mediterranean and Nile Delta, as part of an initiative to try to boost production.

The 12 blocks were comprised of 10 offshore blocks and two onshore blocks.

While this initiative is promising, it is expected that Egypt’s efforts to attract bidders could be held back by recent problems with prompt payments to international oil companies (IOCs).

The Egyptian General Petroleum Corporation (EGPC) has accrued arrears to IOCs, estimated at $4bn-$5bn. 

These debts have arisen due to a combination of foreign exchange shortages, as well as other structural issues, including declining domestic gas production, rising domestic consumption that limits gas export opportunities, and increased subsidies provided by EGPC to the electricity sector.

While gas project activity has plummeted since the start of 2019, oil project activity has seen a slight uptick, according to MEED Projects.

At the beginning of 2019, the total value of all active oil projects in Egypt was $15.2bn. As of 11 February 2024, this had risen by 15% to $17.6bn.

Economic issues are expected to hamper the development and execution of projects in the oil and gas sectors in 2025.  

Inflation is rising, the Egyptian pound is continuing to lose value and millions of Egyptians are grappling with a cost-of-living crisis.

Inflation stood at 24% in December 2024 and Egypt’s debt-to-GDP ratio remains high, at 89% for the 2023-24 fiscal year.

The low value of the Egyptian pound is likely to cause significant problems to those that want to execute large-scale projects in Egypt’s oil and gas sectors, as it is likely to increase the cost of importing raw materials and equipment.

In December, the European Commission announced a plan to disburse €1bn ($1.05bn) in loans to help Egypt cover part of its financing needs for the fiscal year 2024-25 and “ensure macroeconomic stability”.

Financial support has also been provided by the IMF, the World Bank and the UAE.

However, with Egypt’s perilous economic situation hampering project development and a failure to execute strategic projects constraining economic growth, it is possible that the North African country will be reliant on significant assistance from its foreign partners for energy imports for some time to come.


MEED’s March 2025 special report on Egypt includes:

> COMMENTEgypt battles structural issues
> GOVERNMENT: Egypt is in the eye of Trump’s Gaza storm
> ECONOMY: Egypt’s economy gets its mojo back
> OIL & GASEgypt gas project activity collapses amid energy crisis
> POWER & WATER: Egypt’s utility projects keep pace
> CONSTRUCTION: Coastal city scheme is a boon to Egypt construction

https://image.digitalinsightresearch.in/uploads/NewsArticle/13387757/main.gif
Wil Crisp
Related Articles
  • Three bids submitted for Riyadh-Qassim IWTP

    18 September 2025

     

    Register for MEED’s 14-day trial access 

    State water offtaker Saudi Water Partnership Company (SWPC) has received three bids from the private sector for the development of the Riyadh-Qassim independent water transmission pipeline (IWTP) project.

    The bids were submitted by two consortiums and one individual company.

    The first consortium comprises Saudi firms Al-Jomaih Energy & Water, Al-Khorayef Water & Power Technologies, AlBawani Capital and Buhur for Investment Company.

    The second consortium comprises Bahrain/Saudi Arabia-based Lamar Holding, the UAE's Etihad Water & Electricity and China’s Shaanxi Construction Installation Group.

    The third bid was submitted by Saudi Arabia's Vision Invest.

    In August, MEED exclusively reported that SWPC had extended the bid submission deadline again for a contract to develop and operate the project. 

    The deadline for bids was 17 September.

    The project will have a transmission capacity of 685,000 cubic metres a day. It will include a pipeline length of 859 kilometres (km) and a total storage capacity of 1.59 million cubic metres.

    The scheme is the third IWTP contract to be tendered by SWPC since 2022.   

    The first two are the 150km Rayis-Rabigh IWTP, which is under construction, and the 603km Jubail-Buraydah IWTP, the contract for which was awarded to a team of Riyadh-based companies comprising Al-Jomaih Energy & Water, Nesma Group and Buhur for Investment Company.

    Like the first two IWTPs, the Riyadh-Qassim IWTP project will be developed using a 35-year build-own-operate-transfer contracting model.

    Commercial operations are expected to commence in the first quarter of 2030.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14691078/main.jpg
    Mark Dowdall
  • Saudi Arabia seeks firms for six renewable projects

    17 September 2025

    Register for MEED’s 14-day trial access 

    Saudi Arabia's principal buyer, Saudi Power Procurement Company (SPPC), has invited interested companies to prequalify for the contracts to develop and operate solar photovoltaic (PV) and wind independent power producer (IPP) projects with a total combined capacity of 5,300MW.

    The following schemes comprise round seven of the kingdom's National Renewable Energy Programme (NREP):

    • 1,400MW Tabjal 2 solar PV IPP (Tabrijal, Al-Jouf Province)
    • 600MW Mawqqaq solar PV IPP (Mawqqaq, Hail Province)
    • 600MW Tathleeth solar PV IPP (Tathleeth, Aseer Province)
    • 500MW South Al-Ula solar PV IPP (Al-Ula, Medina Province)
    • 1,300MW Bilgah wind IPP (Bilgah, Medina Province)
    • 900MW Shagran wind IPP (Shagran, Medina Province)

    These projects are part of the NREP, which aims to achieve an optimal energy mix and supply 50% of the kingdom's electricity from renewable energy by 2030.

    Earlier rounds under the NREP have already put in place large capacities.

    Round six solicited around 4,500MW of solar and wind projects:

    • 1,500MW Dawadmi wind IPP  (Riyadh)
    • 1,400MW Najran solar PV IPP (Najran)
    • 600MW Samtah solar PV IPP (Jizan)
    • 600MW Al-Darb solar PV IPP (Jizan)
    • 400MW Al-Sufun solar PV IPP (Hail)

    In April, MEED reported that prequalified developers were forming teams to bid for the contracts to develop solar farms under the sixth round of the NREP.

    A separate set of bidders were prequalified for the 1,500MW Dawadmi wind farm, with contracts due to be awarded before the end of the year.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14684103/main3708.jpg
    Mark Dowdall
  • Qatar tenders Smaisma infrastructure contract

    17 September 2025

     

    Register for MEED’s 14-day trial access 

    Qatar’s Public Works Authority (Ashghal) has tendered a contract inviting construction firms to bid for the remaining works on roads and infrastructure in the small seaside town of Smaisma.

    The contract covers package two in the south area of Smaisma, located 52 kilometres (km) north of Hamad International airport.

    The scope of work includes the completion of the remaining works and remedial works on three zones. Each zone is further divided into three sub-zones.

    The scope also covers the remaining works on road C1017.

    The contract duration is two years from the start of construction works.

    The tender was floated on 15 September with a bid submission date of 28 October.

    The latest notice follows the tendering for the construction of roads and infrastructure in Wadi Al-Banat North (Zone 70).

    Market overview

    After 2019, there was a consistent year-on-year decline in contract awards in Qatar’s construction and transport sectors. The total value of awards in that year was $13.5bn, but by 2023 it had fallen to just over $1.2bn.

    In 2024, the value of project contract awards increased to $1.7bn, bucking the downward trend in the market in the preceding four years.

    Of last year’s figure, the construction sector accounted for contract awards of over $1.2bn, while transport contract awards were about $200m.

    There are strategic projects in the bidding phase in Qatar worth more than $5bn, and these are expected to provide renewed impetus to the construction and transportation market, presenting opportunities for contractors in the near term.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14682452/main.jpg
    Yasir Iqbal
  • Dragon Oil to boost exploration and production in Egypt

    17 September 2025

    Register for MEED’s 14-day trial access 

    Dubai-based Dragon Oil has signed a deal with the state-owned national oil company Egyptian General Petroleum Corporation (EGPC), agreeing to increase exploration and production activities in the Gulf of Suez.

    Under the terms of the agreement, Dragon Oil will make investments worth about $30m.

    This will fund activities including a programme to drill at least two new wells in the East El-Hamd area.

    Abdulkarim Ahmed Al-Mazmi, the acting chief executive of Dragon Oil, said: “The signing of this agreement reaffirms Dragon Oil’s commitment to strengthening its strategic presence in the Arab Republic of Egypt and supporting EGPC’s efforts to develop energy resources in the Gulf of Suez region, in line with the company’s vision for growth and sustainability.”

    Dragon Oil is wholly owned by Emirates National Oil Company, which is fully owned by the Government of Dubai.

    Al-Mamzi said that the new investments are part of Dragon Oil’s broader strategy to expand in regional markets and to strengthen its position in the oil and gas sector, in line with the directions of the government of the UAE, and in particular the Government of Dubai.

    The agreement was signed at the EGPC headquarters in Cairo.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14680456/main.png
    Wil Crisp
  • Construction launched for final major projects of Iraq’s GGIP

    17 September 2025

    Register for MEED’s 14-day trial access 

    Officials have announced the start of construction on Iraq’s Common Seawater Supply Project (CSSP) and the full field development of the Ratawi oil field, which is also known as the Artarwi field.

    The two projects are the two last major contracts of the Gas Growth Integrated Project (GGIP).

    The GGIP is led by France’s TotalEnergies, which is the operator and has a 45% stake in the project.

    Its partners are Iraq’s state-owned Basra Oil Company, which has a 30% stake, and QatarEnergy, which has a 25% stake.

    An event in Baghdad to mark the launch of the two projects was attended by senior officials including Patrick Pouyanne, the chairman and chief executive of TotalEnergies; and Saad Sherida Al-Kaabi, who is Qatar’s Minister of State for Energy Affairs, as well as the president and chief executive of QatarEnergy.

    In a statement, TotalEnergies said: “All four parts (natural gas, solar, oil, water) of the GGIP are now in the execution phase.”

    The CSSP will be built on Iraq's coast, near the town of Um Qasr. It will process and transport 5 million barrels a day (b/d) of seawater to the main oil fields in southern Iraq.

    Treated seawater will be substituted for the freshwater currently taken from the Tigris, Euphrates and aquifers to maintain pressure in the oil wells.

    The project is expected to help alleviate water stress in the region and free up to 250,000 cubic metres of freshwater a day for irrigation and local agriculture needs, according to TotalEnergies.

    The Ratawi redevelopment was launched in September 2023. Phase one aims to increase production to 120,000 b/d of oil and is expected to come on stream by early 2026.

    The launch of phase two, the full field development, will enable production to be increased to 210,000 b/d starting in 2028, with no routine flaring, according to TotalEnergies.

    In a statement, it said that all 160,000 cubic feet a day (cf/d) of associated gas produced will be fully processed by the 300,000 cf/d Gas Midstream Project (GMP), the construction of which began in early 2025.

    The GMP, which will also treat previously flared gas from two other fields in southern Iraq, will deliver processed gas into the national grid, where it will fuel power plants with a production capacity of approximately 1.5GW, providing electricity to 1.5 million Iraqi households.

    An early production facility to process 50,000 cf/d of associated gas will start in early 2026, together with the Ratawi phase one oil production.

    Pouyanne said: “We are delighted today to award the two final contracts of the GGIP, in particular the seawater treatment plant, which has been long awaited by the oil industry in Iraq.

    “In less than two years since the GGIP effective date in August 2023, TotalEnergies and its partners have fully executed their commitment towards the people of Iraq and launched all projects included in the multi-energy GGIP project, the best showcase of TotalEnergies' transition strategy.

    “All these projects will bring a significant contribution to the Iraq economy and employ during the construction phase 7,000 Iraqi nationals.

    “Furthermore, I am proud to confirm that the first phase of the associated gas, oil and solar projects will start up as soon as early 2026.”

    Turkiye’s Enka has signed a contract to develop a central processing facility at the Ratawi oil field as part of the second phase of the field’s development.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/14680455/main.png
    Wil Crisp