Mass Group and GE Vernova ink Bismaya plant upgrade
15 October 2024
Jordan's Mass Group Holding and US-headquartered GE Vernova have signed an eight-year services agreement to support the third phase of Iraq's Bismaya independent power producer (IPP) project.
Phase 3 of the Bismaya IPP is equipped with four GE Vernova 9F gas turbines.
According to an official statement, the Phase 3 service agreement was contracted in the second quarter of 2024 and builds on prior operations and maintenance (O&M) and long-term service agreements GE Vernova secured for Phase 1 and Phase 2 of the project.
The announcement of the new contract coincided with the completion of the upgrade of the project's Phase 1, which entails four 9F.04 gas turbines, as well as the start of upgrades for an additional four 9F.04 gas turbines in Phase 2.
The comprehensive upgrade works is also known as advanced gas path (AGP).
According to GE Vernova, the Phase 1 AGP upgrades enhance the plant's performance and operational flexibility, "enhancing efficiency and availability, as well as output by up to 6%, while improving the efficiency of fuel consumption and extending the lifespan of assets".
With the completion of Phase 2 expected in the first quarter of 2025, the eight 9F turbines are expected to reduce carbon dioxide (CO2) emissions by up to 477,000 metric tonnes annually for the same level of power production, the company said.
The phase 1 upgrades at the plant also marked the first live outage in Iraq, a new digital approach that "improves the field execution experience for our teams and our customers", according to Steve Kessinger, vice president and CEO, GE Vernova’s Gas Power Global Services.
Mass Group Holding owns and operates three other power plants in Iraqi Kurdistan that are equipped with GE's gas turbines. They are located in Erbil, Sulaymaniyah and Dohuk.
The four power plants have a total combined capacity of approximately 9,000MW.
Bismaya IPP
In June 2020, GE completed O&M works on four 9F.03 gas turbines, two steam turbines and six generators at the Bismaya power plant.
Iraq’s electricity minister signed a contract with Mass Group Holding and GE to develop the third phase of the Bismaya IPP in September 2019.
The third phase increased the capacity of the plant by 1.5GW, bringing the total capacity of the plant to 4.5GW. Mass Group Holding will develop the plant under a 20-year power purchase agreement (PPA) with the Electricity Ministry.
The Bismaya IPP forms part of Iraq’s programme to develop fast-track electricity capacity, with many areas of the country suffering from power shortages, especially during the summer months.
Exclusive from Meed
-
-
-
Kuwait tenders upstream oil project12 May 2026
-
-
All of this is only 1% of what MEED.com has to offer
Subscribe now and unlock all the 153,671 articles on MEED.com
- All the latest news, data, and market intelligence across MENA at your fingerprints
- First-hand updates and inside information on projects, clients and competitors that matter to you
- 20 years' archive of information, data, and news for you to access at your convenience
- Strategize to succeed and minimise risks with timely analysis of current and future market trends
Related Articles
-
Abu Dhabi announces $15bn infrastructure PPP projects12 May 2026
The Abu Dhabi Investment Office and the Abu Dhabi Projects and Infrastructure Centre have launched a AED55bn ($15bn) public-private partnership (PPP) pipeline of 24 projects to be tendered in 2026 and 2027.
The projects will be tendered across the transport, infrastructure and social sectors.
According to a statement published by the Abu Dhabi Media Office, the transport sector accounts for 11 road projects, with AED35bn ($9.5bn) of construction capex, covering more than 300 kilometres of new and upgraded roads, tunnels, intersections and related network works.
The infrastructure pipeline includes five projects budgeted at AED11bn ($3bn), covering dams, water storage, flood control, stormwater upgrades and urban landscaping.
Social infrastructure includes eight projects budgeted at AED9bn ($2.5bn), covering sports facilities, specialist healthcare assets, schools and university campuses.
The statement added that the pipeline forms part of Abu Dhabi’s infrastructure delivery plan and will be executed through PPP structures.
It is also intended to support company establishment in the emirate, local content objectives, and supply-chain and industrial capacity.
.@InvestAbuDhabi and @ADPIC_ae have launched a AED55 billion public-private partnership pipeline, marking the next phase of Abu Dhabi’s long-term infrastructure delivery strategy, ahead of preparations to host Abu Dhabi Infrastructure Summit 2026. pic.twitter.com/a8U1LWURSz
— مكتب أبوظبي الإعلامي (@ADMediaOffice) May 11, 2026
https://image.digitalinsightresearch.in/uploads/NewsArticle/16793904/main.jpg -
Saudi Arabia tenders GCC rail link from Kuwait to UAE border12 May 2026

Saudi Arabia has begun the procurement process to deliver its portion of the GCC railway, which will connect all six member states.
Saudi Arabia Railways (SAR) issued a tender for design consultancy services for the project on 7 May.
The kingdom’s section of the railway will start at Al-Khafji in the Eastern Province, near the border with Kuwait, and end at Al-Batha, at Saudi Arabia’s border with the UAE. The route length in Saudi Arabia will be about 672 kilometres (km).
The railway will interface with the Kuwait National Rail Road (KNRR) project on the Kuwaiti side. Last year, MEED exclusively reported that the KNRR design contract was awarded to Türkiye’s Proyapi Muhendislik ve Musavirlik Anonim Sirketi.
The KNRR forms part of the wider GCC rail network. GCC railway projects have been progressing with renewed impetus since the six member states signed the Al-Ula Declaration in January 2021.
In October last year, the Qatari cabinet approved a draft agreement paving the way for a railway link between Qatar and Saudi Arabia as part of the GCC railway network.
GCC railway line
Under the overall plan, the railway will span 2,186 kilometres, beginning in Kuwait, passing through Dammam in Saudi Arabia, reaching Bahrain via a planned causeway, and continuing from Dammam to Qatar, the UAE and, ultimately, Muscat via Sohar in Oman.
The network’s route length within each member state is as follows: 684km in the UAE, 672km in Saudi Arabia, 306km in Oman, 283km in Qatar, 145km in Kuwait and 36km in Bahrain.
The railway is designed for passenger trains travelling at 220 kilometres an hour (km/h) and freight trains operating at 80-120km/h.
With high levels of project activity, governments in spending mode and renewed cooperation under the Al-Ula Declaration, the latest efforts to restart the GCC railway project may make more progress than previous attempts. If completed, the railway could prove transformational for a region that is globally connected but divided between its constituent parts.
> Be recognised among the best in the industry at the MEED Projects Awards 2026 …
https://image.digitalinsightresearch.in/uploads/NewsArticle/16793841/main.jpg -
Kuwait tenders upstream oil project12 May 2026
State-owned upstream operator Kuwait Oil Company (KOC) has tendered a contract to develop power infrastructure to provide electricity to the country’s Bahra oil field.
The project focuses on constructing an 11kV, 72MW main intake in the Bahra-A area.
It also includes the development of 11kV, 20MW substations in the Bahra-A2 area, and the conversion of a substation in the Bahra-A1 area in northern Kuwait.
An initial meeting for the project is scheduled for 7 June, and bids are due by 9 August.
Kuwait’s oil and gas sector has been severely impacted by the blockade of the Strait of Hormuz, through which all of its crude exports are normally shipped.
The country recorded zero crude oil exports in April for the first time since the end of the Gulf War in 1991, according to shipping monitor TankerTrackers.com.
READ THE MAY 2026 MEED BUSINESS REVIEW – click here to view PDFGlobal energy sector forced to recalibrate; Conflict hits debt issuance and listings activity; UAE’s non-oil sector faces unclear recovery period amid disruption.
Distributed to senior decision-makers in the region and around the world, the May 2026 edition of MEED Business Review includes:
> REGIONAL LNG: War undermines business case for Middle East LNG> CAPITAL MARKETS: Damage avoidance frames debt issuance> MARKET FOCUS: Conflict tests UAE diversificationTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/16792080/main.png -
Chinese company signs deal to develop Syria cement plant12 May 2026
China’s Jiangsu Pengfei Group has signed a deal with Damascus-based Al-Hasan Holding Group (HHG) to develop a cement plant in Syria’s Raqa governorate.
The “strategic agreement” was signed on 29 April, according to a statement from HHG.
The clinker production line will have a capacity of 5,000 tonnes a day (t/d).
Syria is seeking to expand cement production capacity to meet demand from the domestic construction sector.
HHG is an integrated investment conglomerate headquartered in Damascus with a portfolio of companies across sectors including industry, trade, energy, construction, tourism and services.
It was founded by the Syrian businessman Hassan Kamel Al-Hasan.
Jiangsu Pengfei Group is a manufacturer of rotary kiln and grinding equipment.
The company is involved in the design, manufacture and service of equipment in the fields of building materials, metallurgy and the chemical industry.
It is also an engineering, procurement and construction service provider that has completed more than 100 cement production line projects.
READ THE MAY 2026 MEED BUSINESS REVIEW – click here to view PDFGlobal energy sector forced to recalibrate; Conflict hits debt issuance and listings activity; UAE’s non-oil sector faces unclear recovery period amid disruption.
Distributed to senior decision-makers in the region and around the world, the May 2026 edition of MEED Business Review includes:
> REGIONAL LNG: War undermines business case for Middle East LNG> CAPITAL MARKETS: Damage avoidance frames debt issuance> MARKET FOCUS: Conflict tests UAE diversificationTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/16792079/main.jpg -
Libya’s national oil company takes control of key refinery12 May 2026
Libya’s state-owned National Oil Corporation (NOC) has signed an agreement to take full control of the country’s Ras Lanuf refinery.
The agreement marks the end of a decade-long dispute with UAE-based Trasta Energy.
NOC has signed a final agreement with Trasta to end their partnership in the Libyan Emirates Oil Refining Company (Lerco), giving the NOC full ownership of the Ras Lanuf refinery and petrochemical complex, according to a statement.
In its statement, NOC said the deal was one of the most important developments in Libya’s oil sector since the 2011 uprising and closed one of the industry’s most complex disputes.
NOC also said that the deal has paved the way for a new phase of rehabilitation, operation and development.
Some analysts have linked tensions in the partnership to political divisions in Libya and the UAE’s support for eastern military commander Khalifa Haftar.
Lerco was established as a joint venture to operate and develop the Ras Lanuf complex, but operations were disrupted after Libya’s civil war, which started in 2011 and overthrew Muammar Gaddafi.
The Ras Lanuf complex is located about 600 kilometres east of Tripoli on Libya’s northeastern coast and has the capacity to refine about 220,000 barrels of oil a day (b/d), which would make it the country’s largest if it comes online.
It includes a refinery, storage facilities, export terminals and petrochemical units.
Under the agreement, all of Trasta’s shares will be transferred to the NOC, allowing the complex to operate under full Libyan management.
Political instability and security problems have led to repeated problems in Libya’s downstream sector over the past decade.
On 10 May, it was announced that the Zawiya refinery, which is the country’s largest functioning oil refinery, and the nearby oil port were resuming operations after military clashes forced the refinery to shut down for two days.
Azzawiya Oil Refining Company, which operates the facility, said it had decided to lift the state of emergency, allowing work to resume at the site.
READ THE MAY 2026 MEED BUSINESS REVIEW – click here to view PDFGlobal energy sector forced to recalibrate; Conflict hits debt issuance and listings activity; UAE’s non-oil sector faces unclear recovery period amid disruption.
Distributed to senior decision-makers in the region and around the world, the May 2026 edition of MEED Business Review includes:
> REGIONAL LNG: War undermines business case for Middle East LNG> CAPITAL MARKETS: Damage avoidance frames debt issuance> MARKET FOCUS: Conflict tests UAE diversificationTo see previous issues of MEED Business Review, please click herehttps://image.digitalinsightresearch.in/uploads/NewsArticle/16792076/main.jpg

