Fertiglobe wins $431m green ammonia supply bid

12 July 2024

Abu Dhabi-listed Fertiglobe won the first tender by H2Global to supply green hydrogen-derived ammonia from Egypt to the European Union.

Fertiglobe is the sole winner of the first trio of tenders in the first auction round, which was funded entirely by the German government.

Fertiglobe will receive €391m ($431m) for its proposal and secured a green ammonia offtake deal with H2Global affiliate Hydrogen Intermediary Network Company (Hintco).

Fertiglobe and Egypt Green Hydrogen, the project company led by Norway's Scatec that is developing an integrated green hydrogen and ammonia project in the North African country, announced signing a 20-year ammonia offtake agreement on 11 July.

The Egypt Green Hydrogen project was first announced in 2021.

Scatec, Fertiglobe and the local Orascom Construction are developing the project in partnership with The Sovereign Fund of Egypt and the Egyptian Electricity Transmission Company.

At the time, Scatec and its partners agreed to develop, build, own, and operate a 100MW electrolyser facility to produce renewable hydrogen to be used as feedstock for the production of renewable ammonia at Fertiglobe’s existing ammonia plant in Ain Sokhna, Egypt.

Scatec said the project will be powered by about 270MW of solar and wind power capacity and deliver approximately 13,000 tonnes of renewable hydrogen and up to 74,000 tonnes of renewable ammonia annually.

It said the next important milestones for the project are to select the electrolyser supplier and complete the project financing process.

The European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB), Germany’s development finance institution and KfW subsidiary DEG, British International Investment (BII), and US International Development Finance Corporation (DFC) are providing competitive financing to support the project.

The partners expect to reach financial close in the first half of 2025.

Scatec is the lead developer and majority sponsor of Egypt Green Hydrogen with an ownership share of 52%. It will also provide engineering, procurement and construction services in collaboration with Orascom Construction.

Scatec will also provide operation and maintenance and asset management services for the project alongside key technology providers and project partners, the company said.

Related reads:

Photo credit: Scatec

https://image.digitalinsightresearch.in/uploads/NewsArticle/12104236/main.jpg
Jennifer Aguinaldo
Related Articles
  • Chinese firm wins Ceer automotive supplier park deal

    6 February 2026

     

    Beijing-headquartered Metallurgical Construction Corporation (MCC) has won a contract to undertake the steel structure works on the Ceer automotive supplier park in King Abdullah Economic City (KAEC).

    The supplier park is located next to Ceer’s electric vehicle (EV) production facility in KAEC.

    The automotive supplier park will include production and ancillary facilities for various suppliers and provide the material supply infrastructure for Ceer’s EV plant.

    The facilities include:

    • Cold stamping, body-in-white assembly and stamping facility – Shin Young (South Korea)
    • Hot stamping, sub-frames and axles subsystem supply facility – Benteler Group (Austria)
    • Façade and exterior-trim supply facility – JVIS (US)
    • Instrument panel, trims and console supply facility – Forvia (France)
    • Seat supplier – Lear Corporation (US)

    Earlier this week, MEED exclusively reported that Ceer had awarded a contract to build the automotive supplier park to Jeddah-based construction firm Modern Building Leaders (MBL).

    Netherlands-based engineering firm Arcadis is the project consultant, and Pac Project Advisors is the project management consultant.

    Ceer retendered the project in September last year.

    The latest contract award is another significant contract win for MCC in Saudi Arabia. In January, MEED reported that MCC had won a contract to undertake the steel structure works on Mohammed Bin Salman Stadium at the Qiddiya City project on the outskirts of Riyadh.

    The 45,000-seat stadium will feature a fully combined retractable pitch, roof and LED wall.

    The stadium’s main construction works are being undertaken by a joint venture of Spanish firm FCC Construction and local firm Nesma & Partners.

    In January, MCC won another contract to undertake steel structure works for the expansion of Medina airport in Saudi Arabia.

    The scope covers work on boarding bridges, Terminal Two and the renovation of Terminal One.


    READ THE FEBRUARY 2026 MEED BUSINESS REVIEW – click here to view PDF

    Spending on oil and gas production surges; Doha’s efforts support extraordinary growth in 2026; Water sector regains momentum in 2025.

    Distributed to senior decision-makers in the region and around the world, the February 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/15592955/main.gif
    Yasir Iqbal
  • Dubai Municipality tenders water pipeline projects

    5 February 2026

     

    Dubai Municipality has opened bidding for four separate engineering, procurement and construction (EPC) contracts to expand and rehabilitate the emirate’s recycled water and sewerage networks.

    MEED understands that the largest project is the upgrade of old recycled water pipes – phase 1 (RW108-C1) project.

    The contract involves replacing approximately 45 kilometres of asbestos cement pipelines along Jumeirah Beach Road, Sheikh Zayed Road and in Deira.

    The package requires a tender bond of AED1m and the bid submission deadline is 26 February.

    The remaining tenders include:

    Package two: Network for Dubai-Al Ain Road, Bukhedra-Sheikh Zayed (IN103-C1 RW), covering the construction of approximately 33 kilometres of new recycled water pipelines, including lines serving Al-Nakheel communities, connections from the Warsan sewage treatment plant, and works near several major interchanges.

    Package three: Main recycled water network for Sheikh Zayed Road Interchange 7 to 4 (IN107-C1), involving upgrades about 18.2 kilometres in length of existing mains along Sheikh Zayed Road.

    Package four: Execution of remaining works for the Jebel Ali industrial sewerage and drainage system (DS188-C2), focusing on completion, rehabilitation and rectification of earlier works to meet municipal standards.

    A request for proposals (RFP) has been issued for all four contracts. The bid submission deadline for contracts two, three and four is 19 February.

    It is understood that the recycled water packages (one, two and three) require microtunnelling and horizontal directional drilling, construction of launch and reception shafts, dewatering and protection of existing services.

    Contractors will also be responsible for traffic diversions, reinstatement works and testing of completed networks. 

    Dubai Municipality said bidders are required to submit qualification, technical and commercial proposals for all four contracts.

    Packages two, three and four require tender bonds of AED800,000, AED500,000 and AED50,000, respectively.


    READ THE FEBRUARY 2026 MEED BUSINESS REVIEW – click here to view PDF

    Spending on oil and gas production surges; Doha’s efforts support extraordinary growth in 2026; Water sector regains momentum in 2025.

    Distributed to senior decision-makers in the region and around the world, the February 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/15585433/main.jpg
    Mark Dowdall
  • Aramco defers bid submissions for Safaniya onshore project

    5 February 2026

     

    Saudi Aramco has postponed the bid submission deadline for a project to construct onshore surface facilities to boost productivity at the Safaniya offshore oil field development in Saudi Arabia.

    The Safaniya field is the world’s largest offshore oil field, with a production capacity of nearly 1.2 million barrels a day (b/d). Discovered in 1951, the field is located in the Gulf waters, approximately 265 kilometres north of Aramco’s headquarters in Dhahran.

    Aramco has pushed back the bid submission deadline for the Safaniya onshore surface facilities project until 17 March, according to sources. The earlier bid submission date was 31 January.

    Aramco issued the main tender for engineering, procurement and construction (EPC) works on the Safaniya onshore surface facilities project on 9 July last year. Contractors were initially given deadlines of 24 October and 7 November to submit technical and commercial bids for the project, MEED previously reported.

    Prior to that, Aramco is understood to have issued the solicitation of interest document for the Safaniya field onshore surface facilities project in May, with contractors submitting responses by 28 May.

    The EPC scope of work has been divided into two packages:

    • Package 1 – Water treatment and injection plant:
      • Building new water injection units
      • Expansion of gas-oil separation plant one
      • Building storage tanks, transfer pumps and substation
      • A central processing facility at the Zuluf field development, including water transfer pumps, chemical injection skids and other components
         
    • Package 2 – Produced water utilities:
      • Fire water system
      • Potable water units
      • Utilities
      • Nitrogen generation system
      • Site buildings
      • Electrical infrastructure
      • Security systems
      • Telecommunications networks

    In addition to pursuing the onshore facilities project to boost Safaniya’s productivity, MEED also previously reported about Aramco issuing three key offshore tenders last year for the field’s next expansion phase.

    Contractors in Aramco’s Long-Term Agreement pool of offshore service providers submitted bids for the three tenders – Contracts Release and Purchase Order (CRPO) numbers 154, 155 and 156 – by 31 August. Aramco is evaluating bids for the three tenders and is expected to award contracts within the first quarter.

    ALSO READ: Aramco to finalise long-term agreements with engineering firms
    https://image.digitalinsightresearch.in/uploads/NewsArticle/15582695/main5945.jpeg
    Indrajit Sen
  • Etihad Rail awards multibillion-dollar high-speed rail contracts

    5 February 2026

     

    Register for MEED’s 14-day trial access 

    The UAE’s Etihad Rail has awarded multibillion-dollar design-and-build contracts for the civil works and station packages of the high-speed railway (HSR) line connecting Abu Dhabi and Dubai.

    The contract for the construction of the Abu Dhabi side of the railway was awarded to a consortium comprising Abu Dhabi's National Projects Construction (NPC), Trojan Tunnelling, Turkiye's Kalyon and Beijing-headquartered China State Construction Engineering Corporation.

    The other deal, comprising the construction of the Dubai side of the railway, was awarded to a consortium of India's Larsen & Toubro, Beijing-based China Harbour Engineering Company and local firm Wade Adams.

    MEED understands that the whole scheme is worth $8bn-plus.

    US-based Jacobs is the designer for the NPC group.

    French engineering firm Egis and Singapore’s Surbana Jurong are the designers for the L&T-led consortium.

    Last month, MEED exclusively reported that Etihad Rail was preparing to award the contracts for the HSR.

    The design speed of trains running on the UAE’s HSR network will be 350 kilometres an hour (km/h), and the operating speed will be 320km/h.

    The proposed HSR programme will be constructed in four phases, gradually adding further connectivity to other areas within the UAE.

    The first phase involves constructing a railway line connecting Abu Dhabi and Dubai, which is expected to be operational by 2030.

    The second phase will develop an inner‑city railway network with 10 stations within the city of Abu Dhabi.

    The third phase of the railway network involves constructing a connection between Abu Dhabi and Al-Ain.

    The fourth phase involves developing an inter-emirate connection between Dubai and Sharjah.

    The 150km first phase of the HSR will stretch from the Al-Zahiyah area of Abu Dhabi to Al-Jaddaf in Dubai.

    The project’s civil works have been split into two packages – Abu Dhabi and Dubai – comprising four sections. The scope of these sections includes:

    • Phase 1A: Al-Zahiyah to Yas Island (23.5km) 
    • Phase 1B: Yas Island to the border of Abu Dhabi/Dubai (64.2km)
    • Phase 1C: Abu Dhabi/Dubai border to Al-Jaddaf (52.1km)
    • Phase 1D: Abu Dhabi airport delta junction and connection with Abu Dhabi airport station (9.2km)

    The rail line will have five stations: Al-Zahiyah (ADT), Saadiyat Island (ADS), Yas Island (YAS), Abu Dhabi International airport (AUH) and Al-Jaddaf (DJD).

    The ADT, AUH and DJD stations will be underground, while ADS will be elevated and YAS will be at grade.

    The overall construction package also includes provisions for rolling stock, railway systems and two maintenance depots.

    The high-speed project will slash journey times between the UAE’s two largest cities and economic centres. The journey time between the YAS and DJD stations will be 30 minutes.

    Spanish engineering firms Sener and Ineco are the project’s engineering consultants.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/15578874/main.jpg
    Yasir Iqbal
  • Aldar announces $18bn UAE contract awards in 2025

    4 February 2026

    Abu Dhabi-based real estate developer Aldar Properties has announced the award of construction contracts totalling over AED66bn ($18bn) in 2025.

    These awards span a diverse portfolio of residential, commercial, infrastructure and logistics projects across the UAE. 

    The newly awarded contracts cover large-scale residential communities, strategic infrastructure, and Grade A commercial and logistics assets across key growth locations nationwide.

    Collectively, the projects will deliver thousands of new homes, modern commercial and logistics facilities, and critical infrastructure that respond to evolving market demand and advance sustainable urban development.

    In Abu Dhabi, contracts were awarded across a range of projects for Aldar and the local government. On Saadiyat Island, local contractor Fibrex Construction was appointed for Mamsha Gardens and Nobu Residences, while Dubai-based Dutco Construction Company was awarded the main contract for The Arthouse.

    On Fahid Island, Indian firm Shapoorji Pallonji was awarded the main contract for Fahid Beach Residences.

    Beijing-headquartered China State Construction Engineering Corporation and Abu Dhabi’s Western Bainoona Group, Nael & Bin Harmal Hydroexpert, Yas Projects, Said Bin Darwish and Noor Al-Sahara General Contracting were also awarded contracts across a number of national housing and infrastructure projects during 2025.

    In Dubai, Aldar continued to deliver across major residential and logistics developments. Sharjah-based Ginco General Contracting was contracted to develop villas and townhouses at Athlon.

    Turkish firm Nurol was awarded the main works package for Verdes by Haven.

    Kuwait’s Mohammed Abdulmohsin Al-Kharafi & Sons was awarded the villas package for The Wilds, and local firm Al-Nasr Contracting Company was awarded the infrastructure works.

    In the industrial and logistics segment, Dubai-based Group Amana was awarded the development of Aldar Logistics Centres at National Industries Park.

    In Ras Al-Khaimah, Shapoorji Pallonji was awarded contracts for the Al-Marjan Beachfront development.

    Aldar said in a statement: “In line with the UAE’s National In-Country Value (ICV) programme, almost 45% of the total value of projects awarded in 2025 is expected to be recirculated into the local economy, supporting economic diversification, industrial development and job creation across the UAE.

    “Aldar continues to embed ICV principles across its procurement processes by prioritising UAE-based contractors and suppliers and supporting the growth of domestic capabilities across the construction value chain,” the statement added.


    READ THE FEBRUARY 2026 MEED BUSINESS REVIEW – click here to view PDF

    Spending on oil and gas production surges; Doha’s efforts support extraordinary growth in 2026; Water sector regains momentum in 2025.

    Distributed to senior decision-makers in the region and around the world, the February 2026 edition of MEED Business Review includes:

    To see previous issues of MEED Business Review, please click here
    https://image.digitalinsightresearch.in/uploads/NewsArticle/15568462/main.jpg
    Yasir Iqbal