Region plays high-stakes AI game

11 June 2024

This package also includes: Data centres meet upbeat growth


Artificial intelligence (AI) is a potential enabler for the economic diversification programmes of the GCC’s hydrocarbons-exporting states. 

The UAE launched an open-source large-language model (LLM) last year. Falcon 40B, shortly followed by Falcon 180B, cemented the reputation of the Abu Dhabi government-funded Technology Innovation Institute as a major player in generative AI.

With 180 billion parameters and trained on 3.5 trillion tokens, Falcon 180B soared to the top of the Hugging Face Leaderboard, a benchmark for pre-trained LLMs. Falcon 180B outperformed competitors such as Meta’s Llama 2 in areas including reasoning, coding, proficiency and knowledge tests.

The launch of Falcon followed cumulative investments in research, talent acquisition and digital infrastructure. In recent years, Abu Dhabi has formed government-attached agencies and commercial entities backed by its sovereign wealth funds to focus on AI.

One such company is G42, which has partnered with the US’ OpenAI to develop sector-focused generative AI models, and with Microsoft to run applications on Azure and undertake AI skilling initiatives in the UAE and beyond.

Global AI hubs

The UAE aims to become a world-leading AI hub alongside the US and China, but the country will have to tread carefully when choosing partners to avoid geopolitical complications involving its most important security ally and its largest energy client.

Riyadh seems determined to give Abu Dhabi a run for its AI money. The GCC region’s two largest states have placed
separate multimillion-dollar orders for graphics processing units – powerful chips designed for training AI – from top US supplier Nvidia.

They have also formed AI-focused investment vehicles with a view to maximising investments and returns from AI ventures at home and abroad. Abu Dhabi formed MGX, which aims to build $100bn in assets under management within a few years, while Saudi Arabia’s Public Investment Fund formed a $100bn platform to transform the kingdom into a semiconductor and electronics hub, with AI playing a central role in the plan.

In May this year, the Saudi Data & Artificial Intelligence Authority and New York-based technology company IBM launched an open-source Arabic LLM called Allam on IBM’s Watsonx AI and data platform.

With AI promising to be a $1tn market by 2030, it offers attractive opportunities

Computer power

A potential issue facing the determined push for AI leadership is that AI requires enormous computational power and energy, in addition to vast capital and talent.

A recent article published by the World Economic Forum (WEF) suggests that the computational power required to sustain the rise of AI doubles approximately every 100 days.

Related read: Global AI market to top $1tn in 2030

“The energy required to run AI tasks is already accelerating with an annual growth rate between 26% and 36%. This means by 2028, AI could be using more power than the entire country of Iceland used in 2021,” the WEF article says.

The AI lifecycle impacts the environment in two stages. First is the training phase, when the models learn and develop by digesting vast amounts of data; and second is the inference phase, when they solve real-world problems.

At present, the environmental footprint is split, with training responsible for about 20% and inference taking up 80%.

“As AI models gain traction across diverse sectors, the need for inference and its environmental footprint will escalate,” the WEF warns.

A peer-reviewed analysis in the science journal Joule says that a continuation of the current trends in AI capacity and adoption will likely result in Nvidia shipping 1.5 million AI server units a year by 2027.

When running at full capacity, these servers are expected to consume at least 85.4 terawatt-hours of electricity annually, which is equivalent to 100GW of installed capacity in the next three years.

Data centres, which make up the main AI digital infrastructure, already account for about 1%-1.5% of global electricity use.

In a hypothetical scenario in which everyone shifts to AI for mundane tasks such as performing searches on Google, every data centre would effectively experience a 10-fold increase in energy consumption, according to Alex De Vries, a data scientist at the Central Bank of the Netherlands, which conducted the analysis published by Joule.

As a result, the hydrocarbons-exporting and energy-transitioning GCC states – particularly the UAE and Saudi Arabia – appear to be a natural fit for AI, due to the presence of abundant and cheap fossil-fuel or renewable-energy resources, and the need to diversify their revenue sources away from oil. With AI promising to be a $1tn market by 2030, it offers attractive opportunities.

According to a Dubai-based senior executive with a global infrastructure investor, each country and company will eventually need to consider what part they can play in the AI value chain. 

Since Nvidia seems to have captured the microprocessor space, the other areas of opportunity are in developing computing power, algorithms and implementation. “Both Saudi Arabia and the UAE have the theoretical capability to grow into the computing power and implementation spaces, which require computing capacity through data centres and medium-skilled manpower to deploy, migrate, train and maintain [AI],” the executive says.

Greening AI

Policy adjustments could be needed to support such advances, especially when it comes to minimising AI’s carbon footprint, even as it enables the curbing of those in other sectors – including the power sector.

In addition to the vast computing and wattage requirements of AI, the region’s arid weather and very hot summer temperatures mean that regional data centres have greater cooling requirements.

To address this, the Dubai state utility has started to build a solar-powered data centre, which is understood to be the first of its kind in the world.

Saudi Arabia, which aims to have 58.7GW of renewable energy installed capacity by 2030 – accounting for about 50% of its electricity production mix – could follow a similar model. 

Abu Dhabi’s quantum computer project, in partnership with researchers at Spain’s Qilimanjaro Quantum Tech, is under way.

Unlike a classic supercomputer that operates on binary states, a quantum computer uses quantum mechanics phenomena including superposition and entanglement to generate and manipulate subatomic particles such as electrons or photons, or qubits. 

This allows greater processing powers that can enable the performance of complex calculations that would take much longer to be solved, consuming less power than a supercomputer.

The growing electricity surplus in Abu Dhabi, as all four reactors at the Barakah nuclear power plant come onstream this year, could also be allocated to data centres and AI applications.

In addition, Abu Dhabi’s plan to start procuring phase two of its Barakah nuclear energy plant may not only boost energy exports, but could also create sufficient margins to accommodate future AI computing demand.

Related read: Nuclear power will help region achieve AI ambitions

“I don’t know if that means only nuclear power can solve the demand, but it certainly is a good option and carries some strategic advantage as well,” says Karen Young, senior research scholar at Columbia University’s Centre on Global Energy Policy.

While AI needs a significant amount of electricity for computations, there should be savings through productivity increases 

Efficiency gains

While it is difficult to accurately quantify and forecast AI’s overall carbon emissions, a holistic view of its overall environmental impact is required.

In theory, while AI itself needs a significant amount of electricity for computations, there should be savings through productivity increases. “Will people need to go to the office less often, and how about the improved performance of machines?” asks the Dubai-based infrastructure investor.

However, it is also important not to overstate AI’s potential benefits to the region’s economies. While AI could be a major driver of economic diversification, Young has yet to be convinced that it will significantly boost the GCC’s GDP growth.

Job creation is a vital element of economic diversification, she tells MEED, but AI is often used to replace roles in the service sector and lower-skilled opportunities, such as those in the retail banking sector. This could impact efforts under way in several GCC states to boost employment among citizens, such as the Saudi Nationalisation Programme and the UAE’s Emiratisation drive.

On the upside, however, AI can be very good at improving efficiencies in the oil and gas industry and the power sector, and at boosting productivity.

The need of the hour appears to be establishing a clear path towards efficient AI deployment, despite the fact that the results of the technology’s full-fledged implementation remain hard to ascertain. 

“The UAE is doing a lot to attract skilled people to provide more value-added services, but that is an organic process and needs a more vibrant ecosystem of education institutions – and companies establishing more than just sales offices – to be truly called a hub,” the infrastructure investor tells MEED. “Saudi Arabia is still a bit far from that.”

Data centres meet upbeat growth 

https://image.digitalinsightresearch.in/uploads/NewsArticle/11887895/main.jpg
Jennifer Aguinaldo
Related Articles
  • Dubai awards $272m Al-Maktoum airport runway deal

    9 May 2025

     

    Dubai Aviation Engineering Projects (DAEP) has awarded a AED1bn ($272m) deal to local firm Binladin Contracting Group to construct the second runway as part of the expansion of Dubai’s Al-Maktoum International airport.

    MEED understands that the contract was finalised in Q1 of this year, and the construction works have started.

    The airport, which will cover an area of 70 square kilometres south of Dubai, will have five parallel runways, five terminal buildings and 400 aircraft gates.

    It will be five times the size of the existing Dubai International airport and have the world’s largest passenger handling capacity of 260 million passengers a year. For cargo, it will have the capacity to handle 12 million tonnes a year.

    The construction works on the first phase of the project are expected to be completed by 2032.

    Dubai approved the updated designs and timelines for its largest construction project in April last year.

    The government of Dubai said that the plan is for all operations from Dubai International airport to be transferred to Al-Maktoum International airport within 10 years.

    The government statement added that the project will create housing demand for 1 million people around the airport.

    In September last year, MEED exclusively reported that a team comprising Austria’s Coop Himmelb(l)au and Lebanon’s Dar Al-Handasah had been confirmed as the lead master planning and design consultants on the expansion of Dubai’s Al-Maktoum International airport.

    Project history

    The expansion of Al-Maktoum International airport is a long-standing project. Also known as Dubai World Central (DWC), it was officially launched in 2014 with a different design from the one approved in April 2024. Back then, it involved building the biggest airport in the world by 2050, with the capacity to handle 255 million passengers a year.

    An initial phase, due to be completed in 2030, involved increasing the airport’s capacity to 130 million passengers a year. The development was to cover an area of 56 square kilometres.

    Progress on the project slipped as the region grappled with the impact of lower oil prices and Dubai focused on developing the Expo 2020 site. Tendering for work on the project then stalled with the onset of the Covid-19 pandemic in early 2020.


    MEED’s May 2025 report on the UAE includes:

    > COMMENT: UAE is poised to weather the storm
    > GOVERNMENT & ECONOMY: UAE looks to economic longevity
    > BANKING: UAE banks dig in for new era

    > UPSTREAM: Adnoc in cruise control with oil and gas targets
    > DOWNSTREAM: Abu Dhabi chemicals sector sees relentless growth
    > POWER: AI accelerates UAE power generation projects sector
    > CONSTRUCTION: Dubai construction continues to lead region
    > TRANSPORT: UAE accelerates its $60bn transport push
    > DATABANK: UAE growth prospects head north

    https://image.digitalinsightresearch.in/uploads/NewsArticle/13847301/main.jpg
    Yasir Iqbal
  • Siemens Energy signs preliminary 14GW Iraq pact

    9 May 2025

    Register for MEED’s 14-day trial access 

    Germany’s Siemens Energy and Iraq’s Electricity Ministry have signed a preliminary agreement to add 14GW of electricity generation capacity to Iraq’s grid.

    The firms also signed two long-term service contracts for the Dibis and Al-Mussaib gas-fired power plants.

    The contract for the Dibis power plant covers two generating units with a combined capacity of 340MW.

    The five-year maintenance contract for the Al-Mussaib power station includes rehabilitating units with a capacity of 750MW and an additional 150MW, along with support for safe operations and performance optimisation.

    The announcement was made following a meeting between Siemens Energy CEO Christian Bruch and Iraqi Prime Minister Mohammed Al-Sudani, local media reported. 

    The deals were signed a few weeks after US-headquartered GE Vernova signed a memorandum of understanding (MoU) with the Iraqi government to establish 24GW of combined-cycle gas turbine (CCGT) power plants in the country.

    In late April, Iraq and Siemens Energy also announced breaking ground on a project to build a new CCGT power generation plant in Nasiriyah in Iraq’s southern Dhi Qar governorate.   

    The project is part of a $1.68bn development package that Al-Sudani recently launched.

    In addition to the CCGT plant, the other projects include the Nasiriyah Integrated Medical City, a 700-bed hospital complex and infrastructure works in the Suq Al-Shuyukh district.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/13847219/main.jpg
    Jennifer Aguinaldo
  • Abu Dhabi hopes bigger is better with Disney theme park

    8 May 2025

    Commentary
    Colin Foreman
    Editor

    Ever since Aldar Properties first launched the Yas Island project with its Yas Marina Circuit for the Abu Dhabi Grand Prix in 2006, Abu Dhabi has been steadily adding theme parks to the island’s roster of attractions. First, there was the Ferrari theme park, then came a water park, a Warner Bros theme park and, most recently, SeaWorld. 

    The theory with theme park development is bigger is better. 

    A destination needs a series of parks to create a critical mass to attract visitors who can stay and enjoy multiple parks in one visit. The example always cited is Florida, which is home to many of the world’s largest theme parks, including Disney World. 

    The theory gained particular traction in the region when Dubai Parks and Resorts opened. The company, which was public until it was acquired by Meraas in 2021, reported significant losses as it struggled to attract enough visitors.

    Although it opened with Legoland, Legoland Waterpark, Motiongate and Bollywood theme parks, insiders said that the problem with the development was that it did not have enough attractions to turn it into a successful theme park destination. 

    The financial performance of theme parks on Yas Island has not been publicly disclosed. While it is accepted that they have been more successful than their counterparts in Dubai, some say that the island still does not have the critical mass required to establish itself as a global destination for theme park visitors.


    Miral has developed a series of theme parks and other entertainment-related attractions on Yas Island 


    Enter Disney

    Disney changes that. It is the largest brand in the theme park space and will be a major attraction, but with limited information released on the project so far, it is difficult to fully gauge how significant the project will be. 

    The official release said that the project will be developed and operated by Abu Dhabi developer Miral, adding that Disney’s in-house design and engineering unit, Walt Disney Imagineering, will lead creative design and operational oversight to provide a world-class experience. It did not give any details on the ownership of the project. 

    In Hong Kong, for example, a company, Hong Kong International Theme Parks, was established as a joint venture, with the Government of Hong Kong holding 57% and The Walt Disney Company holding 43%. 

    In Japan, the structure is different. The Tokyo Disney Resort is owned and operated by Oriental Land, and the company pays licences and royalties to The Walt Disney Company.

    In interviews following the launch announcement, Miral CEO Mohamed Abdalla Al-Zaabi confirmed the arrangement will be like Tokyo. 

    Waterfront location

    The official release for the Abu Dhabi launch also said that the project is on Yas Island, which only has limited areas of land to develop. The release also said that the land is waterfront, and imagery in the launch video shows the Abu Dhabi skyline in the background, suggesting the land is on the northern waterfront of Yas Island. 

    There is a substantial tract of undeveloped land on the north shore of the island, which measures about 2 square kilometres (sq km). This is larger than the site that Hong Kong Disneyland occupies, and much smaller than Disney World in Florida, which spans an area of 111 sq km – nearly five times the size of the whole of Yas Island and nearly double the size of Abu Dhabi Island.

    The hope is that Yas Island will become a leading global theme park destination and attract large numbers of visitors wanting a holiday with multiple theme park visits

    Exclusivity clause

    Another area of interest will be whether Abu Dhabi has an exclusivity agreement with Disney for the region. No exclusivity was mentioned at the launch, but in Hong Kong, the issue became contentious when Disney announced plans to build a park shortly after Disneyland Hong Kong opened. Local politicians criticised the Hong Kong government for not including an exclusivity clause in its deal with Disney. 

    Tourism gateway

    Like Hong Kong, Abu Dhabi is a smaller economy sitting next to a larger regional player. With Saudi Arabia’s ambitious Vision 2030 strategy and its existing roster of theme park developments at Qiddiya, which includes a Six Flags, a water park and a Dragon Ball Z theme park, developers in Riyadh would likely be keen to have a Disney theme park, too. 

    For now, with Disney on board in Abu Dhabi, the hope is that Yas Island will become a leading global theme park destination and attract large numbers of visitors wanting a holiday with multiple theme park visits.

    The potential is certainly there. During the project launch, Disney highlighted that the UAE is located within a four-hour flight of one-third of the world’s population, making it a significant gateway for tourism. It is also home to the largest global airline hub in the world, with 120 million passengers travelling through Abu Dhabi and Dubai each year.

    If that potential is realised, then the bigger is better theory will be proved right. If the park’s performance disappoints, then it will suggest the region is not such a great destination for theme parks after all. 

    https://image.digitalinsightresearch.in/uploads/NewsArticle/13840555/main.gif
    Colin Foreman
  • Firms bag $850m Qatar substation contracts

    8 May 2025

    Four local and international firms have won contracts for the construction of seven high-voltage substations in Qatar.

    State-backed Qatar General Electricity & Water Corporation (Kahramaa) signed the contracts, which have a total combined value of approximately QR3.1bn ($850m), with the following firms:

    • Elsewedy Cables Qatar Company (local/Egypt)
    • Voltage Engineering (local)
    • Best/Betas Consortium (Turkey)
    • Taihan Cable & Solution (South Korea)

    Kahramaa said the projects aim to “meet electrical network demand in light of the country's fast-growing …urban development”.

    The contracts include the provision and installation of underground cables and overhead lines extending around 212 kilometres to connect these substations.

    Qatari companies won the largest share, equivalent to 58.4% or QR1.8bn, of the total contract value.

    This reflects “our great confidence in the capabilities of the local private sector and its pivotal role in achieving our development vision and achieving Qatar National Vision 2030”, said Kahramaa president Abdulla Bin Ali Al-Theyab.

    Qatar Minister of State for Energy Affairs, Saad Sherida Al-Kaabi, and senior executives from Kahramaa and the contracting firms signed the deals at a ceremony held in Doha.

    Al-Kaabi said the projects will help “ensure our networks' continued and sustainable ability to accommodate the unprecedented growth of the power sector and meet the increasing electricity demand”.

    Kahramaa said the contractors will undertake the construction of electrical substations and the connection of cables and overhead lines, as well as the development of some existing substations to increase their capacity.

    Qatar has been ramping up its power generation capacity in recent years.  

    Qatar's Emir, Sheikh Tamim Bin Hamad Al-Thani, inaugurated the Ras Laffan and Mesaieed solar photovoltaic (PV) power plants on 28 April.

    The two plants have a combined capacity of 875MW and will more than double Qatar’s solar energy production to 1,675MW.

    In February, Qatar Electricity & Water Company (QEWC) and Kahramaa signed a power-purchase agreement for a 511MW peak electricity generation plant at Ras Abu Fontas, which will have a total cost of approximately QR1.6bn. The peak power plant is scheduled to become operational by January 2027.

    A consortium led by South Korea's Doosan Enerbility, and that includes Beijing-headquartered PowerChina, will undertake the Ras Abu Fontas peak power plant's engineering, procurement and construction contract, with Germany's Siemens Energy supplying the plant's gas turbines.

    Photo credit: Kahramaa

    https://image.digitalinsightresearch.in/uploads/NewsArticle/13838850/main.jpg
    Jennifer Aguinaldo
  • OQ to take interest in Oman renewable projects

    8 May 2025

    OQ Alternative Energy (OQAE), part of Oman’s state-backed energy group OQ, will be taking shares in Oman’s renewable energy independent power projects (IPP), starting with the Ibri 3 solar scheme.

    “The direction seems to be for OQ Alternative Energy to own up to 25% shares in the upcoming solar and wind IPP projects in the sultanate,” says a source familiar with the plans.

    Before this development, private developers and investors owned the total shares in such projects, similar to the existing structure in Saudi Arabia.

    With this policy change, Oman will now be more closely aligned with the existing project structure in the UAE, where either Abu Dhabi National Energy Company (Taqa), Abu Dhabi Future Energy Company (Masdar) or the state utility, Dubai Electricity & Water Authority (Dewa), owns stakes in these projects.

    However, OQAE’s planned 25% ownership share will be slightly lower than the typical 40% to 60% shares that Taqa, Masdar or Dewa owns in the UAE’s renewable energy IPP projects.

    Currently, OQAE owns a 51% share in three renewable energy projects being developed in partnership with France’s TotalEnergies for the state-backed firm, Petroleum Development Oman (PDO).

    The Riyah-1 and Riyah-2 wind power plants will be located in the Amin and West Nimr fields in southern Oman, while the North Solar project will be situated in northern Oman.

    Each plant will have a capacity of 100MW, Total Energies announced in December.

    PDO will purchase the electricity from the plants through long-term power-purchase agreements with the developer team, whose 49% shares are owned by TotalEnergies.

    OQAE is also part of Hyport Coordination Company, a consortium comprising Belgium’s Deme Concessions and BP Oman. The consortium plans to develop a green hydrogen project in Duqm that can produce more than 50 tonnes a year of green hydrogen in its first phase by 2029.

    https://image.digitalinsightresearch.in/uploads/NewsArticle/13838800/main.jpg
    Jennifer Aguinaldo